Download as PDF 76470 Federal Register / Vol. 70, No. 247 / Tuesday, December 27, 2005 / Notices Federal government; State, local or tribal governments. Number of Respondents: 711. Frequency: On occasion. Average time per Response: Five minutes (.08 hr.) per response. Estimated Total Burden Hours: 57. NUCLEAR REGULATORY COMMISSION Tennessee Valley Authority [Docket No. 50–390] IV. Public Participation—Submission of Comments on This Notice and Internet Access to Comments and Submissions You may submit comments and supporting materials in response to this notice by (1) hard copy, (2) FAX transmission (facsimile), or (3) electronically through the OSHA Webpage. Because of security-related problems, there may be a significant delay in the receipt of comments by regular mail. Please contact the OSHA Docket Office at (202) 693–2350 (TTY (877) 889–5627) for information about security procedures concerning the delivery of submissions by express delivery, hand delivery and courier service. All comments, submissions and background documents are available for inspection and copying at the OSHA Docket Office at the above address. Comments and submissions posted on OSHA’s Webpage are available at https:// www.OSHA.gov. Contact the OSHA Docket Office for information about materials not available through the OSHA Webpage and for assistance using the Webpage to locate docket submissions. Electronic copies of this Federal Register notice as well as other relevant documents are available on OSHA’s Webpage. Since all submissions become public, private information such as social security numbers should not be submitted. V. Authority and Signature bjneal on PROD1PC70 with NOTICES Jonathan L. Snare, Acting Assistant Secretary of Labor for Occupational Safety and Health, directed the preparation of this notice. The authority for this notice is the Paperwork Reduction Act of 1995 (44 U.S.C. 3506 et seq.), and Secretary of Labor’s Order No. 5–2002 (67 FR 65008). Signed at Washington, DC, on December 20, 2005. Jonathan L. Snare, Acting Assistant Secretary of Labor [FR Doc. 05–24463 Filed 12–23–05; 8:45 am] BILLING CODE 4510–26–M VerDate Aug<31>2005 14:54 Dec 23, 2005 Jkt 208001 Watts Bar Nuclear Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from Title 10 of the Code of Federal Regulations (10 CFR) part 50, Appendix E, Sections IV.F.2.b and c for Facility Operating License No. NPF–90, issued to Tennessee Valley Authority (TVA or the licensee), for operation of the Watts Bar Nuclear Power Plant (WBN), Unit 1, located in Rhea County, Tennessee. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact. Environmental Assessment Identification of the Proposed Action The proposed action, as described in the licensee’s application for a one-time exemption to the requirements of 10 CFR part 50, Appendix E, dated October 5, 2005, would allow the licensee to postpone the biennial, full-participation emergency exercise from November 2, 2005, to June 7, 2006. The licensee’s letter requested an exemption from sections IV.F.2.b and c of Appendix E to 10 CFR part 50 regarding exercises involving the onsite and offsite emergency plans, as well as TVA’s Radiological Emergency Plan Sections 14.2.1.1 and 14.2.1.3. The NRC staff has determined that the requirements of Appendix E to 10 CFR part 50, Sections IV.F.2.b and 2.c are applicable to the circumstances of the licensee’s request and that an exemption from those requirements is appropriate. The licensee also stated in its October 5, 2005, letter that WBN will resume its normal biennial exercise cycle in 2007. The Need for the Proposed Action The proposed exemption from 10 CFR part 50, appendix E, sections IV.F.2.b and c is needed because the planned full-participation exercise originally scheduled for November 2, 2005, was not performed. The Federal Emergency Management Agency, which normally participates in the evaluated, fullparticipation exercise, and the Tennessee Emergency Management Agency were unable to provide the necessary resources for the exercise due to the impact of Hurricane Katrina. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Environmental Impacts of the Proposed Action The NRC has completed its safety evaluation of the proposed action and concludes that the proposed exemption would not present an undue risk to the public health and safety. The details of the NRC staff’s safety evaluation will be provided in the exemption that will be issued as part of the letter to the licensee approving the exemption to the regulation. The proposed action relates to the exercising of the emergency response plan, which has no effect on the operation of the facility. The proposed action will not significantly increase the probability or consequences of accidents. No changes are being made in the types of effluents that may be released offsite. There is no significant increase in the amount of any effluent released offsite. There is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action. With regard to potential nonradiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect nonradiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action. Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action. Environmental Impacts of the Alternative to the Proposed Action As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the ‘‘no-action’’ alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar. Alternative Use of Resources The action does not involve the use of any different resources than those previously considered in the Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2, NUREG 0498, dated December 1978, and a supplement to the Final Environmental Statement (NUREG 0498 Supplement No. 1), dated April 1995. Agencies and Persons Consulted In accordance with its stated policy, on November 9, 2005, the staff consulted with the Tennessee State E:\FR\FM\27DEN1.SGM 27DEN1 Federal Register / Vol. 70, No. 247 / Tuesday, December 27, 2005 / Notices official, Elizabeth Flanagan of the Tennessee Bureau of Radiological Health, regarding the environmental impact of the proposed action. The State official had no comments. Finding of No Significant Impact On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action. For further details with respect to the proposed action, see the licensee’s letter dated October 5, 2005. Documents may be examined, and/or copied for a fee, at the NRC’s Public Document Room (PDR), located at One White Flint North, Public File Area O–1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https:// www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800– 397–4209 or 301–415–4737, or by e-mail to pdr@nrc.gov. Dated at Rockville, Maryland, this 19th day of December 2005. For the Nuclear Regulatory Commission. Douglas V. Pickett, Senior Project Manager, Plant Licensing Branch II–2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E5–7867 Filed 12–23–05; 8:45 am] constitute a clearly unwarranted invasion of personal privacy. The agenda for the subject meeting shall be as follows: Wednesday, January 11, 2006—8 a.m.– 9 a.m. The Committee will discuss proposed ACNW activities and related matters. The purpose of this meeting is to gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official, Mr. Michael P. Lee (Telephone: 301/415–6887) between 8:15 a.m. and 5 p.m. (ET) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Further information regarding this meeting can be obtained by contacting the Designated Federal Official between 8:15 a.m. and 5 p.m. (ET). Persons planning to attend this meeting are urged to contact the above named individual at least two working days prior to the meeting to be advised of any potential changes in the agenda. Dated: December 19, 2005. Michael L. Scott, Branch Chief, ACRS/ACNW. [FR Doc. E5–7838 Filed 12–23–05; 8:45 am] BILLING CODE 7590–01–P PENSION BENEFIT GUARANTY CORPORATION BILLING CODE 7590–01–P Submission of Information Collection for OMB Review; Comment Request; Notice of Failure To Make Required Contributions NUCLEAR REGULATORY COMMISSION AGENCY: bjneal on PROD1PC70 with NOTICES Advisory Committee on Nuclear Waste Meeting On Planning and Procedures; Notice of Meeting The Advisory Committee on Nuclear Waste (ACNW) will hold a Planning and Procedures meeting on January 11, 2006, Room T–2B1, 11545 Rockville Pike, Rockville, Maryland. The entire meeting will be open to public attendance, with the exception of a portion that may be closed pursuant to 5 U.S.C. 552b(c)(2) and (6) to discuss organizational and personnel matters that relate solely to internal personnel rules and practices of ACNW, and information the release of which would VerDate Aug<31>2005 14:54 Dec 23, 2005 Jkt 208001 Pension Benefit Guaranty Corporation. ACTION: Notice of request for extension of OMB approval. SUMMARY: The Pension Benefit Guaranty Corporation (PBGC) is requesting that the Office of Management and Budget (OMB) extend approval, under the Paperwork Reduction Act, of the collection of information under part 4043 of its regulations relating to Notice of Failure to Make Required Contributions (OMB control number 1212–0041; expires January 31, 2006). This notice informs the public of the PBGC’s request and solicits public comment on the collection of information. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 76471 Comments should be submitted by January 26, 2006. ADDRESSES: Comments may be mailed to the Office of Information and Regulatory Affairs of the Office of Management and Budget, Attn: Desk Officer for Pension Benefit Guaranty Corporation, Washington, DC 20503. Copies of the request for extension may be obtained without charge by writing to the PBGC’s Communications and Public Affairs Department at Suite 11102 at the above address or by visiting that office or calling 202–326–4040 during normal business hours. (TTY and TDD users may call the Federal relay service toll-free at 1–800–877–8339 and ask to be connected to 202–326–4040.) The regulations, forms, and instructions relating to the notice of failure to make required contributions may be accessed on the PBGC’s Web site at https:// www.pbgc.gov. FOR FURTHER INFORMATION CONTACT: James L. Beller, Jr., Attorney, Legislative and Regulatory Department, Pension Benefit Guaranty Corporation, 1200 K Street, NW., Washington, DC 20005– 4026, 202–326–4024. (For TTY/TDD users, call the Federal relay service tollfree at 1–800–877–8339 and ask to be connected to 202–326–4024.) SUPPLEMENTARY INFORMATION: Section 302(f) of the Employee Retirement Income Security Act of 1974 (‘‘ERISA’’) and section 412(n) of the Internal Revenue Code of 1986 (‘‘Code’’) impose a lien in favor of an underfunded singleemployer plan that is covered by the termination insurance program if (1) any person fails to make a required payment when due, and (2) the unpaid balance of that payment (including interest), when added to the aggregate unpaid balance of all preceding payments for which payment was not made when due (including interest), exceeds $1 million. (For this purpose, a plan is underfunded if its funded current liability percentage is less than 100 percent.) The lien is upon all property and rights to property belonging to the person or persons who are liable for required contributions (i.e., a contributing sponsor and each member of the controlled group of which that contributing sponsor is a member). Only the PBGC (or, at its direction, the plan’s contributing sponsor or a member of the same controlled group) may perfect and enforce this lien. Therefore, ERISA and the Code require persons committing payment failures to notify the PBGC within 10 days of the due date whenever there is a failure to make a required payment and the total of the unpaid balances (including interest) exceeds $1 million. DATES: E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 70, Number 247 (Tuesday, December 27, 2005)]
[Notices]
[Pages 76470-76471]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7867]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

Tennessee Valley Authority

[Docket No. 50-390]


Watts Bar Nuclear Plant, Unit 1; Environmental Assessment and 
Finding of No Significant Impact

    The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an exemption from Title 10 of the Code of Federal 
Regulations (10 CFR) part 50, Appendix E, Sections IV.F.2.b and c for 
Facility Operating License No. NPF-90, issued to Tennessee Valley 
Authority (TVA or the licensee), for operation of the Watts Bar Nuclear 
Power Plant (WBN), Unit 1, located in Rhea County, Tennessee. 
Therefore, as required by 10 CFR 51.21, the NRC is issuing this 
environmental assessment and finding of no significant impact.

Environmental Assessment

Identification of the Proposed Action

    The proposed action, as described in the licensee's application for 
a one-time exemption to the requirements of 10 CFR part 50, Appendix E, 
dated October 5, 2005, would allow the licensee to postpone the 
biennial, full-participation emergency exercise from November 2, 2005, 
to June 7, 2006. The licensee's letter requested an exemption from 
sections IV.F.2.b and c of Appendix E to 10 CFR part 50 regarding 
exercises involving the onsite and offsite emergency plans, as well as 
TVA's Radiological Emergency Plan Sections 14.2.1.1 and 14.2.1.3. The 
NRC staff has determined that the requirements of Appendix E to 10 CFR 
part 50, Sections IV.F.2.b and 2.c are applicable to the circumstances 
of the licensee's request and that an exemption from those requirements 
is appropriate. The licensee also stated in its October 5, 2005, letter 
that WBN will resume its normal biennial exercise cycle in 2007.

The Need for the Proposed Action

    The proposed exemption from 10 CFR part 50, appendix E, sections 
IV.F.2.b and c is needed because the planned full-participation 
exercise originally scheduled for November 2, 2005, was not performed. 
The Federal Emergency Management Agency, which normally participates in 
the evaluated, full-participation exercise, and the Tennessee Emergency 
Management Agency were unable to provide the necessary resources for 
the exercise due to the impact of Hurricane Katrina.

Environmental Impacts of the Proposed Action

    The NRC has completed its safety evaluation of the proposed action 
and concludes that the proposed exemption would not present an undue 
risk to the public health and safety. The details of the NRC staff's 
safety evaluation will be provided in the exemption that will be issued 
as part of the letter to the licensee approving the exemption to the 
regulation. The proposed action relates to the exercising of the 
emergency response plan, which has no effect on the operation of the 
facility.
    The proposed action will not significantly increase the probability 
or consequences of accidents. No changes are being made in the types of 
effluents that may be released offsite. There is no significant 
increase in the amount of any effluent released offsite. There is no 
significant increase in occupational or public radiation exposure. 
Therefore, there are no significant radiological environmental impacts 
associated with the proposed action.
    With regard to potential non-radiological impacts, the proposed 
action does not have a potential to affect any historic sites. It does 
not affect non-radiological plant effluents and has no other 
environmental impact. Therefore, there are no significant non-
radiological environmental impacts associated with the proposed action.
    Accordingly, the NRC concludes that there are no significant 
environmental impacts associated with the proposed action.

Environmental Impacts of the Alternative to the Proposed Action

    As an alternative to the proposed action, the staff considered 
denial of the proposed action (i.e., the ``no-action'' alternative). 
Denial of the application would result in no change in current 
environmental impacts. The environmental impacts of the proposed action 
and the alternative action are similar.

Alternative Use of Resources

    The action does not involve the use of any different resources than 
those previously considered in the Final Environmental Statement 
Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2, 
NUREG 0498, dated December 1978, and a supplement to the Final 
Environmental Statement (NUREG 0498 Supplement No. 1), dated April 
1995.

Agencies and Persons Consulted

    In accordance with its stated policy, on November 9, 2005, the 
staff consulted with the Tennessee State

[[Page 76471]]

official, Elizabeth Flanagan of the Tennessee Bureau of Radiological 
Health, regarding the environmental impact of the proposed action. The 
State official had no comments.

Finding of No Significant Impact

    On the basis of the environmental assessment, the NRC concludes 
that the proposed action will not have a significant effect on the 
quality of the human environment. Accordingly, the NRC has determined 
not to prepare an environmental impact statement for the proposed 
action.
    For further details with respect to the proposed action, see the 
licensee's letter dated October 5, 2005. Documents may be examined, 
and/or copied for a fee, at the NRC's Public Document Room (PDR), 
located at One White Flint North, Public File Area O-1F21, 11555 
Rockville Pike (first floor), Rockville, Maryland. Publicly available 
records will be accessible electronically from the Agencywide Documents 
Access and Management System (ADAMS) Public Electronic Reading Room on 
the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have access to ADAMS or who encounter 
problems in accessing the documents located in ADAMS should contact the 
NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, 
or by e-mail to pdr@nrc.gov.

    Dated at Rockville, Maryland, this 19th day of December 2005.

    For the Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Plant Licensing Branch II-2, Division of 
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E5-7867 Filed 12-23-05; 8:45 am]
BILLING CODE 7590-01-P