Questar Southern Trails Pipeline Company; Notice of Tariff Filing, 2035-2036 [E6-184]

Download as PDF Federal Register / Vol. 71, No. 8 / Thursday, January 12, 2006 / Notices This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–177 Filed 1–11–06; 8:45 am] Magalie R. Salas, Secretary. [FR Doc. E6–183 Filed 1–11–06; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. RP06–153–000] [Docket No. ER06–408–000] Overthrust Pipeline Company; Notice of Proposed Changes in FERC Gas Tariff PJM Interconnection, L.L.C.; Notice of Filing December 30, 2005. erjones on PROD1PC68 with NOTICES This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Take notice that on December 28, 2005, PJM Interconnection, L.L.C. (PJM) submitted for filing an unexecuted interconnection service agreement (ISA) among PJM; GSG, LLC; and Commonwealth Edison Company, designated as Original Service Agreement No. 1406. PJM requests a waiver of the Commission’s 60-day notice requirement to permit a December 23, 2005 effective date for the ISA, and asks the Commission for expedited action and a shortened comment period. PJM states that copies of this filing were served upon the parties to the ISA and the state regulatory commissions within the PJM region. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and Take notice that on December 23, 2005, Overthrust Pipeline Company (Overthrust) submitted for filing and acceptance an original and five copies its FERC Gas Tariff, First Revised Volume No. 1–A to be effective January 23, 2006. Overthrust states that copies of the filing have been served upon Overthrust’s customers and the public service commissions of Utah and Wyoming. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. VerDate Aug<31>2005 15:02 Jan 11, 2006 Jkt 208001 2035 interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 9, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–203 Filed 1–11–06; 8:45 am] BILLING CODE 6717–01–P January 4, 2006. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06–154–000] Questar Southern Trails Pipeline Company; Notice of Tariff Filing December 30, 2005. Take notice that on December 23, 2005, Questar Southern Trails Pipeline Company (Southern Trails) submitted for filing the following tariff sheets to Original Volume No. 1 of its FERC Gas Tariff to be effective January 23, 2006. Original Volume No. 1 Sixth Revised Sheet No. 1 First Revised Sheet Nos. 10 and 11 Second Revised Sheet No. 12 First Revised Sheet No. 20 Second Revised Sheet No. 21 Sixth Revised Sheet No. 30 First Revised Sheet No. 38 Second Revised Sheet No. 41 First Revised Sheet Nos. 43, 44, 47, 49, 50 and 51 Second Revised Sheet Nos. 57, 61 and 76 First Revised Sheet Nos. 85, 88 and 97 Second Revised Sheet No. 108 First Revised Sheet No. 109 Southern Trails states that a copy of this filing has been served upon its customers and the Public Service Commissions of Utah, New Mexico, Arizona, and California. Any person desiring to protest this filing must file in accordance with Rule E:\FR\FM\12JAN1.SGM 12JAN1 2036 Federal Register / Vol. 71, No. 8 / Thursday, January 12, 2006 / Notices 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–184 Filed 1–11–06; 8:45 am] Comment Date: 5 p.m. Eastern Time on January 17, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–181 Filed 1–11–06; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket Nos. EL06–35–000; EL06–36–000] [Docket No. CP05–388–000, CP06–1–000] Gregory R. Swecker v. Midland Power Cooperative and Grand Junction Utilities; Notice of Complaints Southern Natural Gas Company; Florida Gas Transmission Company; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Cypress Pipeline Project and Phase VII Expansion Project erjones on PROD1PC68 with NOTICES December 30, 2005. Take notice that on December 27, 2005, Gregory R. Swecker filed two complaints for enforcement of Public Utilities Regulatory Policies Act of 1978 (PURPA) against Midland Power Cooperative and Grand Junction Utilities. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the VerDate Aug<31>2005 15:02 Jan 11, 2006 Jkt 208001 December 30, 2005. The staff of the Federal Energy Regulatory Commission (Commission or FERC) has prepared a draft environmental impact statement (EIS) on the natural gas pipeline facilities proposed by Southern Natural Gas Company (Southern) and Florida Gas Transmission Company (FGT) in the above-referenced dockets. Southern’s Cypress Pipeline Project would be located in various counties in southern PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Georgia and northern Florida. FGT’s Phase VII Expansion Project (FGT Expansion Project) would be located in various counties in northern and central Florida. The draft EIS was prepared to satisfy the requirements of the National Environmental Policy Act. The FERC staff concludes that the proposed projects, with the appropriate mitigation measures as recommended, would have limited adverse environmental impact. The U.S. Army Corps of Engineers (COE) is participating as a cooperating agency in the preparation of the EIS because the projects would require permits pursuant to section 404 of the Clean Water Act (33 United States Code (USC) 1344) and section 10 of the Rivers and Harbors Act (33 U.S.C. 403). The COE would adopt the EIS per Title 40 Code of Federal Regulations (CFR) part 1506.3 if, after an independent review of the document, it concludes that its comments and suggestions have been satisfied. The draft EIS addresses the potential environmental effects of the construction and operation of the following facilities: Cypress Pipeline Project • About 166.6 miles of new 24-inchdiameter mainline pipeline (mainline) in Effingham, Chatham, Bryan, Liberty, Long, McIntosh, Glynn, Camden, and Charlton Counties Georgia, and Nassau, Duval, and Clay Counties, Florida; • About 9.8 miles of new 30-inchdiameter pipeline loop (loop) 1 in Chatham and Effingham Counties, Georgia; • About 0.1 mile of 12-inch-diameter lateral pipeline in Duval County, Florida; • Three new 10,350 horsepower (hp) gas-turbine-driven compressor stations in Liberty and Glynn Counties, Georgia, and in Nassau County, Florida; • Four new meter stations in Glynn County, Georgia, and in Nassau, Duval, and Clay Counties, Florida; • Modifications at two existing meter stations in Chatham and Cobb Counties, Georgia, and expansion of one meter station in Effingham County, Georgia; • 16 new block valves including 14 associated with the new mainline and two associated with the new loop; and • Four new pig 2 launcher/receiver facilities, including two in Effingham County, Georgia, one in Glynn County, 1 A loop is a segment of pipeline that is usually installed adjacent to an existing pipeline and connected to it at both ends. The loop allows more gas to be moved through the system. 2 A pig is an internal tool that can be used to clean and dry a pipeline and/or to inspect it for damage or corrosion. E:\FR\FM\12JAN1.SGM 12JAN1

Agencies

[Federal Register Volume 71, Number 8 (Thursday, January 12, 2006)]
[Notices]
[Pages 2035-2036]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-184]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-154-000]


Questar Southern Trails Pipeline Company; Notice of Tariff Filing

December 30, 2005.
    Take notice that on December 23, 2005, Questar Southern Trails 
Pipeline Company (Southern Trails) submitted for filing the following 
tariff sheets to Original Volume No. 1 of its FERC Gas Tariff to be 
effective January 23, 2006.

Original Volume No. 1

Sixth Revised Sheet No. 1
First Revised Sheet Nos. 10 and 11
Second Revised Sheet No. 12
First Revised Sheet No. 20
Second Revised Sheet No. 21
Sixth Revised Sheet No. 30
First Revised Sheet No. 38
Second Revised Sheet No. 41
First Revised Sheet Nos. 43, 44, 47, 49, 50 and 51
Second Revised Sheet Nos. 57, 61 and 76
First Revised Sheet Nos. 85, 88 and 97
Second Revised Sheet No. 108
First Revised Sheet No. 109

    Southern Trails states that a copy of this filing has been served 
upon its customers and the Public Service Commissions of Utah, New 
Mexico, Arizona, and California.
    Any person desiring to protest this filing must file in accordance 
with Rule

[[Page 2036]]

211 of the Commission's Rules of Practice and Procedure (18 CFR 
385.211). Protests to this filing will be considered by the Commission 
in determining the appropriate action to be taken, but will not serve 
to make protestants parties to the proceeding. Such protests must be 
filed in accordance with the provisions of section 154.210 of the 
Commission's regulations (18 CFR 154.210). Anyone filing a protest must 
serve a copy of that document on all the parties to the proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-184 Filed 1-11-06; 8:45 am]
BILLING CODE 6717-01-P