Sunshine Act; Meetings, 74001-74003 [05-24048]

Download as PDF Federal Register / Vol. 70, No. 239 / Wednesday, December 14, 2005 / Notices The conference will consist of panels addressing, but not limited to, the following issues of interest to the Commissioners: 1. Whether the current capacity obligation construct within PJM’s market design provides for just and reasonable wholesale power prices in the PJM footprint, at levels that provide adequate assurance that necessary resources will be provided to assure reliability, or whether changes must be made to that capacity obligation construct; 2. Whether PJM’s RPM proposal would provide for just and reasonable wholesale power prices in the PJM footprint, at levels that provide adequate assurance that necessary resources will be provided to assure reliability, or whether changes must be made to the proposal to meet those goals; and 3. Whether an alternative approach to RPM is necessary to ensure just and reasonable wholesale power prices in the PJM footprint. The technical conference is intended to provide a forum through which the Commission will obtain information and develop a record on these topics. The Commission will issue a supplemental notice with information identifying panel participants and a detailed agenda prior to the conference. There will be an opportunity for parties to file comments following the technical conference. The conference will be transcribed. A transcript of the conference will be immediately available from Ace Reporting Company (202) 347–3700 or (800) 336–6646 for a fee. It will be available for the public on the Commission’s eLibrary system seven calendar days after FERC receives the transcript. A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who wishes to view this event may do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the Webcasts. It also offers access to this event via television in the Washington, DC area and via phone bridge for a fee. Visit https:// www.CapitolConnection.org or contact Danelle Perkowski or David Reininger at the Capitol Connection (703) 993–3100 for information about this service. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or (202) 208– 1659 (TTY), or send a FAX to (202) 208– 2106 with the required accommodations. For further information on this conference, contact John McPherson at John.McPherson@ferc.gov, or Katherine Waldbauer at Katherine.Waldbauer@ferc.gov. Magalie R. Salas, Secretary. [FR Doc. E5–7310 Filed 12–13–05; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act; Meetings December 8, 2005. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: Federal Energy Regulatory Commission. AGENCY HOLDING MEETING: DATE AND TIME: December 15, 2005, 10 a.m. Room 2C, 888 First Street, NE., Washington, DC 20426. PLACE: STATUS: Open. Agenda. listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: * Note—Items FOR FURTHER INFORMATION CONTACT: Magalie R. Salas, Secretary, Telephone (202) 502–8400. For a recorded listing item stricken from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all papers relevant to the items on the agenda; however, all public documents may be examined in the Public Reference Room. BILLING CODE 6717–01–P 898TH—MEETING, REGULAR MEETING [December 15, 2005, 10 a.m.] Item No. Docket No. Company Administrative Agenda A–1 ........... A–2 ........... A–3 ........... AD02–1–000 ............................................... AD02–7–000 ............................................... AD06–3–000 ............................................... Agency Administrative Matters Customer Matters, Reliability, Security and Market Operations Market Update Markets, Tariffs, and Rates—Electric E–1 E–2 E–3 E–4 E–5 E–6 ........... ........... ........... ........... ........... ........... RM04–12–000 ............................................ OMITTED. ER05–1236–000 ......................................... EC05–103–000 ........................................... ER05–1235–000 ......................................... EC05–110–000 ........................................... E–7 ........... ER06–78–000 ............................................. ER06–78–001 ............................................. ER06–43–000 ............................................. ER06–58–000 ............................................. ER06–61–000 ............................................. ER05–1249–000 ......................................... ER05–1249–001 ......................................... E–8 ........... E–9 ........... E–10 ......... E–11 ......... .............. VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Accounting and Financial Reporting for Public Utilities including RTOs Duke Power Duke Energy Corporation Cinergy Corp. MidAmerican Energy Company MidAmerican Energy Holdings Company Scottish Power plc PacifiCorp Holdings, Inc. PacifiCorp PJM Interconnection, L.L.C. Commonwealth Edison Company and Exelon Generation Company California Independent System Operator Corporation California Independent System Operator Corporation Granite State Electric Company Massachusetts Electric Company The Narragansett Electric Company Frm 00014 Fmt 4703 Sfmt 4703 74001 E:\FR\FM\14DEN1.SGM 14DEN1 74002 Federal Register / Vol. 70, No. 239 / Wednesday, December 14, 2005 / Notices 898TH—MEETING, REGULAR MEETING—Continued [December 15, 2005, 10 a.m.] Item No. Docket No. Company Niagara Mohawk Power Corporation New England Power Company E–12 ......... E–13 ......... E–14 ......... E–15 ......... E–16 ......... E–17 ......... E–18 E–19 E–20 E–21 ......... ......... ......... ......... E–22 E–23 E–24 E–25 E–26 ......... ......... ......... ......... ......... OMITTED. OMITTED. ER93–465–034 ........................................... ER96–417–003. ER96–1375–004. OA96–39–011. OA97–245–004. OMITTED. ER05–1085–001 ......................................... ER04–458–008. ER93–465–035 ........................................... ER96–417–004. ER96–1375–005. OA96–39–012. OA97–245–005. ER05–1168–000 ......................................... ER05–1056–001 ......................................... OMITTED. EC05–43–000 ............................................. EC05–43–001 ............................................. ER05–666–003 ........................................... OMITTED. OMITTED. OMITTED. EC05–132–000 ........................................... Florida Power & Light Company Midwest Independent Transmission System Operator Florida Power & Light Company Attala Transmission, L.L.C. Chehalis Power Generating, L.P. Exelon Corporation and Public Service Enterprise Group, Inc. Southwest Power Pool, Inc. Nevada Power Company GenWest LLC Markets, Tariffs, and Rates—Miscellaneous M–1 .......... RM05–35–000 ............................................ Standard of Review for Modifications to Jurisdictional Agreements Markets, Tariffs, and Rates—Gas G–1 .......... G–2 .......... VerDate Aug<31>2005 PR05–19–000 ............................................. OR92–8–024 .............................................. OR93–5–015. OR94–3–014. OR94–4–016. OR95–5–013 .............................................. OR95–34–012 ............................................ OR96–2–010 .............................................. OR96–2–011 .............................................. OR96–10–007 ............................................ OR96–10–009. OR98–1–009. OR98–1–011. OR00–4–002. OR96–2–003 .............................................. OR96–2–010 .............................................. OR96–10–008. OR96–10–009. OR96–17–004. OR96–17–006. OR97–2–004. OR97–2–005. OR98–2–005. OR98–2–007. OR00–8–005. OR00–8–007. OR98–13–005 ............................................ OR98–13–007. OR00–9–005. OR00–9–007. OR00–7–005 .............................................. OR00–7–006. OR00–10–005 ............................................ OR00–10–006. S98–1–001 ................................................. IS98–1–002. 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Unocal Keystone Gas Storage, LLC SFPP, L.P. Mobil Oil Corporation v. SFPP, L.P. Tosco Corporation v. SFPP, L.P. ARCO Products Co. a Division of Atlantic Richfield Company, Texaco Refining and Marketing Inc., and Mobil Oil Corporation v. SFPP, L.P. Ultramar Diamond Shamrock Corporation and Ultramar, Inc. v. SFPP, L.P. Tosco Corporation v. SFPP, L.P. Navajo Refining Corporation v. SFPP, L.P. Refinery Holding Company SFPP, L.P. Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1 Federal Register / Vol. 70, No. 239 / Wednesday, December 14, 2005 / Notices 74003 898TH—MEETING, REGULAR MEETING—Continued [December 15, 2005, 10 a.m.] Item No. Docket No. Company IS04–323–002. Energy Projects—Hydro H–1 ........... H–2 ........... H–3 ........... H–4 ........... H–5 ........... P–9401–064 ............................................... P–487–041 ................................................. P–12597–001 ............................................. P–12598–001. P–12599–001 ............................................. P–2064–012 ............................................... P–10395–031 ............................................. Mt. Hope Waterpower Project, LLP PPL Holtwood, LLC Birch Power Company Wade Jacobsen Flambeau Hydro, LLC Electric Plant Board of the City of Augusta, Kentucky Energy Projects—Certificates C–1 ........... C–2 ........... RM05–23–000 ............................................ AD04–11–000 ............................................. CP05–416–000 ........................................... Magalie R. Sales, Secretary. Rate Regulation of Certain Underground Storage Facilities Tennessee Gas Pipeline Company ENVIRONMENTAL PROTECTION AGENCY A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free Webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Perkowski or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in Hearing Room 2. Members of the public may view this briefing in the Commission Meeting overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 05–24048 Filed 12–9–05; 5:23 pm] BILLING CODE 6717–01–P [EPA-HQ-OPP–2005–0298; FRL–7747–4] Notice of Filing of a Pesticide Petition for the Establishment of Regulations for Residues of the Insecticide Clothianidin in or on Food Commodities Environmental Protection Agency (EPA). AGENCY: ACTION: Notice. SUMMARY: This notice announces the initial filing of a pesticide petition proposing the establishment of regulations for residues of the insecticide clothianidin in or on cotton, undelinted seed and cotton, gin byproducts. Comments must be received on or before January 13, 2006. DATES: Comments, identified by docket identification (ID) number EPAHQ-OPP–2005–0298 and pesticide petition (PP) number 5F6908, may be submitted electronically, by mail, or through hand delivery or courier. Follow the detailed instructions as provided in Unit I. of the SUPPLEMENTARY INFORMATION. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Kable Davis, Registration Division (7505C), Office of Pesticide Programs, U. S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460–0001; phone number: 703–306–0415, e-mail address: davis.kable@epa.gov. SUPPLEMENTARY INFORMATION: VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 I. General Information A. Does This Action Apply to Me? You may be potentially affected by this action if you are an agricultural producer, food manufacturer, or pesticide manufacturer. Potentially affected entities may include, but are not limited to: • Crop production (NAICS code 111). • Animal production (NAICS code 112). • Food manufacturing (NAICS code 311). • Pesticide manufacturing (NAICS code 32532). This listing is not intended to be exhaustive, but rather provides a guide for readers regarding entities likely to be affected by this action. Other types of entities not listed in this unit could also be affected. The North American Industrial Classification System (NAICS) codes have been provided to assist you and others in determining whether this action might apply to certain entities. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. How Can I Get Copies of This Document and Other Related Information? 1. EPA has established an official public docket for this action under docket ID number EPA-HQ-OPP–2005– 0298. The official public docket consists of the documents specifically referenced in this action, any public comments received, and other information related to this action. Although a part of the official docket, the public docket does not include Confidential Business Information (CBI) or other information E:\FR\FM\14DEN1.SGM 14DEN1

Agencies

[Federal Register Volume 70, Number 239 (Wednesday, December 14, 2005)]
[Notices]
[Pages 74001-74003]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-24048]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act; Meetings

December 8, 2005.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 
U.S.C. 552b:

Agency Holding Meeting: Federal Energy Regulatory Commission.

Date and Time: December 15, 2005, 10 a.m.

Place: Room 2C, 888 First Street, NE., Washington, DC 20426.

Status: Open.

Matters to be Considered: Agenda.
    * Note--Items listed on the agenda may be deleted 
without further notice.

FOR FURTHER INFORMATION CONTACT: Magalie R. Salas, Secretary, Telephone 
(202) 502-8400.
    For a recorded listing item stricken from or added to the meeting, 
call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all papers relevant to the items on the 
agenda; however, all public documents may be examined in the Public 
Reference Room.

                                         898th--Meeting, Regular Meeting
                                          [December 15, 2005, 10 a.m.]
----------------------------------------------------------------------------------------------------------------
              Item No.                        Docket No.                              Company
----------------------------------------------------------------------------------------------------------------
                                              Administrative Agenda
----------------------------------------------------------------------------------------------------------------
A-1................................  AD02-1-000.................  Agency Administrative Matters
A-2................................  AD02-7-000.................  Customer Matters, Reliability, Security and
                                                                   Market Operations
A-3................................  AD06-3-000.................  Market Update
------------------------------------
                                      Markets, Tariffs, and Rates--Electric
----------------------------------------------------------------------------------------------------------------
E-1................................  RM04-12-000................  Accounting and Financial Reporting for Public
                                                                   Utilities including RTOs
E-2................................  OMITTED....................
E-3................................  ER05-1236-000..............  Duke Power
E-4................................  EC05-103-000...............  Duke Energy Corporation Cinergy Corp.
E-5................................  ER05-1235-000..............  MidAmerican Energy Company
E-6................................  EC05-110-000...............  MidAmerican Energy Holdings Company
                                                                  Scottish Power plc
                                                                  PacifiCorp Holdings, Inc.
                                                                  PacifiCorp
E-7................................  ER06-78-000................  PJM Interconnection, L.L.C.
                                     ER06-78-001................
E-8................................  ER06-43-000................  Commonwealth Edison Company and Exelon
                                                                   Generation Company
E-9................................  ER06-58-000................  California Independent System Operator
                                                                   Corporation
E-10...............................  ER06-61-000................  California Independent System Operator
                                                                   Corporation
E-11...............................  ER05-1249-000..............  Granite State Electric Company
                                     ER05-1249-001..............  Massachusetts Electric Company
                                                                  The Narragansett Electric Company

[[Page 74002]]

 
                                                                  Niagara Mohawk Power Corporation
                                                                  New England Power Company
E-12...............................  OMITTED....................
E-13...............................  OMITTED....................
E-14...............................  ER93-465-034...............  Florida Power & Light Company
                                     ER96-417-003...............
                                     ER96-1375-004..............
                                     OA96-39-011................
                                     OA97-245-004...............
E-15...............................  OMITTED....................
E-16...............................  ER05-1085-001..............  Midwest Independent Transmission System
                                                                   Operator
                                     ER04-458-008...............
E-17...............................  ER93-465-035...............  Florida Power & Light Company
                                     ER96-417-004...............
                                     ER96-1375-005..............
                                     OA96-39-012................
                                     OA97-245-005...............
E-18...............................  ER05-1168-000..............  Attala Transmission, L.L.C.
E-19...............................  ER05-1056-001..............  Chehalis Power Generating, L.P.
E-20...............................  OMITTED....................
E-21...............................  EC05-43-000................  Exelon Corporation and Public Service
                                                                   Enterprise
                                     EC05-43-001................  Group, Inc.
E-22...............................  ER05-666-003...............  Southwest Power Pool, Inc.
E-23...............................  OMITTED....................
E-24...............................  OMITTED....................
E-25...............................  OMITTED....................
E-26...............................  EC05-132-000...............  Nevada Power Company
                                                                  GenWest LLC
------------------------------------
                                   Markets, Tariffs, and Rates--Miscellaneous
----------------------------------------------------------------------------------------------------------------
M-1................................  RM05-35-000................  Standard of Review for Modifications to
                                                                   Jurisdictional Agreements
------------------------------------
                                        Markets, Tariffs, and Rates--Gas
----------------------------------------------------------------------------------------------------------------
G-1................................  PR05-19-000................  Unocal Keystone Gas Storage, LLC
G-2................................  OR92-8-024.................  SFPP, L.P.
                                     OR93-5-015.................
                                     OR94-3-014.................
                                     OR94-4-016.................
                                     OR95-5-013.................  Mobil Oil Corporation v. SFPP, L.P.
                                     OR95-34-012................  Tosco Corporation v. SFPP, L.P.
                                     OR96-2-010.................  ARCO Products Co. a Division of Atlantic
                                                                   Richfield
                                     OR96-2-011.................  Company, Texaco Refining and Marketing Inc.,
                                                                   and
                                     OR96-10-007................  Mobil Oil Corporation v. SFPP, L.P.
                                     OR96-10-009................
                                     OR98-1-009.................
                                     OR98-1-011.................
                                     OR00-4-002.................
                                     OR96-2-003.................  Ultramar Diamond Shamrock Corporation and
                                     OR96-2-010.................  Ultramar, Inc. v. SFPP, L.P.
                                     OR96-10-008................
                                     OR96-10-009................
                                     OR96-17-004................
                                     OR96-17-006................
                                     OR97-2-004.................
                                     OR97-2-005.................
                                     OR98-2-005.................
                                     OR98-2-007.................
                                     OR00-8-005.................
                                     OR00-8-007.................
                                     OR98-13-005................  Tosco Corporation v. SFPP, L.P.
                                     OR98-13-007................
                                     OR00-9-005.................
                                     OR00-9-007.................
                                     OR00-7-005.................  Navajo Refining Corporation v. SFPP, L.P.
                                     OR00-7-006.................
                                     OR00-10-005................  Refinery Holding Company
                                     OR00-10-006................
                                     S98-1-001..................  SFPP, L.P.
                                     IS98-1-002.................

[[Page 74003]]

 
                                     IS04-323-002...............
------------------------------------
                                             Energy Projects--Hydro
----------------------------------------------------------------------------------------------------------------
H-1................................  P-9401-064.................  Mt. Hope Waterpower Project, LLP
H-2................................  P-487-041..................  PPL Holtwood, LLC
H-3................................  P-12597-001................  Birch Power Company
                                     P-12598-001................
                                     P-12599-001................  Wade Jacobsen
H-4................................  P-2064-012.................  Flambeau Hydro, LLC
H-5................................  P-10395-031................  Electric Plant Board of the City of Augusta,
                                                                   Kentucky
------------------------------------
                                          Energy Projects--Certificates
----------------------------------------------------------------------------------------------------------------
C-1................................  RM05-23-000................  Rate Regulation of Certain Underground Storage
                                     AD04-11-000................  Facilities
C-2................................  CP05-416-000...............  Tennessee Gas Pipeline Company
----------------------------------------------------------------------------------------------------------------


Magalie R. Sales,
Secretary.

    A free Webcast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its Webcast. The Capitol Connection provides technical 
support for the free Webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Perkowski or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in Hearing Room 2. Members of the public 
may view this briefing in the Commission Meeting overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 05-24048 Filed 12-9-05; 5:23 pm]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.