Great Lakes Gas Transmission Limited Partnership; Notice of Negotiated Rate Agreement, 73995 [E5-7321]

Download as PDF Federal Register / Vol. 70, No. 239 / Wednesday, December 14, 2005 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E5–7308 Filed 12–13–05; 8:45 am] [Docket No. RP99–220–021] Great Lakes Gas Transmission Limited Partnership; Notice of Negotiated Rate Agreement December 8, 2005. Take notice that on December 2, 2005, Great Lakes Gas Transmission Limited Partnership (Great Lakes) filed for disclosure, a transportation service agreement pursuant to Great Lakes’ Rate Schedule FT entered into by Great Lakes and WPS Energy Services, Inc. (WPS) (FT Service Agreement). Great Lakes states that the FT Service Agreement being filed reflects a negotiated rate arrangement between Great Lakes and WPS commencing December 1, 2005. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP99–220–020] Great Lakes Gas Transmission Limited Partnership; Notice of Negotiated Rate Agreement December 8, 2005. Take notice that on December 2, 2005, Great Lakes Gas Transmission Limited Partnership (Great Lakes) filed for disclosure, a transportation service agreement pursuant to Great Lakes’ Rate Schedule FT entered into by Great Lakes and NJR Energy Services Company (NJR) (FT Service Agreement). Great Lakes states that the FT Service Agreement being filed reflects a negotiated rate arrangement between Great Lakes and NJR commencing December 1, 2005. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 73995 ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–7321 Filed 12–13–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06–138–000] Gulf States Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff December 8, 2005. Take notice that on December 6, 2005, Gulf States Transmission Corporation (Gulf States) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, the tariff Sheets listed on Appendix A to the filing, to become effective December 26, 2005. Gulf States states that copies of this filing are being served on all customers of Gulf States and applicable state regulatory agencies. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. E:\FR\FM\14DEN1.SGM 14DEN1

Agencies

[Federal Register Volume 70, Number 239 (Wednesday, December 14, 2005)]
[Notices]
[Page 73995]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7321]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP99-220-020]


Great Lakes Gas Transmission Limited Partnership; Notice of 
Negotiated Rate Agreement

December 8, 2005.
    Take notice that on December 2, 2005, Great Lakes Gas Transmission 
Limited Partnership (Great Lakes) filed for disclosure, a 
transportation service agreement pursuant to Great Lakes' Rate Schedule 
FT entered into by Great Lakes and NJR Energy Services Company (NJR) 
(FT Service Agreement). Great Lakes states that the FT Service 
Agreement being filed reflects a negotiated rate arrangement between 
Great Lakes and NJR commencing December 1, 2005.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-7321 Filed 12-13-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.