J-W Pipeline Company; Notice of Petition for Rate Approval, 73219 [E5-7143]
Download as PDF
Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR06–4–000]
J–W Pipeline Company; Notice of
Petition for Rate Approval
December 2, 2005.
Take notice that on November 21,
2005, J–W Pipeline Company (J–W
Pipeline) filed a petition for rate
approval pursuant to section
284.123(b)(2) of the Commission’s
regulations. J–W Pipeline proposes the
following rates for its NGPA section
311(a)(2) transportation services on its
Gravel Point South and Kingston Lanes:
a demand charge of $.6547 per MMBtu
for firm transportation, with no
commodity charge for firm service, and
a $.0215 per MMBtu for interruptible
transportation. J–W Pipeline also
requests authority to retain from its
shippers actual compressor fuel and
lost-and-unaccounted-for volumes on
the system, not to exceed 2% of
volumes received by J–W Pipeline.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
VerDate Aug<31>2005
14:22 Dec 08, 2005
Jkt 208001
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time
December 23, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–7143 Filed 12–8–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP06–110–000]
Northern Border Pipeline Company;
Notice of Tariff Filing
73219
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–7146 Filed 12–8–05; 8:45 am]
BILLING CODE 6717–01–P
December 2, 2005.
Take notice that on November 29,
2005, Northern Border Pipeline
Company (Northern Border) tendered
for filing to become part of its FERC Gas
Tariff, First Revised Volume No. 1,
Tenth Revised Sheet No. 99A, become
effective January 1, 2006.
Northern Border states that this filing
is being made to amend the Statement
of Negotiated Rates to reflect the
deletion of an agreement with The
Peoples Gas Light and Coke which
expires under its own terms on
December 31, 2005.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. TS06–3–000]
Pine Prairie Energy Center, LLC;
Notice of Filing
December 2, 2005.
Take notice that on November 14,
2005, Pine Prairie Energy Center, LLC
tendered for filing a request for an
exemption from the Standards of
Conduct pursuant to 18 CFR 385.3(a)(3).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
E:\FR\FM\09DEN1.SGM
09DEN1
Agencies
[Federal Register Volume 70, Number 236 (Friday, December 9, 2005)]
[Notices]
[Page 73219]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7143]
[[Page 73219]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR06-4-000]
J-W Pipeline Company; Notice of Petition for Rate Approval
December 2, 2005.
Take notice that on November 21, 2005, J-W Pipeline Company (J-W
Pipeline) filed a petition for rate approval pursuant to section
284.123(b)(2) of the Commission's regulations. J-W Pipeline proposes
the following rates for its NGPA section 311(a)(2) transportation
services on its Gravel Point South and Kingston Lanes: a demand charge
of $.6547 per MMBtu for firm transportation, with no commodity charge
for firm service, and a $.0215 per MMBtu for interruptible
transportation. J-W Pipeline also requests authority to retain from its
shippers actual compressor fuel and lost-and-unaccounted-for volumes on
the system, not to exceed 2% of volumes received by J-W Pipeline.
Any person desiring to participate in this rate proceeding must
file a motion to intervene or to protest this filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the
Applicant. Anyone filing an intervention or protest on or before the
intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. eastern time December 23, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5-7143 Filed 12-8-05; 8:45 am]
BILLING CODE 6717-01-P