Environmental Impact Statements and Regulations; Availability of EPA Comments, 74809-74810 [E5-7444]
Download as PDF
Federal Register / Vol. 70, No. 241 / Friday, December 16, 2005 / Notices
A. Western reserves the right to
reduce the withdrawable portion of a
contractor’s contract rate of delivery,
upon a 2-year notice of a request by
Reclamation for additional priority use
power needed to serve project pumping
requirements or irrigation pumping on
certain Indian lands.
B. Western, at its discretion and sole
determination, reserves the right to
adjust the contract rate of delivery on 5
years’ written notice in response to
changes in hydrology and river
operations. Such adjustments will only
take place after Western conducts a
public process.
C. Each applicant is ultimately
responsible for arranging third-party
delivery. Western may assist new
applicants, upon request, in facilitating
third-party transmission and/or
displacement arrangements for delivery
of firm power allocated under these
contracts.
D. The Contractor shall not sell any of
the firm electric power or energy
allocation to any electric utility
customer of the Contractor for resale by
that utility customer. The Contractor
may sell the electric power and energy
allocation to its members on condition
that said members not sell any of said
power and energy to any customer of
the members for resale by that customer.
E. Contracts entered into under the
Post-2008 Resource Pool Allocation
Procedures will provide for Western to
furnish firm electric service effective
from October 1, 2008, through
September 30, 2028.
F. Contractors will be required to pay
1 month in advance for firm electric
service. If both parties mutually agree,
payments of more than 1 month in
advance may be allowed.
G. To the extent existing contractors’
power allocations are reduced to create
the resource pool, new contractors will
be required to reimburse existing
contractors for undepreciated
replacement advances.
H. Applicants that aggregate their
loads will be required to enter into a
single firm power contract with
Western, with the aggregated group
entity as the contracting Party.
I. Contracts entered into as a result of
these final procedures will incorporate
Western’s standard provisions for power
sales contracts, including integrated
resource planning, and the General
Power Contract Provisions.
VI. Review Under the Regulatory
Flexibility Act
The Regulatory Flexibility Act of 1980
(5 U.S.C. 601, et seq.) requires Federal
agencies to perform a regulatory
flexibility analysis if a final rule is likely
VerDate Aug<31>2005
19:37 Dec 15, 2005
Jkt 208001
to have a significant economic impact
on a substantial number of small entities
and there is a legal requirement to issue
a general notice of proposed
rulemaking. Western has determined
that this action does not require a
regulatory flexibility analysis since it is
a rulemaking of particular applicability
involving rates or services applicable to
public property.
VII. Small Business Regulatory
Enforcement Fairness Act
Western has determined this rule is
exempt from congressional notification
requirements under 5 U.S.C. 801
because the action is a rulemaking of
particular applicability relating to rates
or services and involves matters of
procedure.
VIII. Determination Under Executive
Order 12866
Western has an exemption from
centralized regulatory review under
Executive Order 12866; accordingly, no
clearance of this notice by the Office of
Management and Budget is required.
IX. Environmental Compliance
Western has completed an
environmental impact statement on
EPAMP, following the National
Environmental Policy Act of 1969
(NEPA). The Record of Decision was
published in 60 FR 53181, October 12,
1995. Western’s NEPA review assured
all environmental effects related to these
actions have been analyzed.
Dated: December 1, 2005.
Michael S. Hacskaylo,
Administrator.
[FR Doc. E5–7438 Filed 12–15–05; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6670–4]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
74809
Draft EISs
EIS No. 20050356, ERP No. D–FRC–
G03028–00, Port Arthur Liquefield
Natural Gas (LNG) Project,
Construction and Operation, U.S.
Army COE section 10 and 404
Permits, (FERC/EIS–0182D), Jefferson
and Orange Counties, TX; and
Cameron, Calcasieu, and Beauregard
Parishes, LA.
Summary: EPA expressed
environmental concerns and requested
additional information to be included in
the FEIS in the areas of air quality
impacts, sediment analysis, dredged
material placement for beneficial uses,
habitat restoration and mitigation.
Rating EC2.
EIS No. 20050361, ERP No. D–FRC–
L05232–WA, Rocky Reach
Hydroelectric Project, (FERC/DEIS–
0184D), Application for a New
License for the Existing 865.76
Megawatt Facility, Public Utility
District No. 1 (PUD), Columbia River,
Chelan County, WA.
Summary: EPA does not object to the
proposed project.
Rating LO.
EIS No. 20050388, ERP No. D–FRC–
L05233–WA, Lewis River
Hydroelectric Projects, Relicensing
the Swift No. 1 (FERC No. 2111–018),
Swift No. 2 (FERC No. 2213–011),
Yale (FERC No. 2071–013), Merwin
(FERC No. 935–053) Project,
Application for Relicense, North Fork
Lewis River, Cowlitz, Clark and
Shamania Counties, WA.
Summary: EPA expressed
environmental concerns about water
quality impacts, and requested
additional information regrading water
quality impacts be included in the final
EIS.
Rating EC2.
Final EISs
EIS No. 20050440, ERP No. F–SFW–
L65451–AK, Alaska Peninsula and
Becharof National Wildlife Refuges,
Revised Comprehensive Conservation
Plan, Implementation, AK.
Summary: EPA does not object to the
project as proposed. No formal comment
letter was sent to the preparing agency.
EIS No. 20050451, ERP No. F–AFS–
L39061–WA, Fish Passage and
Aquatic Habitat Restoration at
Hemlock Dam, Implementation,
Gifford Pinchot National Forest,
Mount Adams District, Skamania
County, WA.
Summary: No formal comment letter
sent to the preparing agency.
EIS No. 20050464, ERP No. F–AFS–
G65072–00, Ouachita National Forest,
E:\FR\FM\16DEN1.SGM
16DEN1
74810
Federal Register / Vol. 70, No. 241 / Friday, December 16, 2005 / Notices
Proposed Revised Land Resource
Management Plan, Implementation,
Several Counties, AR; and LeFlore
and McCurtain Counties, OK.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050466, ERP No. F–COE–
C39018–NJ, Liberty State Park
Ecosystem Restoration Project,
Hudson Raritan Estuary Study, To
Address the Adverse Impacts
Associated with Past Filling
Activities, Port Authority of New and
New Jersey City, Hudson County, NJ.
Summary: No formal comment letter
sent to preparing agency.
EIS No. 20050467, ERP No. F–COE–
C39017–NY, Montuak Point Storm
Damage Reduction Project, Proposed
Reinforcement of an Existing Stone
Revetment Wall, Suffolk County, NY.
Summary: No comment letter was
sent was sent to the proposing agency.
EIS No. 20050477, ERP No. F–COE–
K36141–AZ, Santa Cruz River, Paseo
de las Iglesias Feasibility Study, To
Identify, Define and Solve
Environmental Degradation, Flooding
and Water Resource Problems, City of
Tucson, Pima County, AZ.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050352, ERP No. FS–NPS–
L65264–WA, Elwha River Ecosystem
Restoration Implementation Project,
Updated Information, Olympic
Peninsula, Challam County, WA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7444 Filed 12–15–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6670–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed December 5, 2005 Through
December 9, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050515, Draft EIS, NPS, FL,
Fort King National Historic
Landmark, Special Resource Study,
VerDate Aug<31>2005
19:37 Dec 15, 2005
Jkt 208001
Implementation, Second Seminole
War Site, City of Ocala, Marion
County, FL, Comment Period Ends:
January 30, 2006, Contact: Tim
Bemisderfer 404–562–3124.
EIS No. 20050516, Draft Supplement,
DOI, 00, Upper Mississippi River
National Wildlife and Fish Refuge,
Comprehensive Conservation Plan, A
New Alternative E: Modified Wildlife
and Integrated Public Use,
Implementation, MN, WI, IL and IA,
Comment Period Ends: February 3,
2005, Contact: Don Hultman 507–
452–4232. This document is available
on the Internet at https://www.fws.gov/
midwest/planning/uppermiss/
index.html.
EIS No. 20050517, Final EIS, FHW, PA,
US–219 Improvements Project,
Meyersdale to Somerset, SR 6219,
Section 020, Funding, U.S. Army COE
Section 404 Permit, Somerset County,
PA, Wait Period Ends: January 23,
2006, Contact: James A. Cheatham
717–221–3461.
EIS No. 20050518, Draft EIS, BLM, WY,
Atlantic Rim Natural Gas Field
Development Project, Proposed
Natural Gas Development to 2000
Wells, 1800 to Coal Beds and 200 to
Other Formations, Carbon County,
WY, Comment Period Ends: January
30, 2006, Contact: David Simons 307–
328–4328
EIS No. 20050519, Final EIS, FHW, RI,
U.S. Route 6/Route 10 Interchange
Improvement Project, To Identify
Transportation Alternative, Funding,
City of Providence County, RI, Wait
Period Ends: January 17, 2006,
Contact: Ralph Rizzo 401–528–4548.
EIS No. 20050520, Draft EIS, BIA, OR,
Coyote Business Park, Confederated
Tribes of the Umatilla Indian
Reservation, Proposes to Develop,
Build and Manage a Light Industrial
Commercial Business Park, Umatilla
County, OR, Comment Period Ends:
January 30, 2006, Contact: Jerry L.
Lauer 541–278–3786.
EIS No. 20050521, Draft EIS, BLM, AZ,
Arizona Strip Field Office Resource
Management Plan, which includes:
Vermilion Cliffs National Monument,
Grand Canyon-Parashant National
Monument (Parashant) BLM Portion,
General Management Plan for the
Grand Canyon-Parashant National
Monument NPS Portion of Parashant,
Implementation, AZ, Comment Period
Ends: January 30, 2006, Contact:
Diana Hawks 435–688–3266.
EIS No. 20050522, Final EIS, NPS, TX,
Big Thicket National Preserve Oil and
Gas Management Plan,
Implementation, Hardin, Jefferson,
Orange, Liberty, Tyler, Jasper and
Polk Counties, TX, Wait Period Ends:
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
January 17, 2006, Contact: Linda
Dansby 505–988–6095.
Amended Notices
EIS No. 20050411, Draft EIS, IBR, CA,
Central Valley Project, West San
Joaquin Division, San Luis Unit LongTerm Water Service Contract
Renewal, Cities of Avenal, Coalinga
and Huron, Fresno, King and Merced
Counties, CA, Comment Period Ends:
January 17, 2006, Contact: Shane
Hunt, 559–487–5138 Revision to FR
Notice Published October 7, 2005:
Comment Period Extend from
November 25, 2005 to January 17,
2006.
Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7446 Filed 12–15–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2005–0471; FRL–7753–1]
FIFRA Scientific Advisory Panel;
Notice of Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: There will be a 3–day meeting
of the Federal Insecticide, Fungicide,
and Rodenticide Act Scientific Advisory
Panel (FIFRA SAP) to consider the
Review of Worker Exposure Assessment
Methods.
DATES: The meeting will be held on
February 14–16, 2006, from 8:30 a.m. to
approximately 5:00 p.m. eastern time.
Comments. For the deadlines for the
submission of requests to present oral
comments and submission of written
comments, see Unit I.E. of the
SUPPLEMENTARY INFORMATION.
Nominations. Nominations of
scientific experts to serve as ad hoc
members of the FIFRA SAP for this
meeting should be provided on or before
December 28, 2005.
Special accommodations. For
information on access or services for
individuals with disabilities, and to
request accommodation of a disability,
please contact the Designated Federal
Official (DFO) listed under FOR FURTHER
INFORMATION CONTACT, preferably at least
10– days prior to the meeting, to give
EPA as much time as possible to process
your request.
ADDRESSES: The meeting will be held at
[the Holiday Inn Rosslyn at Key Bridge,
1900 North Fort Myer Drive, Arlington,
E:\FR\FM\16DEN1.SGM
16DEN1
Agencies
[Federal Register Volume 70, Number 241 (Friday, December 16, 2005)]
[Notices]
[Pages 74809-74810]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7444]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6670-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050356, ERP No. D-FRC-G03028-00, Port Arthur Liquefield
Natural Gas (LNG) Project, Construction and Operation, U.S. Army COE
section 10 and 404 Permits, (FERC/EIS-0182D), Jefferson and Orange
Counties, TX; and Cameron, Calcasieu, and Beauregard Parishes, LA.
Summary: EPA expressed environmental concerns and requested
additional information to be included in the FEIS in the areas of air
quality impacts, sediment analysis, dredged material placement for
beneficial uses, habitat restoration and mitigation.
Rating EC2.
EIS No. 20050361, ERP No. D-FRC-L05232-WA, Rocky Reach Hydroelectric
Project, (FERC/DEIS-0184D), Application for a New License for the
Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD),
Columbia River, Chelan County, WA.
Summary: EPA does not object to the proposed project.
Rating LO.
EIS No. 20050388, ERP No. D-FRC-L05233-WA, Lewis River Hydroelectric
Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2
(FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-
053) Project, Application for Relicense, North Fork Lewis River,
Cowlitz, Clark and Shamania Counties, WA.
Summary: EPA expressed environmental concerns about water quality
impacts, and requested additional information regrading water quality
impacts be included in the final EIS.
Rating EC2.
Final EISs
EIS No. 20050440, ERP No. F-SFW-L65451-AK, Alaska Peninsula and
Becharof National Wildlife Refuges, Revised Comprehensive Conservation
Plan, Implementation, AK.
Summary: EPA does not object to the project as proposed. No formal
comment letter was sent to the preparing agency.
EIS No. 20050451, ERP No. F-AFS-L39061-WA, Fish Passage and Aquatic
Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot
National Forest, Mount Adams District, Skamania County, WA.
Summary: No formal comment letter sent to the preparing agency.
EIS No. 20050464, ERP No. F-AFS-G65072-00, Ouachita National Forest,
[[Page 74810]]
Proposed Revised Land Resource Management Plan, Implementation, Several
Counties, AR; and LeFlore and McCurtain Counties, OK.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20050466, ERP No. F-COE-C39018-NJ, Liberty State Park Ecosystem
Restoration Project, Hudson Raritan Estuary Study, To Address the
Adverse Impacts Associated with Past Filling Activities, Port Authority
of New and New Jersey City, Hudson County, NJ.
Summary: No formal comment letter sent to preparing agency.
EIS No. 20050467, ERP No. F-COE-C39017-NY, Montuak Point Storm Damage
Reduction Project, Proposed Reinforcement of an Existing Stone
Revetment Wall, Suffolk County, NY.
Summary: No comment letter was sent was sent to the proposing
agency.
EIS No. 20050477, ERP No. F-COE-K36141-AZ, Santa Cruz River, Paseo de
las Iglesias Feasibility Study, To Identify, Define and Solve
Environmental Degradation, Flooding and Water Resource Problems, City
of Tucson, Pima County, AZ.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20050352, ERP No. FS-NPS-L65264-WA, Elwha River Ecosystem
Restoration Implementation Project, Updated Information, Olympic
Peninsula, Challam County, WA.
Summary: No formal comment letter was sent to the preparing agency.
Dated: December 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7444 Filed 12-15-05; 8:45 am]
BILLING CODE 6560-50-P