Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals, 76905-76907 [05-24532]
Download as PDF
Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices
Rehabilitate runway 14/32 (design);
runway 32 navigational aids
extension (design).
Rehabilitate taxiway C—phase II (design
and construction).
Rehabilitate runway 14/32—1999 20year bond debt service.
Rehabilitate runway 14/32 (construction
phase I).
Remove obstructions, runway 5/23
(design).
Acquire snow removal vehicles.
Runway 32 extension (design).
Acquire land for runway 14 runway
protection zone (Goldman parcel 30,
phase II).
Acquire land for runway 14 runway
protection zone (Walston parcel 63).
Rehabilitate runway 14/32 (construction
phase II).
Remove obstruction, runway 5/23
(construction).
Extend runway 14/32 (construction).
Improve runway 5 extended runway
safety area (design).
Rehabilitate runway 5/23 (design).
Airport master plan update.
Improve runway 5 extended runway
safety area (construction).
Construct taxiway F and apron (design
and construction).
76905
Brief Description of Projects Approved
for Collection:
Rehabilitate runway 5/23 (construction).
Snow removal equipment storage
building (construction).
Reconstruct taxiway E (design and
construction).
Reconstruct T-Hangar taxiways (design
and construction).
Decision Date: September 29, 2005.
Luis
Loarte, Washington Airports District
Office, (703) 661–1365.
FOR FURTHER INFORMATION CONTACT:
AMENDMENTS TO PFC APPROVALS
Amendment
approved date
Amendment No., City, State
97–03–C–02–GJT, Grand Junction, CO .............................
99–01–C–02–LMT, Klamath Falls, OR ................................
02–04–C–02–TLH, Tallahassee, FL ....................................
04–04–C–01–TUP, Tupelo, MS ...........................................
*96–02–C–02–DAB, Daytona Beach, FL ............................
96–02–C–03–DAB, Daytona Beach, FL ..............................
96–02–C–05–DFW, Dallas/Fort Worth, TX .........................
98–06–I–02–SJC, San Jose, CA .........................................
01–12–C–01–SJC, San Jose, CA .......................................
02–13–C–02–SJC, San Jose, CA .......................................
04–14–C–01–SJC, San Jose, CA .......................................
*93–01–C–04–BOS, Boston, MA .........................................
96–02–C–01–BOS, Boston, MA ..........................................
97–03–U–01–BOS, Boston, MA ..........................................
96–02–C–06–DFW, Dallas/Fort Worth, TX .........................
98–04–U–02–DFW, Dallas/Forth Worth, TX .......................
03–06–C–01–VLD, Valdosta, GA ........................................
*01–01–C–01–APN, Alpena, MI ..........................................
*92–01–I–02–GRR, Grand Rapids, MI ................................
95–02–U–01–GRR, Grand Rapids, MI ................................
*00–04–C–02–SJU, San Juan, PR ......................................
99–04–C–03–CAK, Akron, OH ............................................
02–05–C–01–CAK, Akron, OH ............................................
94–01–C–04–ISP, Islip, NY .................................................
96–02–C–01–ISP, Islip, NY .................................................
99–03–C–01–ISP, Islip, NY .................................................
01–04–C–01–ISP, Islip, NY .................................................
00–06–C–02–COS, Colorado Springs, CO .........................
02–07–C–01–COS, Colorado Springs, CO .........................
01–07–I–01–YKM, Yakima, WA ..........................................
*98–01–C–01–MWH, Moses Lake, WA ..............................
10/25/04
03/25/05
03/28/05
04/18/05
05/20/05
08/16/05
08/31/05
09/02/05
09/02/05
09/02/05
09/02/05
09/02/05
09/02/05
09/02/05
09/07/05
09/07/05
09/08/05
09/09/05
09/09/05
09/09/05
09/09/05
09/15/05
09/15/05
09/19/05
09/19/05
09/19/05
09/19/05
09/22/05
09/22/05
09/22/05
09/27/05
Original
approved net
PFC revenue
$1,932,000
426,374
11,500,458
170,000
8,254,367
8,343,983
90,172,120
35,000,000
9,407,000
146,485,000
97,197,000
764,316,000
163,037,000
NA
88,751,233
NA
185,100
268,480
94,359,802
NA
98,663,704
2,815,200
7,277,000
21,956,043
4,058,200
180,000
441,949
8,441,519
7,566,700
456,000
470,000
Amended
approved net
PFC revenue
$1,408,237
426,374
11,572,800
192,500
8,343,983
20,646,852
88,751,233
72,022,700
38,671,724
61,589,000
39,131,000
683,205,217
163,037,000
NA
88,751,233
NA
179,596
268,480
94,359,802
NA
103,572,267
3,516,214
9,665,854
21,974,503
4,059,528
204,000
444,546
3,374,865
5,620,814
456,000
470,000
Original
estimated
charge exp.
date
09/01/04
11/01/04
02/01/07
07/01/14
09/01/07
03/01/10
10/01/98
07/01/01
09/01/08
08/01/14
09/01/17
10/01/17
09/01/12
10/01/17
10/01/98
10/01/98
09/01/04
11/01/09
07/01/19
07/01/19
08/01/09
09/01/02
11/01/06
09/01/05
09/01/06
11/01/06
01/01/07
09/01/03
02/01/06
03/01/05
03/01/09
Amended
estimated
charge exp.
date
07/01/02
05/01/04
02/01/07
07/01/14
03/01/10
03/01/20
10/01/98
07/01/01
09/01/08
08/01/14
07/01/14
02/01/11
10/01/22
02/01/11
10/01/98
10/01/98
09/01/04
08/01/08
10/01/16
10/01/16
06/01/08
09/01/02
05/01/05
09/01/05
09/01/06
11/01/06
01/01/07
01/01/01
11/01/04
03/01/02
01/01/16
NOTE: The amendments denoted by an asterisk (*) include a change to the PFC level charged from $3 per enplaned passenger to $4.50 per
enplaned passenger. For Boston, MA, this change is effective on October 1, 2005. For Daytona Beach, FL, Grand Rapids, MI, And Moses Lake,
WA, this change is effective on November 1, 2005. For Alpena, MI and San Juan, PR, this change is effective on December 1, 2005.
DEPARTMENT OF TRANSPORTATION
BILLING CODE 4910–13–M
wwhite on PROD1PC65 with NOTICES
Dated: Issued in Washington, DC, on
December 20, 2005.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
[FR Doc. 05–24504 Filed 12–27–05; 8:45 am]
AGENCY:
Federal Aviation Administration
Notice of Passenger Facility Charge
(PFC) Approvals and Disapprovals
Federal Aviation
Administration (FAA), DOT.
Monthly Notice of PFC
Approvals and Disapprovals. In October
2005, there were five applications
approved. This notice also includes
ACTION:
VerDate Aug<31>2005
17:37 Dec 27, 2005
Jkt 208001
PO 00000
Frm 00171
Fmt 4703
Sfmt 4703
information on two applications,
approved in September 2005,
inadvertently left off the September
2005 notice. Additionally, 14 approved
amendments to previously approved
applications are listed.
SUMMARY: The FAA publishes a monthly
notice, as appropriate, of PFC approvals
and disapprovals under the provisions
of the Aviation Safety and Capacity
Expansion Act of 1990 (Title IX of the
Omnibus Budget Reconciliation Act of
E:\FR\FM\28DEN1.SGM
28DEN1
76906
Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices
wwhite on PROD1PC65 with NOTICES
1990) (Pub. L. 101–508) and Part 158 of
the Federal Aviation Regulations (14
CFR Part 158). This notice is published
pursuant to paragraph d of § 158.29.
PFC Applications Approved
Public Agency: Los Angeles World
Airports, Los Angeles, California.
Application Number: 05–05–C–00–
LAX.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $267,249,968.
Earliest Charge Effective Date:
December 1, 2005.
Estimated Charge Expiration Date:
October 1, 2009.
Class of Air Carriers not Required to
Collect PFC’s: All air taxi/commercial
operators filing FAA Form 1800–31.
Determination: Approved. Based on
information contained in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at Los
Angeles International Airport (LAX).
Brief Description of Projects Approved
for Collection at LAX and Use at a $3.00
PFC Level:
Apron lighting upgrade.
Southside airfield improvement
program and new large aircraft
integrated study.
Century cargo complex—demolition of
air freight 3.
Taxilane C–10 reconstruction.
Master plan.
Aircraft rescue and firefighting vehicles.
Brief Description of Project Approved
for Collection at LAX and Use at
Palmdale Production Flight/Test
Installation Air Force Plant 42 at a
$3.00 PFC Level: Master plan.
Brief Description of Project Approved
for Collection at LAX and Use at LAX,
Ontario International Airport, and Van
Nuys Airport at a $3.00 PFC Level:
Aircraft noise monitoring and
management system.
Brief Description of Projects Approved
for Collection at LAX and Use at LAX
at a $4.50 PFC Level:
Southside airfield improvement
program—airfield intersection
improvements.
Southside airfield improvement
program—remote boarding facilities
modifications.
Tom Bradley International terminal
interior improvements program—
interior improvements and bag
screening systems.
Implementation of information
technology security master plan.
Brief Description of Project
Disapproved for Collection at LAX and
VerDate Aug<31>2005
17:37 Dec 27, 2005
Jkt 208001
Use at LAX: Automatic external
defibrillator installation.
Determination: As a stand-alone
project, the automatic external
defibrillator does not meet the
requirements of § 158.15(a). In addition,
this project does not meet the
requirements of § 158.15(b)(2). The
project is not Airport Improvement
Program (AIP) eligible in accordance
with paragraph 540 of FAA Order 5100/
38C, AIP Handbook (June 28, 2005).
Decision Date: September 23, 2005.
FOR FURTHER INFORMATION CONTACT:
Ruben Cabalbag, Western Pacific
Airports Regional Office, (310) 725–
3630.
Public Agency: Puerto Rico Ports
Authority, Aguadilla, Puerto Rico.
Application Number: 05–02–C–00–
BQN.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $9,828,476.
Earliest Charge Effective Date:
December 1, 2005.
Estimated Charge Expiration Date:
December 1, 2021.
Class of Air Carriers Not Required to
Collect PFC’s: None.
Brief Description of Projects Approved
for Collection and Use:
Study, design, and construct new
runway pavement 8/26.
Expand passenger terminal.
Rehabilitate apron slabs.
Brief Description of Disapproved
Project: Construct aircraft rescue and
firefighting training pit.
Determination: This project did not
meet the requirements of
§ 158.25(c)(1)(ii)(B).
Decision Date: September 29, 2005.
FOR FURTHER INFORMATION CONTACT:
Susan Moore, Orlando Airports District
Office, (407) 812–6331, extension 20.
Public Agency: Jackson Hole Airport
Board, Jackson, Wyoming.
Application Number: 05–10–C–00–
JAC.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $2,277,186.
Earliest Charge Effective Date: January
1, 2007.
Estimated Charge Expiration Date:
August 1, 2009.
Class of Air Carriers Not Required To
Collect PFC’S: None.
Brief Description of Projects Approved
for Collection and Use:
Expand air carrier apron.
Planning studies.
PO 00000
Frm 00172
Fmt 4703
Sfmt 4703
Rehabilitate taxiway A and associated
connectors.
Snow removal equipment.
PFC application and administration
fees.
Decision Date: October 5, 2005.
FOR FURTHER INFORMATION CONTACT:
Chris Schaffer, Denver Airports District
Office, (303) 342–1258.
Public Agency: State of Alaska
Department of Transportation and
Public Facilities, Anchorage, Alaska.
Application Number: 05–02–C–00–
ANC.
Application Type: Impose and use a
PFC.
PFC Level: $3.00.
Total PFC Revenue Approved in This
Decision: $14,000,000.
Earliest Charge Effective Date: January
1, 2006.
Estimated Charge Expiration Date:
July 1, 2009.
Class of Air Carriers Not Required To
Collect PFC’S: None.
Brief Description of Project Approved
for Collection and Use: Concourse A
and B remodel.
Decision Date: October 12, 2005.
FOR FURTHER INFORMATION CONTACT: Jim
Lomen, Alaska Region Airports
Division, (907) 271–5816.
Public Agency: Golden Triangle
Regional Authority, Columbus,
Mississippi.
Application Number: 06–04–C–00–
GTR.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: 125,000.
Charge Effective Date: October 1,
2007.
Estimated Charge Expiration Date:
October 1, 2009.
Class of Air Carriers Not Required to
Collect PFC’S: None.
Brief Description of Project Approved
for Collection and Use: Build air cargo
ramp.
Decision Date: October 18, 2005.
FOR FURTHER INFORMATION CONTACT:
David Shumate, Jackson Airports
District Office, (601) 664–9882.
Public Agency: Fort Wayne-Allen
County Airport Authority, Fort Wayne,
Indiana.
Application Number: 05–03–C–00–
FWA.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $2,045,000.
Earliest Charge Effective Date:
October 1, 2016.
E:\FR\FM\28DEN1.SGM
28DEN1
Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices
Estimated Charge Expiration Date:
March 1, 2018.
Class of Air Carriers Not Required To
Collect PFC’S: Non-scheduled/ondemand air carriers.
Determination: Approved. Based on
information contained in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at Fort
Wayne International Airport.
Brief Description of Projects Approved
for Collection and Use:
Aircraft rescue and firefighting vehicle.
Four-by-four high speed runway snow
blower.
Four-by-four high speed runway snow
plow.
Four-by-four high speed runway snow
plow.
Mobile deicer collector unit.
Decision Date: October 21, 2005.
FOR FURTHER INFORMATION CONTACT: Gary
Wilson, Chicago Airports District Office,
(847) 294–7631.
Public Agency: Houghton County
Memorial Airport Committee, Calumet,
Michigan.
Application Number: 06–10–C–00–
CMX.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $130,367.
Earliest Charge Effective Date:
September 1, 2006.
Class of Air Carriers Not Required To
Collect PFC’s: None.
Brief Description of Projects Approved
for Collection and Use:
Storm water removal from sanitary
sewer system.
Security fence/perimeter road wetland
mitigation and/or preservation.
Security fence/perimeter road
delineation of wetlands.
Snow removal equipment—snow
blower procurement.
Stream remediation, phase 1, check
dams and sedimentation basins.
76907
Stream remediation, phase 2,
construction.
Snow removal equipment—push plow
for front-end loader procurement.
Emergency radios procurement (800
Mhz).
Rehabilitate runway 7/25 and portion of
taxiway C edge lighting.
Runway 7/15 safety area delineation of
wetlands.
Runway 7/25 safety area environmental
assessment.
Perimeter road modifications.
PFC application preparation
reimbursement.
Reimbursement of PFC account audit
charges for fiscal years 1999 through
2004.
Terminal holding area improvements.
Decision Date: October 24, 2005.
FOR FURTHER INFORMATION CONTACT:
Jason Watt, Detroit Airports District
Office, (734) 229–2906.
AMENDMENTS TO PFC APPROVALS
Amendment
approved date
Amendment No., City, State
97–01–C–03–SBA, Santa Barbara, CA ...............................
02–03–C–02–SBA, Santa Barbara, CA ...............................
02–04–C–01–RDM, Redmond, OR .....................................
94–01–C–02–SLC, Salt Lake City, UT ................................
96–02–C–02–SLC, Salt Lake City, UT ................................
01–07–C–01–JAC, Jackson, WY ........................................
*03–02–C–03–ACY, Atlantic City, NJ ..................................
*99–01–C–05–ACY, Atlantic City, NJ ..................................
*04–03–C–01–ACY, Atlantic City, NJ ..................................
*92–01–C–01–FWA, Fort Wayne, IN ..................................
98–01–C–01–FWA, Fort Wayne, IN ....................................
92–01–C–05–RSW, Fort Myers, FL ....................................
94–03–U–01–RSW, Fort Myers, FL ....................................
97–04–U–01–RSW, Fort Myers, FL ....................................
09/15/05
09/15/05
09/27/05
09/28/05
09/28/05
10/06/05
10/19/05
10/20/05
10/20/05
10/21/05
10/21/05
10/25/05
10/26/05
10/27/05
Original
approved net
PFC revenue
$3,282,698
2,001,560
1,968,545
99,230,800
61,992,646
111,930
1,363,575
6,801,935
750,000
26,563,457
500,000
155,965,924
NA
NA
Amended
approved net
PFC revenue
$3,384,520
2,420,080
2,083,546
104,375,119
61,798,349
111,005
1,363,575
8,380,852
750,000
26,563,457
0
149,922,253
NA
NA
Original
estimated
charge exp.
date
01/01/00
08/01/06
10/01/06
03/01/99
07/01/01
09/01/02
04/01/06
07/01/05
11/01/06
03/01/15
01/01/16
03/01/11
03/01/11
03/01/11
Amended
estimated
charge exp.
date
01/01/00
02/01/06
04/01/07
03/01/99
07/01/01
09/01/02
11/01/06
02/01/06
07/01/07
10/01/16
03/01/15
09/01/06
09/01/06
09/01/06
NOTE: The amendments denoted by an asterisk (*) include a change to the PFC level charged from $3 per enplaned passenger to $4.50 per
enplaned passenger. For Fort Wayne, IN and Atlantic City, NJ, this change is effective on December 1, 2005.
Issued in Washington, DC, on December
21, 2005.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
[FR Doc. 05–24532 Filed 12–27–05; 8:45 am]
BILLING CODE 4910–13–M
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Proposed Technical Standard Order
(TSO)–C166a, Extended Squitter
Automatic Dependent Surveillance—
Broadcast (ADS–B) and Traffic
Information Service—Broadcast (TIS–
B) Equipment
Federal Aviation
Administration, DOT.
ACTION: Notice of availability and
requests for public comment.
wwhite on PROD1PC65 with NOTICES
AGENCY:
SUMMARY: This notice announces the
availability of, and requests comments
on the proposed revision to technical
standard order (TSO)–C166, Extended
VerDate Aug<31>2005
17:37 Dec 27, 2005
Jkt 208001
PO 00000
Frm 00173
Fmt 4703
Sfmt 4703
Squitter Automatic Dependent
Surveillance—Broadcast (ADS–B) and
Traffic Information Service—Broadcast
(TIS–B) Equipment Operating on the
Radio Frequency of 1090 Megahertz
(MHz), issued September 20, 2004. The
resulting changes to this proposed
revised TSO tells persons seeking a TSO
authorization or letter of design
approval (LODA) what minimum
performance standards (MPS) their
extended squitter ADS–B and TIS–B
equipment must meet to be identified
with the applicable TSO marking.
Comments must be received on
or before January 27, 2006.
DATES:
Send all comments on the
proposed technical standard order to:
ADDRESSES:
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 70, Number 248 (Wednesday, December 28, 2005)]
[Notices]
[Pages 76905-76907]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-24532]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge (PFC) Approvals and
Disapprovals
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Monthly Notice of PFC Approvals and Disapprovals. In October
2005, there were five applications approved. This notice also includes
information on two applications, approved in September 2005,
inadvertently left off the September 2005 notice. Additionally, 14
approved amendments to previously approved applications are listed.
-----------------------------------------------------------------------
SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC
approvals and disapprovals under the provisions of the Aviation Safety
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget
Reconciliation Act of
[[Page 76906]]
1990) (Pub. L. 101-508) and Part 158 of the Federal Aviation
Regulations (14 CFR Part 158). This notice is published pursuant to
paragraph d of Sec. 158.29.
PFC Applications Approved
Public Agency: Los Angeles World Airports, Los Angeles, California.
Application Number: 05-05-C-00-LAX.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $267,249,968.
Earliest Charge Effective Date: December 1, 2005.
Estimated Charge Expiration Date: October 1, 2009.
Class of Air Carriers not Required to Collect PFC's: All air taxi/
commercial operators filing FAA Form 1800-31.
Determination: Approved. Based on information contained in the
public agency's application, the FAA has determined that the approved
class accounts for less than 1 percent of the total annual enplanements
at Los Angeles International Airport (LAX).
Brief Description of Projects Approved for Collection at LAX and
Use at a $3.00 PFC Level:
Apron lighting upgrade.
Southside airfield improvement program and new large aircraft
integrated study.
Century cargo complex--demolition of air freight 3.
Taxilane C-10 reconstruction.
Master plan.
Aircraft rescue and firefighting vehicles.
Brief Description of Project Approved for Collection at LAX and Use
at Palmdale Production Flight/Test Installation Air Force Plant 42 at a
$3.00 PFC Level: Master plan.
Brief Description of Project Approved for Collection at LAX and Use
at LAX, Ontario International Airport, and Van Nuys Airport at a $3.00
PFC Level: Aircraft noise monitoring and management system.
Brief Description of Projects Approved for Collection at LAX and
Use at LAX at a $4.50 PFC Level:
Southside airfield improvement program--airfield intersection
improvements.
Southside airfield improvement program--remote boarding facilities
modifications.
Tom Bradley International terminal interior improvements program--
interior improvements and bag screening systems.
Implementation of information technology security master plan.
Brief Description of Project Disapproved for Collection at LAX and
Use at LAX: Automatic external defibrillator installation.
Determination: As a stand-alone project, the automatic external
defibrillator does not meet the requirements of Sec. 158.15(a). In
addition, this project does not meet the requirements of Sec.
158.15(b)(2). The project is not Airport Improvement Program (AIP)
eligible in accordance with paragraph 540 of FAA Order 5100/38C, AIP
Handbook (June 28, 2005).
Decision Date: September 23, 2005.
FOR FURTHER INFORMATION CONTACT: Ruben Cabalbag, Western Pacific
Airports Regional Office, (310) 725-3630.
Public Agency: Puerto Rico Ports Authority, Aguadilla, Puerto Rico.
Application Number: 05-02-C-00-BQN.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $9,828,476.
Earliest Charge Effective Date: December 1, 2005.
Estimated Charge Expiration Date: December 1, 2021.
Class of Air Carriers Not Required to Collect PFC's: None.
Brief Description of Projects Approved for Collection and Use:
Study, design, and construct new runway pavement 8/26.
Expand passenger terminal.
Rehabilitate apron slabs.
Brief Description of Disapproved Project: Construct aircraft rescue
and firefighting training pit.
Determination: This project did not meet the requirements of Sec.
158.25(c)(1)(ii)(B).
Decision Date: September 29, 2005.
FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District
Office, (407) 812-6331, extension 20.
Public Agency: Jackson Hole Airport Board, Jackson, Wyoming.
Application Number: 05-10-C-00-JAC.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $2,277,186.
Earliest Charge Effective Date: January 1, 2007.
Estimated Charge Expiration Date: August 1, 2009.
Class of Air Carriers Not Required To Collect PFC'S: None.
Brief Description of Projects Approved for Collection and Use:
Expand air carrier apron.
Planning studies.
Rehabilitate taxiway A and associated connectors.
Snow removal equipment.
PFC application and administration fees.
Decision Date: October 5, 2005.
FOR FURTHER INFORMATION CONTACT: Chris Schaffer, Denver Airports
District Office, (303) 342-1258.
Public Agency: State of Alaska Department of Transportation and
Public Facilities, Anchorage, Alaska.
Application Number: 05-02-C-00-ANC.
Application Type: Impose and use a PFC.
PFC Level: $3.00.
Total PFC Revenue Approved in This Decision: $14,000,000.
Earliest Charge Effective Date: January 1, 2006.
Estimated Charge Expiration Date: July 1, 2009.
Class of Air Carriers Not Required To Collect PFC'S: None.
Brief Description of Project Approved for Collection and Use:
Concourse A and B remodel.
Decision Date: October 12, 2005.
FOR FURTHER INFORMATION CONTACT: Jim Lomen, Alaska Region Airports
Division, (907) 271-5816.
Public Agency: Golden Triangle Regional Authority, Columbus,
Mississippi.
Application Number: 06-04-C-00-GTR.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: 125,000.
Charge Effective Date: October 1, 2007.
Estimated Charge Expiration Date: October 1, 2009.
Class of Air Carriers Not Required to Collect PFC'S: None.
Brief Description of Project Approved for Collection and Use: Build
air cargo ramp.
Decision Date: October 18, 2005.
FOR FURTHER INFORMATION CONTACT: David Shumate, Jackson Airports
District Office, (601) 664-9882.
Public Agency: Fort Wayne-Allen County Airport Authority, Fort
Wayne, Indiana.
Application Number: 05-03-C-00-FWA.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $2,045,000.
Earliest Charge Effective Date: October 1, 2016.
[[Page 76907]]
Estimated Charge Expiration Date: March 1, 2018.
Class of Air Carriers Not Required To Collect PFC'S: Non-scheduled/
on-demand air carriers.
Determination: Approved. Based on information contained in the
public agency's application, the FAA has determined that the approved
class accounts for less than 1 percent of the total annual enplanements
at Fort Wayne International Airport.
Brief Description of Projects Approved for Collection and Use:
Aircraft rescue and firefighting vehicle.
Four-by-four high speed runway snow blower.
Four-by-four high speed runway snow plow.
Four-by-four high speed runway snow plow.
Mobile deicer collector unit.
Decision Date: October 21, 2005.
FOR FURTHER INFORMATION CONTACT: Gary Wilson, Chicago Airports
District Office, (847) 294-7631.
Public Agency: Houghton County Memorial Airport Committee, Calumet,
Michigan.
Application Number: 06-10-C-00-CMX.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $130,367.
Earliest Charge Effective Date: September 1, 2006.
Class of Air Carriers Not Required To Collect PFC's: None.
Brief Description of Projects Approved for Collection and Use:
Storm water removal from sanitary sewer system.
Security fence/perimeter road wetland mitigation and/or preservation.
Security fence/perimeter road delineation of wetlands.
Snow removal equipment--snow blower procurement.
Stream remediation, phase 1, check dams and sedimentation basins.
Stream remediation, phase 2, construction.
Snow removal equipment--push plow for front-end loader procurement.
Emergency radios procurement (800 Mhz).
Rehabilitate runway 7/25 and portion of taxiway C edge lighting.
Runway 7/15 safety area delineation of wetlands.
Runway 7/25 safety area environmental assessment.
Perimeter road modifications.
PFC application preparation reimbursement.
Reimbursement of PFC account audit charges for fiscal years 1999
through 2004.
Terminal holding area improvements.
Decision Date: October 24, 2005.
FOR FURTHER INFORMATION CONTACT: Jason Watt, Detroit Airports District
Office, (734) 229-2906.
Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
Original Amended
Amendment Original Amended estimated estimated
Amendment No., City, State approved date approved net approved net charge exp. charge exp.
PFC revenue PFC revenue date date
----------------------------------------------------------------------------------------------------------------
97-01-C-03-SBA, Santa Barbara, 09/15/05 $3,282,698 $3,384,520 01/01/00 01/01/00
CA.............................
02-03-C-02-SBA, Santa Barbara, 09/15/05 2,001,560 2,420,080 08/01/06 02/01/06
CA.............................
02-04-C-01-RDM, Redmond, OR..... 09/27/05 1,968,545 2,083,546 10/01/06 04/01/07
94-01-C-02-SLC, Salt Lake City, 09/28/05 99,230,800 104,375,119 03/01/99 03/01/99
UT.............................
96-02-C-02-SLC, Salt Lake City, 09/28/05 61,992,646 61,798,349 07/01/01 07/01/01
UT.............................
01-07-C-01-JAC, Jackson, WY..... 10/06/05 111,930 111,005 09/01/02 09/01/02
*03-02-C-03-ACY, Atlantic City, 10/19/05 1,363,575 1,363,575 04/01/06 11/01/06
NJ.............................
*99-01-C-05-ACY, Atlantic City, 10/20/05 6,801,935 8,380,852 07/01/05 02/01/06
NJ.............................
*04-03-C-01-ACY, Atlantic City, 10/20/05 750,000 750,000 11/01/06 07/01/07
NJ.............................
*92-01-C-01-FWA, Fort Wayne, IN. 10/21/05 26,563,457 26,563,457 03/01/15 10/01/16
98-01-C-01-FWA, Fort Wayne, IN.. 10/21/05 500,000 0 01/01/16 03/01/15
92-01-C-05-RSW, Fort Myers, FL.. 10/25/05 155,965,924 149,922,253 03/01/11 09/01/06
94-03-U-01-RSW, Fort Myers, FL.. 10/26/05 NA NA 03/01/11 09/01/06
97-04-U-01-RSW, Fort Myers, FL.. 10/27/05 NA NA 03/01/11 09/01/06
----------------------------------------------------------------------------------------------------------------
Note: The amendments denoted by an asterisk (*) include a change to the PFC level charged from $3 per enplaned
passenger to $4.50 per enplaned passenger. For Fort Wayne, IN and Atlantic City, NJ, this change is effective
on December 1, 2005.
Issued in Washington, DC, on December 21, 2005.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 05-24532 Filed 12-27-05; 8:45 am]
BILLING CODE 4910-13-M