Cheyenne Plains Gas Pipeline Company, L.L.C.; Notice of Proposed Changes in FERC Gas Filing, 73462-73463 [E5-7224]
Download as PDF
73462
Federal Register / Vol. 70, No. 237 / Monday, December 12, 2005 / Notices
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–7228 Filed 12–9–05; 8:45 am]
BILLING CODE 6717–01–P
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
December 13, 2005.
DEPARTMENT OF ENERGY
Magalie R. Salas,
Secretary.
[FR Doc. E5–7230 Filed 12–9–05; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. RP06-130-000]
DEPARTMENT OF ENERGY
CenterPoint Energy Gas Transmission
Company; Notice of Revenue Credit
Report
Federal Energy Regulatory
Commission
December 6, 2005.
Cheyenne Plains Gas Pipeline
Company, L.L.C.; Notice of Proposed
Changes in FERC Gas Filing
Take notice that on December 1, 2005,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing its
annual report of penalty revenue
credits, covering such activity during
the twelve month reporting period
ended July 31, 2005.
VerDate Aug<31>2005
17:51 Dec 09, 2005
Jkt 208001
[Docket No. RP06–124–000]
December 6, 2005.
Take notice that on November 30,
2005, Cheyenne Plains Gas Pipeline
Company, L.L.C. (Cheyenne Plains)
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
tendered for filing one firm
Transportation Service Agreement, a
precedent agreement, and Second
Revised Sheet No. 1 to its FERC Gas
Tariff, Original Volume No. 1.
Cheyenne Plains that the
transportation service agreement
supports the Commission’s approved
expansion of the Cheyenne Plain’s
pipeline system approved in Docket No.
CP04–345–000. The accompanying tariff
sheet is proposed to become effective
January 1, 2006.
Cheyenne Plains states that copies of
its filing have been sent to all firm
customers, interruptible customers, and
affected state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\12DEN1.SGM
12DEN1
Federal Register / Vol. 70, No. 237 / Monday, December 12, 2005 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–7224 Filed 12–9–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 21, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–7210 Filed 12–9–05; 8:45 am]
[Docket No. EC06–33–000]
BILLING CODE 6717–01–P
The Cincinnati Gas & Electric
Company; Notice of Filing
DEPARTMENT OF ENERGY
December 6, 2005.
Take notice that on November 30,
2005, The Cincinnati Gas & Electric
Company (CG&E) and American Electric
Power Service Corporation on behalf of
Ohio Power Company and Indiana &
Michigan Electric Company (AEP)
(collectively, Applicants) tendered for
filing an application requesting all
necessary authorizations under section
203 of the Federal Power Act for CG&E
and AEP to engage in a transfer of
limited transmission assets from AEP to
CG&E.
Applicants state copies of this filing
have been served on the Public Utilities
Commission of Ohio.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
VerDate Aug<31>2005
17:51 Dec 09, 2005
Jkt 208001
73463
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E5–7223 Filed 12–9–05; 8:45 am]
[Docket No. RP06–123–000]
BILLING CODE 6717–01–P
Colorado Interstate Gas Company;
Notice of Proposed Changes in FERC
Gas Tariff
DEPARTMENT OF ENERGY
December 6, 2005.
Take notice that on November 30,
2005, Colorado Interstate Gas Company
(CIG) tendered for filing as part of its
FERC Gas Tariff, First Revised Volume
No 1, Fortieth Revised Sheet No. 11A ,
to become effective January 1, 2006.
CIG states that copies of its filing have
been sent to all firm customers,
interruptible customers, and affected
state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EC06–31–000]
Cross-Sound Cable Company, LLC et
al.; Notice of Filing
December 6, 2005.
Take notice that on November 23,
2005, Cross-Sound Cable Company, LLC
et al., (Applicants) pursuant to section
203 of the Federal Power Act submitted
an application for transfer of certain
assets.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 70, Number 237 (Monday, December 12, 2005)]
[Notices]
[Pages 73462-73463]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7224]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP06-124-000]
Cheyenne Plains Gas Pipeline Company, L.L.C.; Notice of Proposed
Changes in FERC Gas Filing
December 6, 2005.
Take notice that on November 30, 2005, Cheyenne Plains Gas Pipeline
Company, L.L.C. (Cheyenne Plains) tendered for filing one firm
Transportation Service Agreement, a precedent agreement, and Second
Revised Sheet No. 1 to its FERC Gas Tariff, Original Volume No. 1.
Cheyenne Plains that the transportation service agreement supports
the Commission's approved expansion of the Cheyenne Plain's pipeline
system approved in Docket No. CP04-345-000. The accompanying tariff
sheet is proposed to become effective January 1, 2006.
Cheyenne Plains states that copies of its filing have been sent to
all firm customers, interruptible customers, and affected state
commissions.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 73463]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-7224 Filed 12-9-05; 8:45 am]
BILLING CODE 6717-01-P