Cheyenne Plains Gas Pipeline Company, L.L.C.; Notice of Proposed Changes in FERC Gas Filing, 73462-73463 [E5-7224]

Download as PDF 73462 Federal Register / Vol. 70, No. 237 / Monday, December 12, 2005 / Notices 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–7228 Filed 12–9–05; 8:45 am] BILLING CODE 6717–01–P Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time December 13, 2005. DEPARTMENT OF ENERGY Magalie R. Salas, Secretary. [FR Doc. E5–7230 Filed 12–9–05; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. RP06-130-000] DEPARTMENT OF ENERGY CenterPoint Energy Gas Transmission Company; Notice of Revenue Credit Report Federal Energy Regulatory Commission December 6, 2005. Cheyenne Plains Gas Pipeline Company, L.L.C.; Notice of Proposed Changes in FERC Gas Filing Take notice that on December 1, 2005, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing its annual report of penalty revenue credits, covering such activity during the twelve month reporting period ended July 31, 2005. VerDate Aug<31>2005 17:51 Dec 09, 2005 Jkt 208001 [Docket No. RP06–124–000] December 6, 2005. Take notice that on November 30, 2005, Cheyenne Plains Gas Pipeline Company, L.L.C. (Cheyenne Plains) PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 tendered for filing one firm Transportation Service Agreement, a precedent agreement, and Second Revised Sheet No. 1 to its FERC Gas Tariff, Original Volume No. 1. Cheyenne Plains that the transportation service agreement supports the Commission’s approved expansion of the Cheyenne Plain’s pipeline system approved in Docket No. CP04–345–000. The accompanying tariff sheet is proposed to become effective January 1, 2006. Cheyenne Plains states that copies of its filing have been sent to all firm customers, interruptible customers, and affected state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\12DEN1.SGM 12DEN1 Federal Register / Vol. 70, No. 237 / Monday, December 12, 2005 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–7224 Filed 12–9–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on December 21, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–7210 Filed 12–9–05; 8:45 am] [Docket No. EC06–33–000] BILLING CODE 6717–01–P The Cincinnati Gas & Electric Company; Notice of Filing DEPARTMENT OF ENERGY December 6, 2005. Take notice that on November 30, 2005, The Cincinnati Gas & Electric Company (CG&E) and American Electric Power Service Corporation on behalf of Ohio Power Company and Indiana & Michigan Electric Company (AEP) (collectively, Applicants) tendered for filing an application requesting all necessary authorizations under section 203 of the Federal Power Act for CG&E and AEP to engage in a transfer of limited transmission assets from AEP to CG&E. Applicants state copies of this filing have been served on the Public Utilities Commission of Ohio. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the VerDate Aug<31>2005 17:51 Dec 09, 2005 Jkt 208001 73463 Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E5–7223 Filed 12–9–05; 8:45 am] [Docket No. RP06–123–000] BILLING CODE 6717–01–P Colorado Interstate Gas Company; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY December 6, 2005. Take notice that on November 30, 2005, Colorado Interstate Gas Company (CIG) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No 1, Fortieth Revised Sheet No. 11A , to become effective January 1, 2006. CIG states that copies of its filing have been sent to all firm customers, interruptible customers, and affected state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. EC06–31–000] Cross-Sound Cable Company, LLC et al.; Notice of Filing December 6, 2005. Take notice that on November 23, 2005, Cross-Sound Cable Company, LLC et al., (Applicants) pursuant to section 203 of the Federal Power Act submitted an application for transfer of certain assets. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\12DEN1.SGM 12DEN1

Agencies

[Federal Register Volume 70, Number 237 (Monday, December 12, 2005)]
[Notices]
[Pages 73462-73463]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7224]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-124-000]


Cheyenne Plains Gas Pipeline Company, L.L.C.; Notice of Proposed 
Changes in FERC Gas Filing

December 6, 2005.
    Take notice that on November 30, 2005, Cheyenne Plains Gas Pipeline 
Company, L.L.C. (Cheyenne Plains) tendered for filing one firm 
Transportation Service Agreement, a precedent agreement, and Second 
Revised Sheet No. 1 to its FERC Gas Tariff, Original Volume No. 1.
    Cheyenne Plains that the transportation service agreement supports 
the Commission's approved expansion of the Cheyenne Plain's pipeline 
system approved in Docket No. CP04-345-000. The accompanying tariff 
sheet is proposed to become effective January 1, 2006.
    Cheyenne Plains states that copies of its filing have been sent to 
all firm customers, interruptible customers, and affected state 
commissions.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call

[[Page 73463]]

(866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-7224 Filed 12-9-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.