Environmental Impact Statements and Regulations; Availability of EPA Comments, 73232-73233 [E5-7121]
Download as PDF
73232
Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped bydocket numbers in
ascending order. These filings are
available for review at the Commission
in the Public Reference Room or may be
Docket No.
Date received
Prohibited:
1. ER03–563–030 ...................................................................................
2. Project Nos. 2539–000 and 12522–000 .............................................
Exempt:
1. PF05–14–000 ......................................................................................
2. Project No. 459–128–000 ...................................................................
3. Project Nos. 2111–000, 2071–000 and 935–000 ...............................
4. Project Nos. 2153–000 .......................................................................
5. Project No. 2219–000 .........................................................................
6 Project No. 2630–000 ..........................................................................
7 Project Nos. 9185–009 and 9184–013 ................................................
8 Project Nos. 9185–009 and 9134–013 ................................................
1 One
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866)208–3676, or for TTY,
contact (202)502–8659.
Presenter or requester
11–9–05 .............................................
11–15–05 ...........................................
Alice & David Cornish.
Elizabeth Wright.1
11–16–05
11–28–05
11–16–05
11–16–05
11–22–05
11–16–05
11–22–05
11–25–05
Amy Davis.
Peter Goode.
Nancy Kochan.
Nancy Kochan.
Hon. Orrin G. Hatch.
Kirk E. Ranzetta.
Sarah Kulpa.
Sarah Kulpa.
...........................................
...........................................
...........................................
...........................................
...........................................
...........................................
...........................................
...........................................
of five postcard submittals filed in Project Nos. 2539–000 and 12522–000 between November 15, 2005 and November 30, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–7095 Filed 12–8–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM06–7–000]
Proposed Amendments to Blanket
Construction Certificates; Notice of
Petition for Rulemaking
December 5, 2005.
On November 22, 2005, the Interstate
Natural Gas Association of America and
the Natural Gas Supply Association
filed a petition under § 385.2087(a) of
the Commission’s regulations seeking a
rulemaking to make certain regulatory
and policy changes that they contend
will improve the ability of the natural
industry to ensure the adequacy of the
interstate pipeline infrastructure.
Specifically, the petition seeks a
rulemaking to eliminate the exclusion of
mainline expansions, underground
storage enhancements, and LNG takeaway facilities from blanket eligibility
under § 157.202(b)(2)(ii)(C) and (D) of
the Commission’s regulations. They also
request that the Commission revise the
blanket dollar limits under § 157.208(d)
of the Commission’s regulations to
reflect updated project development and
construction costs. Finally, they ask that
the Commission issue a policy
statement or rule to clarify that it would
not constitute undue discrimination for
VerDate Aug<31>2005
14:22 Dec 08, 2005
Jkt 208001
a project’s ‘‘foundation shippers’’ to
receive favorable rate treatment
compared with other shippers in the
same project.
The Commission has not yet
determined whether the public interest
would be served by conducting the
rulemaking proposed by the petitioners
and, in its discretion, brings this
petition to the attention of the public.
This notice is not a notice of proposed
rulemaking, but merely provides the
public with an opportunity to comment
in writing on the question of whether
the Commission should take further
action on the petition. Any person
desiring to be heard with reference to
the petition should file comments on or
before January 17, 2006.
The petition is on file with the
Commission and open to public
inspection at the Commission’s Public
Reference Room or may be viewed on
the Commission’s Web site at
http:/www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number field to
access the document. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
The Commission strongly encourages
electronic filings of comments via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Nora E. Donovan,
Management Analyst.
[FR Doc. E5–7100 Filed 12–8–05; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6670–02]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (EDP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
(202) 564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated May 18, 2001 (97 FR 27647).
Draft EISs
EIS No. 20050348, EDP No. D–NPS–
L65492–WA, Bey’s Landing National
Historical Reserve General Management
Plan, Implementation, Town of
Coupeville, Island County, WA.
Summary: EPA does not object to the
proposed project; however, EPA did
request clarification of future
environmental monitoring activities.
Rating LO.
EIS No. 20050382, EDP No. D–BIA–
F60008–WI, Menominee Casino-Hotel
223-Acre Fee-to-Trust Transfer and
Casino Project, Implementation, Federal
Trust, Menominee Indian Tribe of
Wisconsin (Tribe), in City of Kenosha
and County of Kenosha, WI.
Summary: EPA expressed
environmental concerns about general
E:\FR\FM\09DEN1.SGM
09DEN1
Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices
conformity, energy and water
conservation, and cumulative impacts
analysis. Rating EC2.
EIS No. 20050406, EDP No. D–FHW–
L40228–WA, South Park Bridge Project,
Proposes to Rehabilitate or Replace the
Historic South Park Ridge over the
Duwamish Waterway at 14th/16 Avenue
S, U.S. Coast Guard Permit and U.S.
Army COE Section 10 and 404 Permits,
King County, WA.
Summary: EPA expressed
environmental concerns about water
quality, hazardous waste, and
environmental justice impacts related to
the project, and requested additional
information in the final EIS. Rating EC1.
EIS No. 20050421, EDP No. D–HUD–
C85046–NY, Ashburton Avenue Master
Plan and Urban Renewal Plan/Mulford
Hope VI Revitalization Plan,
Development, Implementation, Yonkers
City, Westchester County, NY.
Summary: EPA expressed
environmental concerns about air
quality impacts and the need for a
General Conformity Determination.
Rating EC2.
EIS No. 20050445, EDP No. D–NPS–
J61108–SD, Badlands National Park/
North Unit General Management Plan,
Implementation, Jackson, Pennington
and Shannon Counties, SD.
Summary: EPA expressed
environmental concerns about potential
air quality, riparian and other water
resources, and wildlife habitat impacts,
and recommended further evaluation of
these impacts, including a discussion of
potential mitigation measures, be
included in the Final EIS. Rating EC2.
Final EISs
EIS No. 20050443, ERP No. F–FHW–
H40182–00, US–159 Missouri River
Crossing Project, Rehabilitation or
Replacement of the Missouri River
Bridge at Rulo, Funding and U.S. Army
COE Section 404 Permit, Richardson
County, NE and Holt County, MO.
Summary: EPA does not object to the
proposed project and appreciates the
additional coordination afforded to 4(f)
properties, as well as the inclusion of
Traffic System Management/Travel
Demand Management in combination
with the preferred alternative.
EIS No. 20050458, ERP No. F–AFS–
J65450–SD, Deerfield Project Area,
Proposes to Implement Multiple
Resource Management Actions, Mystic
Ranger District, Black Hills National
Forest, Pennington County, SD.
Summary: EPA remains concerned
about water quality impacts from
additional runoff and related erosion
and sediment losses. In addition, EPA
continues to express environmental
concerns about cumulative impacts to
VerDate Aug<31>2005
14:22 Dec 08, 2005
Jkt 208001
soils, water quality, aquatic resources,
and fish and wildlife habitats and
populations.
Dated: December 6, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7121 Filed 12–8–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6670–01]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed November 28, 2005 Through
December 2, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050501, Draft EIS, NRS, AR,
Walnut Bayou Irrigation Project,
Natural Resource Plan for the Little
Red River Watershed, Little River
County, AR, Comment Period Ends:
January 23, 2006, Contact: Kalven L.
Trice 501–301–3100.
EIS No. 20050502, Final EIS, AFS, MT,
Fishtrap Project, Proposed Timber
Harvest, Prescribed Burning, Road
Construction and Other Restoration
Activities, Lolo National Forest,
Plains/Thompson Falls Ranger
District, Sanders County, MT, Wait
Period Ends: January 9, 2006, Contact:
Randy Hojem 406–826–4308.
EIS No. 20050503, Draft EIS, GSA, WA,
Peace Arch Port of Entry
Redevelopment Project,
Improvements to Security, Safety and
Functionality, Canadian Border in
Blaine, Whatcom County, WA,
Comment Period Ends: January 23,
2006, Contact: Michael Levine 253–
931–7263.
EIS No. 20050504, Draft Supplement,
COE, MO, St. Johns Bayou and New
Madrid Floodway Project, Channel
Enlargement and Improvement,
Revised Information to Clarify and
Address Issues of Concern, Flood
Control National Economic
Development (NED), New Madrid,
Mississippi and Scott Counties, MO,
Comment Period Ends: January 23,
2006, Contact: Danny Ward 901–544–
0709.
EIS No. 20050505, Final EIS, AFS, 00,
Caribou Travel Plan Revision,
Determine the Motorized Road and
Trail System, Implementation,
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
73233
Caribou-Targhee National Forest,
Westside, Soda Spring and
Montpeller Ranger Districts, Bannock,
Bear River, Bonneville, Caribou,
Franklin, Oneida and Power Counties,
ID; Box Elder and Cache Counties, UT
and Lincoln County, WY, Wait Period
Ends: January 9, 2006, Contact: Deb
Tiller 208–557–5779.
EIS No. 20050506, Final EIS, NOA, 00,
Pacific Coast Groundfish Fishery
Management Plan, To Conserve and
Enhance Essential Fish Habitat (EFH)
Designation and Minimization of
Advise Impacts, Coast Exclusive
Economic Zone, WA, OR and CA,
Wait Period Ends: January 9, 2006,
Contact: Dr. Robert Lohn 206–526–
6150.
EIS No. 20050507, Draft EIS, BLM, NV,
Sheep Complex, Big Springs and
Owyhee Grazing Allotments Sensitive
Bird Species Project, Determine
Impacts of Livestock Grazing, Elko
County, NV, Comment Period Ends:
January 23, 2006, Contact: Lorrie West
775–753–0200.
EIS No. 20050508, Final EIS, NPS, IN,
Lincoln Boyhood National Memorial
General Management Plan,
Implementation, Lincoln City Spencer
County, IN, Wait Period Ends: January
9, 2006, Contact: Nick Chevance 402–
661–1844.
EIS No. 20050509, Final Supplement,
COE, FL, Central and Southern
Florida Project, Tamiami Trail
Modifications, Modified Water
Deliveries to Everglades National
Park, Authorized Flow of Water from
WCA–38 and the L–29 Canal North of
the Tamiami Trail, Dade County, FL,
Wait Period Ends: January 9, 2006,
Contact: Dr. Jonathan Moulding 904–
232–2286.
EIS No. 20050510, Draft EIS, FHW, 00,
I–81 Corridor Improvement Study in
Virginia , Transportation
Improvements from the Tennessee
Border to the West Virginia Border,
(Tier 1), Several Counties, VA and
WV, Comment Period Ends: February
17, 2006, Contact: John Simkins 804–
775–3342.
EIS No. 20050511, Draft EIS, DOE, PA,
Gilberton Coal-to-Clean Fuels and
Power Project, Construction and
Operation a New Demonstration
Plant, Schuylkill County, PA,
Comment Period Ends: February 8,
2006, Contact: Janice L. Bell 1–866–
576–8240.
EIS No. 20050512, Final EIS, NPS, DC,
Rock Creek Park and the Rock Creek
and Potomac Parkway Project,
General Management Plan,
Implementation, Washington, DC,
Wait Period Ends: January 9, 2006,
E:\FR\FM\09DEN1.SGM
09DEN1
Agencies
[Federal Register Volume 70, Number 236 (Friday, December 9, 2005)]
[Notices]
[Pages 73232-73233]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7121]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6670-02]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (EDP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated May 18, 2001 (97 FR
27647).
Draft EISs
EIS No. 20050348, EDP No. D-NPS-L65492-WA, Bey's Landing National
Historical Reserve General Management Plan, Implementation, Town of
Coupeville, Island County, WA.
Summary: EPA does not object to the proposed project; however, EPA
did request clarification of future environmental monitoring
activities. Rating LO.
EIS No. 20050382, EDP No. D-BIA-F60008-WI, Menominee Casino-Hotel
223-Acre Fee-to-Trust Transfer and Casino Project, Implementation,
Federal Trust, Menominee Indian Tribe of Wisconsin (Tribe), in City of
Kenosha and County of Kenosha, WI.
Summary: EPA expressed environmental concerns about general
[[Page 73233]]
conformity, energy and water conservation, and cumulative impacts
analysis. Rating EC2.
EIS No. 20050406, EDP No. D-FHW-L40228-WA, South Park Bridge
Project, Proposes to Rehabilitate or Replace the Historic South Park
Ridge over the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard
Permit and U.S. Army COE Section 10 and 404 Permits, King County, WA.
Summary: EPA expressed environmental concerns about water quality,
hazardous waste, and environmental justice impacts related to the
project, and requested additional information in the final EIS. Rating
EC1.
EIS No. 20050421, EDP No. D-HUD-C85046-NY, Ashburton Avenue Master
Plan and Urban Renewal Plan/Mulford Hope VI Revitalization Plan,
Development, Implementation, Yonkers City, Westchester County, NY.
Summary: EPA expressed environmental concerns about air quality
impacts and the need for a General Conformity Determination. Rating
EC2.
EIS No. 20050445, EDP No. D-NPS-J61108-SD, Badlands National Park/
North Unit General Management Plan, Implementation, Jackson, Pennington
and Shannon Counties, SD.
Summary: EPA expressed environmental concerns about potential air
quality, riparian and other water resources, and wildlife habitat
impacts, and recommended further evaluation of these impacts, including
a discussion of potential mitigation measures, be included in the Final
EIS. Rating EC2.
Final EISs
EIS No. 20050443, ERP No. F-FHW-H40182-00, US-159 Missouri River
Crossing Project, Rehabilitation or Replacement of the Missouri River
Bridge at Rulo, Funding and U.S. Army COE Section 404 Permit,
Richardson County, NE and Holt County, MO.
Summary: EPA does not object to the proposed project and
appreciates the additional coordination afforded to 4(f) properties, as
well as the inclusion of Traffic System Management/Travel Demand
Management in combination with the preferred alternative.
EIS No. 20050458, ERP No. F-AFS-J65450-SD, Deerfield Project Area,
Proposes to Implement Multiple Resource Management Actions, Mystic
Ranger District, Black Hills National Forest, Pennington County, SD.
Summary: EPA remains concerned about water quality impacts from
additional runoff and related erosion and sediment losses. In addition,
EPA continues to express environmental concerns about cumulative
impacts to soils, water quality, aquatic resources, and fish and
wildlife habitats and populations.
Dated: December 6, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7121 Filed 12-8-05; 8:45 am]
BILLING CODE 6560-50-P