Environmental Impacts Statements; Notice of Availability, 74810 [E5-7446]

Download as PDF 74810 Federal Register / Vol. 70, No. 241 / Friday, December 16, 2005 / Notices Proposed Revised Land Resource Management Plan, Implementation, Several Counties, AR; and LeFlore and McCurtain Counties, OK. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20050466, ERP No. F–COE– C39018–NJ, Liberty State Park Ecosystem Restoration Project, Hudson Raritan Estuary Study, To Address the Adverse Impacts Associated with Past Filling Activities, Port Authority of New and New Jersey City, Hudson County, NJ. Summary: No formal comment letter sent to preparing agency. EIS No. 20050467, ERP No. F–COE– C39017–NY, Montuak Point Storm Damage Reduction Project, Proposed Reinforcement of an Existing Stone Revetment Wall, Suffolk County, NY. Summary: No comment letter was sent was sent to the proposing agency. EIS No. 20050477, ERP No. F–COE– K36141–AZ, Santa Cruz River, Paseo de las Iglesias Feasibility Study, To Identify, Define and Solve Environmental Degradation, Flooding and Water Resource Problems, City of Tucson, Pima County, AZ. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20050352, ERP No. FS–NPS– L65264–WA, Elwha River Ecosystem Restoration Implementation Project, Updated Information, Olympic Peninsula, Challam County, WA. Summary: No formal comment letter was sent to the preparing agency. Dated: December 13, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E5–7444 Filed 12–15–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6670–3] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed December 5, 2005 Through December 9, 2005 Pursuant to 40 CFR 1506.9. EIS No. 20050515, Draft EIS, NPS, FL, Fort King National Historic Landmark, Special Resource Study, VerDate Aug<31>2005 19:37 Dec 15, 2005 Jkt 208001 Implementation, Second Seminole War Site, City of Ocala, Marion County, FL, Comment Period Ends: January 30, 2006, Contact: Tim Bemisderfer 404–562–3124. EIS No. 20050516, Draft Supplement, DOI, 00, Upper Mississippi River National Wildlife and Fish Refuge, Comprehensive Conservation Plan, A New Alternative E: Modified Wildlife and Integrated Public Use, Implementation, MN, WI, IL and IA, Comment Period Ends: February 3, 2005, Contact: Don Hultman 507– 452–4232. This document is available on the Internet at https://www.fws.gov/ midwest/planning/uppermiss/ index.html. EIS No. 20050517, Final EIS, FHW, PA, US–219 Improvements Project, Meyersdale to Somerset, SR 6219, Section 020, Funding, U.S. Army COE Section 404 Permit, Somerset County, PA, Wait Period Ends: January 23, 2006, Contact: James A. Cheatham 717–221–3461. EIS No. 20050518, Draft EIS, BLM, WY, Atlantic Rim Natural Gas Field Development Project, Proposed Natural Gas Development to 2000 Wells, 1800 to Coal Beds and 200 to Other Formations, Carbon County, WY, Comment Period Ends: January 30, 2006, Contact: David Simons 307– 328–4328 EIS No. 20050519, Final EIS, FHW, RI, U.S. Route 6/Route 10 Interchange Improvement Project, To Identify Transportation Alternative, Funding, City of Providence County, RI, Wait Period Ends: January 17, 2006, Contact: Ralph Rizzo 401–528–4548. EIS No. 20050520, Draft EIS, BIA, OR, Coyote Business Park, Confederated Tribes of the Umatilla Indian Reservation, Proposes to Develop, Build and Manage a Light Industrial Commercial Business Park, Umatilla County, OR, Comment Period Ends: January 30, 2006, Contact: Jerry L. Lauer 541–278–3786. EIS No. 20050521, Draft EIS, BLM, AZ, Arizona Strip Field Office Resource Management Plan, which includes: Vermilion Cliffs National Monument, Grand Canyon-Parashant National Monument (Parashant) BLM Portion, General Management Plan for the Grand Canyon-Parashant National Monument NPS Portion of Parashant, Implementation, AZ, Comment Period Ends: January 30, 2006, Contact: Diana Hawks 435–688–3266. EIS No. 20050522, Final EIS, NPS, TX, Big Thicket National Preserve Oil and Gas Management Plan, Implementation, Hardin, Jefferson, Orange, Liberty, Tyler, Jasper and Polk Counties, TX, Wait Period Ends: PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 January 17, 2006, Contact: Linda Dansby 505–988–6095. Amended Notices EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San Joaquin Division, San Luis Unit LongTerm Water Service Contract Renewal, Cities of Avenal, Coalinga and Huron, Fresno, King and Merced Counties, CA, Comment Period Ends: January 17, 2006, Contact: Shane Hunt, 559–487–5138 Revision to FR Notice Published October 7, 2005: Comment Period Extend from November 25, 2005 to January 17, 2006. Dated: December 13, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E5–7446 Filed 12–15–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2005–0471; FRL–7753–1] FIFRA Scientific Advisory Panel; Notice of Public Meeting Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: There will be a 3–day meeting of the Federal Insecticide, Fungicide, and Rodenticide Act Scientific Advisory Panel (FIFRA SAP) to consider the Review of Worker Exposure Assessment Methods. DATES: The meeting will be held on February 14–16, 2006, from 8:30 a.m. to approximately 5:00 p.m. eastern time. Comments. For the deadlines for the submission of requests to present oral comments and submission of written comments, see Unit I.E. of the SUPPLEMENTARY INFORMATION. Nominations. Nominations of scientific experts to serve as ad hoc members of the FIFRA SAP for this meeting should be provided on or before December 28, 2005. Special accommodations. For information on access or services for individuals with disabilities, and to request accommodation of a disability, please contact the Designated Federal Official (DFO) listed under FOR FURTHER INFORMATION CONTACT, preferably at least 10– days prior to the meeting, to give EPA as much time as possible to process your request. ADDRESSES: The meeting will be held at [the Holiday Inn Rosslyn at Key Bridge, 1900 North Fort Myer Drive, Arlington, E:\FR\FM\16DEN1.SGM 16DEN1

Agencies

[Federal Register Volume 70, Number 241 (Friday, December 16, 2005)]
[Notices]
[Page 74810]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7446]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6670-3]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed December 5, 2005 Through December 9, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050515, Draft EIS, NPS, FL, Fort King National Historic 
Landmark, Special Resource Study, Implementation, Second Seminole War 
Site, City of Ocala, Marion County, FL, Comment Period Ends: January 
30, 2006, Contact: Tim Bemisderfer 404-562-3124.
EIS No. 20050516, Draft Supplement, DOI, 00, Upper Mississippi River 
National Wildlife and Fish Refuge, Comprehensive Conservation Plan, A 
New Alternative E: Modified Wildlife and Integrated Public Use, 
Implementation, MN, WI, IL and IA, Comment Period Ends: February 3, 
2005, Contact: Don Hultman 507-452-4232. This document is available on 
the Internet at https://www.fws.gov/midwest/planning/uppermiss/.
EIS No. 20050517, Final EIS, FHW, PA, US-219 Improvements Project, 
Meyersdale to Somerset, SR 6219, Section 020, Funding, U.S. Army COE 
Section 404 Permit, Somerset County, PA, Wait Period Ends: January 23, 
2006, Contact: James A. Cheatham 717-221-3461.
EIS No. 20050518, Draft EIS, BLM, WY, Atlantic Rim Natural Gas Field 
Development Project, Proposed Natural Gas Development to 2000 Wells, 
1800 to Coal Beds and 200 to Other Formations, Carbon County, WY, 
Comment Period Ends: January 30, 2006, Contact: David Simons 307-328-
4328
EIS No. 20050519, Final EIS, FHW, RI, U.S. Route 6/Route 10 Interchange 
Improvement Project, To Identify Transportation Alternative, Funding, 
City of Providence County, RI, Wait Period Ends: January 17, 2006, 
Contact: Ralph Rizzo 401-528-4548.
EIS No. 20050520, Draft EIS, BIA, OR, Coyote Business Park, 
Confederated Tribes of the Umatilla Indian Reservation, Proposes to 
Develop, Build and Manage a Light Industrial Commercial Business Park, 
Umatilla County, OR, Comment Period Ends: January 30, 2006, Contact: 
Jerry L. Lauer 541-278-3786.
EIS No. 20050521, Draft EIS, BLM, AZ, Arizona Strip Field Office 
Resource Management Plan, which includes: Vermilion Cliffs National 
Monument, Grand Canyon-Parashant National Monument (Parashant) BLM 
Portion, General Management Plan for the Grand Canyon-Parashant 
National Monument NPS Portion of Parashant, Implementation, AZ, Comment 
Period Ends: January 30, 2006, Contact: Diana Hawks 435-688-3266.
EIS No. 20050522, Final EIS, NPS, TX, Big Thicket National Preserve Oil 
and Gas Management Plan, Implementation, Hardin, Jefferson, Orange, 
Liberty, Tyler, Jasper and Polk Counties, TX, Wait Period Ends: January 
17, 2006, Contact: Linda Dansby 505-988-6095.

Amended Notices

EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San 
Joaquin Division, San Luis Unit Long-Term Water Service Contract 
Renewal, Cities of Avenal, Coalinga and Huron, Fresno, King and Merced 
Counties, CA, Comment Period Ends: January 17, 2006, Contact: Shane 
Hunt, 559-487-5138 Revision to FR Notice Published October 7, 2005: 
Comment Period Extend from November 25, 2005 to January 17, 2006.

    Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7446 Filed 12-15-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.