Environmental Impact Statements and Regulations; Availability of EPA Comments, 3290-3291 [E6-651]
Download as PDF
3290
Federal Register / Vol. 71, No. 13 / Friday, January 20, 2006 / Notices
Although
the Notice was published in the Federal
Register on December 20, 2005 (70 FR
75458) with the correct EPA ICR
Number (2014.03), the OMB Control
Number in the title and in the Notice
itself was incorrect. Therefore, EPA is
clarifying that the OMB Control Number
is 2060–0498 and not 2060–0948.
SUPPLEMENTARY INFORMATION:
Need for Correction
As published, the Notice contains
errors which may prove to be
misleading and need to be corrected.
Agency Information Collection
Activities: Proposed Collection;
Comment Request; Reporting and
Recordkeeping Requirements of the
HCFC Allowance System, EPA ICR
Number 2014.03, OMB Control Number
2060–0498, Correction.
Dated: January 12, 2006.
Drusilla Hufford,
Division Director, Stratospheric Protection
Division.
[FR Doc. E6–635 Filed 1–19–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6671–5]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
wwhite on PROD1PC65 with NOTICES
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050308, ERP No. D–BLM–
K65289–NV, Ely District Resource
Management Plan, Implementation,
White Pine, Lincoln Counties and a
Portion of Nye County, NV.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20050365, ERP No. D–NRC–
F06027–OH, American Centrifuge Plant,
Gas Centrifuge Uranium Enrichment
Facility, Construction, Operation, and
Decommission, License Issuance,
Piketon, OH.
Summary: EPA expressed concerns
about the generic approach in the
preparation of the DEIS, because it does
not address all related enrichment,
VerDate Aug<31>2005
16:16 Jan 19, 2006
Jkt 208001
decommissioning, and disposal
activities and does not fully evaluate all
feasible alternatives. EPA requested
additional information on the handling
and control of source, product and
waste materials, more comprehensive
cancer rate data, more comprehensive
pollutant modeling data, a more
comprehensive radiation monitoring
scheme, and the most current annual
radiological emission data. EPA also
requested an analysis of the cumulative
impacts for (1) construction of Cylinder
Storage Yard X–745H on the currently
impaired stream (Little Beaver Creek)
due to additional erosion and
sedimentation impacts, and (2)
groundwater contamination. Rating EC2.
EIS No. 20050374, ERP No. D–BLM–
K65290–CA, Ukiah Resource
Management Plan, Implementation,
Several Counties, CA.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20050414, ERP No. D–NRC–
C06015–NY, Generic—License Renewal
of Nuclear Plants for Nine Mile Point
Nuclear Station, Units 1 and 2,
Supplement 24 to NUREG 1437,
Implementation, Lake Ontario, Oswego
County, NY.
Summary: EPA expressed
environmental concerns about the
project’s impingement and entrainment
impacts to fish and shellfish, as well as
from heat shock and the need to perform
a narrower EJ analysis. EPA also
requested that the issues of waste
treatment and pollution prevention be
addressed. Rating EC2.
EIS No. 20050441, ERP No. D–COE–
L32013–AK, Delong Mountain Terminal
Project, Proposed Construction and
Operation of Navigation Improvements,
Northwest Arctic Borough, AK.
Summary: EPA expressed
environmental concerns about potential
adverse impacts to subsistence
resources and the ability of native
hunters to harvest these resources. EPA
recommended consideration of changes
to the preferred alternative and
additional mitigation measures to
reduce these impacts be considered
during Government-to-Government
Consultation with the local Tribes. EPA
also recommended that the Final EIS
include additional information
regarding the planning process,
evaluation of alternatives, cost
estimates, and economic analysis.
Rating EC2.
EIS No. 20050469, ERP No. D–NOA–
A91073–00, Programmatic—Towards an
Ecosystem Approach for the Western
Pacific Region: From Species Based
Fishery Management Plans to Place-
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Based Fishery Ecosystem Plans,
Realignment, Implementation, Western
Pacific Region (America Samoa, Guam,
Hawaii, Commonwealth of the Northern
Mariana Islands), and U.S. Pacific
Remote Island Areas.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20050481, ERP No. D–FTA–
H40187–MO, St. Louis Metro South
Metrolink Extension, Transportation
Improvement, City of St. Louis, St.
Louis County, MO.
Summary: EPA has expressed
environmental concerns about the
proposed project regarding potential
impacts to floodplains, park and
recreation lands, water quality,
wetlands, noise and vibration. EPA is
also concerned about the uncertainty of
potential issues that could arise between
now and the projected construction start
date, which is likely greater than 5
years, considered to be the useful life of
an EIS. Rating EC2.
EIS No. 20050493, ERP No. D–NPS–
G61043–AR, Pea Ridge National
Military Park General Management Plan,
Implementation, AR.
Summary: EPA does not object to the
preferred action as described in the
DEIS. Rating LO.
EIS No. 20050460, ERP No. DS–USN–
A10072–00, Surveillance Towed Array
Sensor System Low Frequency Active
(SURTASS LFA) Sonar Systems,
Updated and Additional Information,
Implementation.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20050483, ERP No. DS–UAF–
G11038–00, Realistic Bomber Training
Initiative, Addresses Impacts of Wake
Vortices on Surface Structures, Dyess
Air Force Base, TX and Barksdale Air
Force Base, LA.
Summary: EPA does not object to the
proposed project. Rating LO.
Final EISs
EIS No. 20050420, ERP No. F–IBR–
K60035–NV, Humboldt Project
Conveyance, Transferring 83,530 Acres
from Federal Ownership to the Pershing
County Water Conservation District
(PCWCD), Pershing and Lander
Counties, NV.
Summary: EPA does not object to the
proposed project.
EIS No. 20050474, ERP No. F–COE–
K11114–CA, Mare Island Reuse of
Dredged Material Disposal Ponds as a
Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404
Permit Clean Water Act and Section 10
Permit Rivers and Harbor Act, San
E:\FR\FM\20JAN1.SGM
20JAN1
wwhite on PROD1PC65 with NOTICES
Federal Register / Vol. 71, No. 13 / Friday, January 20, 2006 / Notices
Francisco Bay Area, City of Vallejo,
Solando County, CA.
Summary: EPA concerns regarding
responsibility for key aspects of site
operations were addressed in the Final
EIS; therefore, EPA does not object to
the proposed action.
EIS No. 20050482, ERP No. F–AFS–
J65427–WY, Cottonwood II Vegetation
Management Project, Vegetation
Management in the North and South
Cottonwood Creek Drainages,
Implementation, Bridger-Teton National
Forest, Big Piney Ranger District,
Sublette County, WY.
Summary: EPA has remaining
concerns about potential adverse
impacts to water quality, soils, fish and
wildlife habitat, and socio-economic
impacts to the community.
EIS No. 20050499, ERP No. F–AFS–
H65022–MO, Mark Twain National
Forest Land and Resource Management
Plan, Implementation, Revise to the
1986 Land and Resource Management
Plan, several counties, MO.
Summary: The Final EIS addressed
EPA’s concerns on air quality impacts of
prescribed burning, degree of
cumulative impacts assessment and
provides more detail on the adaptive
management process. Therefore, EPA
does not object to the proposed action.
EIS No. 20050505, ERP No. F–AFS–
L65481–00, Caribou Travel Plan
Revision, Determine the Motorized Road
and Trail System, Implementation,
Caribou-Targhee National Forest,
Westside, Soda Spring and Montpeller
Ranger Districts, Bannock, Bear River,
Bonneville, Caribou, Franklin, Oneida
and Power Counties, ID; Box Elder and
Cache Counties, UT and Lincoln
County, WY.
Summary: The final EIS addressed
EPA’s concerns about the travel plan’s
potential adverse impacts to water
quality, air quality, and wilderness;
therefore, EPA does not object to the
proposed action.
EIS No. 20050512, ERP No. F–NPS–
D61056–DC, Rock Creek Park and the
Rock Creek and Potomac Parkway
Project, General Management Plan,
Implementation, Washington, DC.
Summary: The Final EIS has
adequately addressed EPA’s concerns
with road improvements and visitor
safety, wildlife management, and
historic resources; therefore, EPA does
not object to the proposed action.
EIS No. 20050536, ERP No. F–FAA–
A12043–00, Horizontal Launch and
Reentry of Reentry Vehicles, Facilitate
the Issuance of Licenses in United
States.
VerDate Aug<31>2005
16:16 Jan 19, 2006
Jkt 208001
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20060000, ERP No. F–BLM–
G65096–NM, McGregor Range Resource
Management Plan Amendment (RMPA),
Implementation, Otero County, NM.
Summary: No comment letter was
sent to the preparing agency.
Dated: January 17, 2006.
Pearl Young,
Management Analyst, Office of Federal
Activities.
[FR Doc. E6–651 Filed 1–19–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6671–4]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 1/9/2006 through 1/13/2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060006, Final EIS, AFS,
AK, Scott Peak Project Area, Harvesting
Timber and Development of Road
Management, Tongrass National Forest,
Petersburg Ranger District, Northeast of
Kupreanof Island, AK, Wait Period
Ends: 2/13/2006, Contact: Linda Slaght
907–772–3871.
Revision to FR Notice published on 1/
6/2006: The above EIS should have
appeared in the FR on 1/6/2006. The
Wait Period is calculated from the FR on
1/6/2006.
EIS No. 20060007, Draft Supplement,
COE, MA, Boston Harbor Inner Harbor
Maintenance Dredging Project, Updated
Information, Boston Harbor, Mystic
River and Chelsea River, MA, Comment
Period Ends: 3/6/2006, Contact: Michael
Keegan, 978–318–8087.
EIS No. 20060008, Draft EIS, FHW,
LA, East-West Corridor Highway
Component, from I–130 to Louis
Armstrong International Airport, to
Central Business District (CBD),
Jefferson, Orleans and St. Charles
Parishes, LA, Comment Period Ends: 3/
6/2006, Contact: William Farr, 225–757–
7615.
EIS No. 20060009, Final EIS, NPS,
AK, Denali National Park and Preserve
Revised Final Backcountry Management
Plan, General Management Plan
Amendment, Implementation, AK, Wait
Period Ends: 2/21/2006, Contact:
Adrienne Lindholm, 907–644–3613.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
3291
EIS No. 20060010, Draft EIS, IBR, NM,
Long-Term Miscellaneous Purposes
Contract Abstract, To Use Carlsbad
Project Water for Purposes Other than
Irrigation, Eddy County, NM, Comment
Period Ends: 3/13/2006, Contact:
Marsha Carra, 505–462–3602.
EIS No. 20060011, Draft EIS, BLM,
UT, Chapita Wells-Stagecoach Area
Natural Gas Development, Drilling and
Production Operations of Natural Gas
Wells and Associated Access Road, and
Pipelines, Uintah County, UT, Comment
Period Ends: 3/6/2006, Contact:
Stephanie Howard, 435–781–4400.
EIS No. 20060012, Final Supplement,
COE, CA, U.S. Army National Training
Center, Additional Maneuver Training
Land at Fort Irwin, Implementation, San
Bernardino County, CA, Wait Period
Ends: 2/21/2006, Contact: Ray Marler,
760–380–3035.
EIS No. 20060013, Final EIS, COE, 00,
TIERED–FEIS Baltimore Harbor and
Channels Dredged Material Management
Plan (DMMP), To Analyze Dredged
Material Placement, Port of Baltimore,
Chesapeake Bay, MD, PA, DE, WV, DC,
and NY, Wait Period Ends: 2/21/2006,
Contact: Mark Mendelsohn, 401–962–
9499.
EIS No. 20060014, Draft EIS, NPS,
OH, Dayton Aviation Heritage National
Historical Park, General Management
Plan Amendment, Implementation,
Dayton, OH, Comment Period Ends: 3/
20/2006, Contact: Lawrence Blake, 937–
225–7710.
EIS No. 20060015, Draft EIS, AFS, CA,
Kirkwood Mountain Resort, Proposed
2003 Mountain Master Development
Plan, Implementation, Eldorado
National Forest, Amador, Alpine and EL
Dorado Counties, CA, Comment Period
Ends: 3/6/2006, Contact: Sue Rodman,
530–622–5061.
EIS No. 20060016, Fourth Draft
Supplement, NOA, 00, Amendment 26
to the Gulf of Mexico Reef Fish Fishery
Management Plan, Proposed Individual
Fishing Quota (IFQ) Program to Reduce
Overcapacity in the Commercial Red
Snapper Fishery, Comment Period Ends:
3/6/2006, Contact: Dr. Roy E. Crabtree,
727–824–5308.
EIS No. 20060017, Draft EIS, AFS, FL,
Ocala National Forest Access
Designation Process, Roads and Trails
Systems Development, Implementation,
Lake, Marion and Putnam Counties, FL,
Comment Period Ends: 2/21/2006,
Contact: Will Ebaugh, 850–523–8557.
EIS No. 20060018, Final EIS, COE,
TX, Upper Trinity River Basin Project,
To Provide Flood Damage Reduction,
Ecosystem Improvement, Recreation
and Urban Revitalization, Trinity River,
Central City, Fort Worth, Tarrant
County, TX, Wait Period Ends: 2/21/
E:\FR\FM\20JAN1.SGM
20JAN1
Agencies
[Federal Register Volume 71, Number 13 (Friday, January 20, 2006)]
[Notices]
[Pages 3290-3291]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-651]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6671-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050308, ERP No. D-BLM-K65289-NV, Ely District Resource
Management Plan, Implementation, White Pine, Lincoln Counties and a
Portion of Nye County, NV.
Summary: EPA does not object to the proposed action. Rating LO.
EIS No. 20050365, ERP No. D-NRC-F06027-OH, American Centrifuge
Plant, Gas Centrifuge Uranium Enrichment Facility, Construction,
Operation, and Decommission, License Issuance, Piketon, OH.
Summary: EPA expressed concerns about the generic approach in the
preparation of the DEIS, because it does not address all related
enrichment, decommissioning, and disposal activities and does not fully
evaluate all feasible alternatives. EPA requested additional
information on the handling and control of source, product and waste
materials, more comprehensive cancer rate data, more comprehensive
pollutant modeling data, a more comprehensive radiation monitoring
scheme, and the most current annual radiological emission data. EPA
also requested an analysis of the cumulative impacts for (1)
construction of Cylinder Storage Yard X-745H on the currently impaired
stream (Little Beaver Creek) due to additional erosion and
sedimentation impacts, and (2) groundwater contamination. Rating EC2.
EIS No. 20050374, ERP No. D-BLM-K65290-CA, Ukiah Resource
Management Plan, Implementation, Several Counties, CA.
Summary: EPA does not object to the proposed project. Rating LO.
EIS No. 20050414, ERP No. D-NRC-C06015-NY, Generic--License Renewal
of Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2,
Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego
County, NY.
Summary: EPA expressed environmental concerns about the project's
impingement and entrainment impacts to fish and shellfish, as well as
from heat shock and the need to perform a narrower EJ analysis. EPA
also requested that the issues of waste treatment and pollution
prevention be addressed. Rating EC2.
EIS No. 20050441, ERP No. D-COE-L32013-AK, Delong Mountain Terminal
Project, Proposed Construction and Operation of Navigation
Improvements, Northwest Arctic Borough, AK.
Summary: EPA expressed environmental concerns about potential
adverse impacts to subsistence resources and the ability of native
hunters to harvest these resources. EPA recommended consideration of
changes to the preferred alternative and additional mitigation measures
to reduce these impacts be considered during Government-to-Government
Consultation with the local Tribes. EPA also recommended that the Final
EIS include additional information regarding the planning process,
evaluation of alternatives, cost estimates, and economic analysis.
Rating EC2.
EIS No. 20050469, ERP No. D-NOA-A91073-00, Programmatic--Towards an
Ecosystem Approach for the Western Pacific Region: From Species Based
Fishery Management Plans to Place-Based Fishery Ecosystem Plans,
Realignment, Implementation, Western Pacific Region (America Samoa,
Guam, Hawaii, Commonwealth of the Northern Mariana Islands), and U.S.
Pacific Remote Island Areas.
Summary: EPA does not object to the proposed action. Rating LO.
EIS No. 20050481, ERP No. D-FTA-H40187-MO, St. Louis Metro South
Metrolink Extension, Transportation Improvement, City of St. Louis, St.
Louis County, MO.
Summary: EPA has expressed environmental concerns about the
proposed project regarding potential impacts to floodplains, park and
recreation lands, water quality, wetlands, noise and vibration. EPA is
also concerned about the uncertainty of potential issues that could
arise between now and the projected construction start date, which is
likely greater than 5 years, considered to be the useful life of an
EIS. Rating EC2.
EIS No. 20050493, ERP No. D-NPS-G61043-AR, Pea Ridge National
Military Park General Management Plan, Implementation, AR.
Summary: EPA does not object to the preferred action as described
in the DEIS. Rating LO.
EIS No. 20050460, ERP No. DS-USN-A10072-00, Surveillance Towed
Array Sensor System Low Frequency Active (SURTASS LFA) Sonar Systems,
Updated and Additional Information, Implementation.
Summary: EPA does not object to the proposed action. Rating LO.
EIS No. 20050483, ERP No. DS-UAF-G11038-00, Realistic Bomber
Training Initiative, Addresses Impacts of Wake Vortices on Surface
Structures, Dyess Air Force Base, TX and Barksdale Air Force Base, LA.
Summary: EPA does not object to the proposed project. Rating LO.
Final EISs
EIS No. 20050420, ERP No. F-IBR-K60035-NV, Humboldt Project
Conveyance, Transferring 83,530 Acres from Federal Ownership to the
Pershing County Water Conservation District (PCWCD), Pershing and
Lander Counties, NV.
Summary: EPA does not object to the proposed project.
EIS No. 20050474, ERP No. F-COE-K11114-CA, Mare Island Reuse of
Dredged Material Disposal Ponds as a Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404 Permit Clean Water Act and
Section 10 Permit Rivers and Harbor Act, San
[[Page 3291]]
Francisco Bay Area, City of Vallejo, Solando County, CA.
Summary: EPA concerns regarding responsibility for key aspects of
site operations were addressed in the Final EIS; therefore, EPA does
not object to the proposed action.
EIS No. 20050482, ERP No. F-AFS-J65427-WY, Cottonwood II Vegetation
Management Project, Vegetation Management in the North and South
Cottonwood Creek Drainages, Implementation, Bridger-Teton National
Forest, Big Piney Ranger District, Sublette County, WY.
Summary: EPA has remaining concerns about potential adverse impacts
to water quality, soils, fish and wildlife habitat, and socio-economic
impacts to the community.
EIS No. 20050499, ERP No. F-AFS-H65022-MO, Mark Twain National
Forest Land and Resource Management Plan, Implementation, Revise to the
1986 Land and Resource Management Plan, several counties, MO.
Summary: The Final EIS addressed EPA's concerns on air quality
impacts of prescribed burning, degree of cumulative impacts assessment
and provides more detail on the adaptive management process. Therefore,
EPA does not object to the proposed action.
EIS No. 20050505, ERP No. F-AFS-L65481-00, Caribou Travel Plan
Revision, Determine the Motorized Road and Trail System,
Implementation, Caribou-Targhee National Forest, Westside, Soda Spring
and Montpeller Ranger Districts, Bannock, Bear River, Bonneville,
Caribou, Franklin, Oneida and Power Counties, ID; Box Elder and Cache
Counties, UT and Lincoln County, WY.
Summary: The final EIS addressed EPA's concerns about the travel
plan's potential adverse impacts to water quality, air quality, and
wilderness; therefore, EPA does not object to the proposed action.
EIS No. 20050512, ERP No. F-NPS-D61056-DC, Rock Creek Park and the
Rock Creek and Potomac Parkway Project, General Management Plan,
Implementation, Washington, DC.
Summary: The Final EIS has adequately addressed EPA's concerns with
road improvements and visitor safety, wildlife management, and historic
resources; therefore, EPA does not object to the proposed action.
EIS No. 20050536, ERP No. F-FAA-A12043-00, Horizontal Launch and
Reentry of Reentry Vehicles, Facilitate the Issuance of Licenses in
United States.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20060000, ERP No. F-BLM-G65096-NM, McGregor Range Resource
Management Plan Amendment (RMPA), Implementation, Otero County, NM.
Summary: No comment letter was sent to the preparing agency.
Dated: January 17, 2006.
Pearl Young,
Management Analyst, Office of Federal Activities.
[FR Doc. E6-651 Filed 1-19-06; 8:45 am]
BILLING CODE 6560-50-P