Environmental Impacts Statements; Notice of Availability, 74810 [E5-7446]
Download as PDF
74810
Federal Register / Vol. 70, No. 241 / Friday, December 16, 2005 / Notices
Proposed Revised Land Resource
Management Plan, Implementation,
Several Counties, AR; and LeFlore
and McCurtain Counties, OK.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050466, ERP No. F–COE–
C39018–NJ, Liberty State Park
Ecosystem Restoration Project,
Hudson Raritan Estuary Study, To
Address the Adverse Impacts
Associated with Past Filling
Activities, Port Authority of New and
New Jersey City, Hudson County, NJ.
Summary: No formal comment letter
sent to preparing agency.
EIS No. 20050467, ERP No. F–COE–
C39017–NY, Montuak Point Storm
Damage Reduction Project, Proposed
Reinforcement of an Existing Stone
Revetment Wall, Suffolk County, NY.
Summary: No comment letter was
sent was sent to the proposing agency.
EIS No. 20050477, ERP No. F–COE–
K36141–AZ, Santa Cruz River, Paseo
de las Iglesias Feasibility Study, To
Identify, Define and Solve
Environmental Degradation, Flooding
and Water Resource Problems, City of
Tucson, Pima County, AZ.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050352, ERP No. FS–NPS–
L65264–WA, Elwha River Ecosystem
Restoration Implementation Project,
Updated Information, Olympic
Peninsula, Challam County, WA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7444 Filed 12–15–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6670–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed December 5, 2005 Through
December 9, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050515, Draft EIS, NPS, FL,
Fort King National Historic
Landmark, Special Resource Study,
VerDate Aug<31>2005
19:37 Dec 15, 2005
Jkt 208001
Implementation, Second Seminole
War Site, City of Ocala, Marion
County, FL, Comment Period Ends:
January 30, 2006, Contact: Tim
Bemisderfer 404–562–3124.
EIS No. 20050516, Draft Supplement,
DOI, 00, Upper Mississippi River
National Wildlife and Fish Refuge,
Comprehensive Conservation Plan, A
New Alternative E: Modified Wildlife
and Integrated Public Use,
Implementation, MN, WI, IL and IA,
Comment Period Ends: February 3,
2005, Contact: Don Hultman 507–
452–4232. This document is available
on the Internet at https://www.fws.gov/
midwest/planning/uppermiss/
index.html.
EIS No. 20050517, Final EIS, FHW, PA,
US–219 Improvements Project,
Meyersdale to Somerset, SR 6219,
Section 020, Funding, U.S. Army COE
Section 404 Permit, Somerset County,
PA, Wait Period Ends: January 23,
2006, Contact: James A. Cheatham
717–221–3461.
EIS No. 20050518, Draft EIS, BLM, WY,
Atlantic Rim Natural Gas Field
Development Project, Proposed
Natural Gas Development to 2000
Wells, 1800 to Coal Beds and 200 to
Other Formations, Carbon County,
WY, Comment Period Ends: January
30, 2006, Contact: David Simons 307–
328–4328
EIS No. 20050519, Final EIS, FHW, RI,
U.S. Route 6/Route 10 Interchange
Improvement Project, To Identify
Transportation Alternative, Funding,
City of Providence County, RI, Wait
Period Ends: January 17, 2006,
Contact: Ralph Rizzo 401–528–4548.
EIS No. 20050520, Draft EIS, BIA, OR,
Coyote Business Park, Confederated
Tribes of the Umatilla Indian
Reservation, Proposes to Develop,
Build and Manage a Light Industrial
Commercial Business Park, Umatilla
County, OR, Comment Period Ends:
January 30, 2006, Contact: Jerry L.
Lauer 541–278–3786.
EIS No. 20050521, Draft EIS, BLM, AZ,
Arizona Strip Field Office Resource
Management Plan, which includes:
Vermilion Cliffs National Monument,
Grand Canyon-Parashant National
Monument (Parashant) BLM Portion,
General Management Plan for the
Grand Canyon-Parashant National
Monument NPS Portion of Parashant,
Implementation, AZ, Comment Period
Ends: January 30, 2006, Contact:
Diana Hawks 435–688–3266.
EIS No. 20050522, Final EIS, NPS, TX,
Big Thicket National Preserve Oil and
Gas Management Plan,
Implementation, Hardin, Jefferson,
Orange, Liberty, Tyler, Jasper and
Polk Counties, TX, Wait Period Ends:
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
January 17, 2006, Contact: Linda
Dansby 505–988–6095.
Amended Notices
EIS No. 20050411, Draft EIS, IBR, CA,
Central Valley Project, West San
Joaquin Division, San Luis Unit LongTerm Water Service Contract
Renewal, Cities of Avenal, Coalinga
and Huron, Fresno, King and Merced
Counties, CA, Comment Period Ends:
January 17, 2006, Contact: Shane
Hunt, 559–487–5138 Revision to FR
Notice Published October 7, 2005:
Comment Period Extend from
November 25, 2005 to January 17,
2006.
Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7446 Filed 12–15–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2005–0471; FRL–7753–1]
FIFRA Scientific Advisory Panel;
Notice of Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: There will be a 3–day meeting
of the Federal Insecticide, Fungicide,
and Rodenticide Act Scientific Advisory
Panel (FIFRA SAP) to consider the
Review of Worker Exposure Assessment
Methods.
DATES: The meeting will be held on
February 14–16, 2006, from 8:30 a.m. to
approximately 5:00 p.m. eastern time.
Comments. For the deadlines for the
submission of requests to present oral
comments and submission of written
comments, see Unit I.E. of the
SUPPLEMENTARY INFORMATION.
Nominations. Nominations of
scientific experts to serve as ad hoc
members of the FIFRA SAP for this
meeting should be provided on or before
December 28, 2005.
Special accommodations. For
information on access or services for
individuals with disabilities, and to
request accommodation of a disability,
please contact the Designated Federal
Official (DFO) listed under FOR FURTHER
INFORMATION CONTACT, preferably at least
10– days prior to the meeting, to give
EPA as much time as possible to process
your request.
ADDRESSES: The meeting will be held at
[the Holiday Inn Rosslyn at Key Bridge,
1900 North Fort Myer Drive, Arlington,
E:\FR\FM\16DEN1.SGM
16DEN1
Agencies
[Federal Register Volume 70, Number 241 (Friday, December 16, 2005)]
[Notices]
[Page 74810]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7446]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6670-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed December 5, 2005 Through December 9, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050515, Draft EIS, NPS, FL, Fort King National Historic
Landmark, Special Resource Study, Implementation, Second Seminole War
Site, City of Ocala, Marion County, FL, Comment Period Ends: January
30, 2006, Contact: Tim Bemisderfer 404-562-3124.
EIS No. 20050516, Draft Supplement, DOI, 00, Upper Mississippi River
National Wildlife and Fish Refuge, Comprehensive Conservation Plan, A
New Alternative E: Modified Wildlife and Integrated Public Use,
Implementation, MN, WI, IL and IA, Comment Period Ends: February 3,
2005, Contact: Don Hultman 507-452-4232. This document is available on
the Internet at https://www.fws.gov/midwest/planning/uppermiss/.
EIS No. 20050517, Final EIS, FHW, PA, US-219 Improvements Project,
Meyersdale to Somerset, SR 6219, Section 020, Funding, U.S. Army COE
Section 404 Permit, Somerset County, PA, Wait Period Ends: January 23,
2006, Contact: James A. Cheatham 717-221-3461.
EIS No. 20050518, Draft EIS, BLM, WY, Atlantic Rim Natural Gas Field
Development Project, Proposed Natural Gas Development to 2000 Wells,
1800 to Coal Beds and 200 to Other Formations, Carbon County, WY,
Comment Period Ends: January 30, 2006, Contact: David Simons 307-328-
4328
EIS No. 20050519, Final EIS, FHW, RI, U.S. Route 6/Route 10 Interchange
Improvement Project, To Identify Transportation Alternative, Funding,
City of Providence County, RI, Wait Period Ends: January 17, 2006,
Contact: Ralph Rizzo 401-528-4548.
EIS No. 20050520, Draft EIS, BIA, OR, Coyote Business Park,
Confederated Tribes of the Umatilla Indian Reservation, Proposes to
Develop, Build and Manage a Light Industrial Commercial Business Park,
Umatilla County, OR, Comment Period Ends: January 30, 2006, Contact:
Jerry L. Lauer 541-278-3786.
EIS No. 20050521, Draft EIS, BLM, AZ, Arizona Strip Field Office
Resource Management Plan, which includes: Vermilion Cliffs National
Monument, Grand Canyon-Parashant National Monument (Parashant) BLM
Portion, General Management Plan for the Grand Canyon-Parashant
National Monument NPS Portion of Parashant, Implementation, AZ, Comment
Period Ends: January 30, 2006, Contact: Diana Hawks 435-688-3266.
EIS No. 20050522, Final EIS, NPS, TX, Big Thicket National Preserve Oil
and Gas Management Plan, Implementation, Hardin, Jefferson, Orange,
Liberty, Tyler, Jasper and Polk Counties, TX, Wait Period Ends: January
17, 2006, Contact: Linda Dansby 505-988-6095.
Amended Notices
EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San
Joaquin Division, San Luis Unit Long-Term Water Service Contract
Renewal, Cities of Avenal, Coalinga and Huron, Fresno, King and Merced
Counties, CA, Comment Period Ends: January 17, 2006, Contact: Shane
Hunt, 559-487-5138 Revision to FR Notice Published October 7, 2005:
Comment Period Extend from November 25, 2005 to January 17, 2006.
Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7446 Filed 12-15-05; 8:45 am]
BILLING CODE 6560-50-P