Environmental Impacts Statements; Notice of Availability, 73233-73234 [E5-7120]

Download as PDF Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices conformity, energy and water conservation, and cumulative impacts analysis. Rating EC2. EIS No. 20050406, EDP No. D–FHW– L40228–WA, South Park Bridge Project, Proposes to Rehabilitate or Replace the Historic South Park Ridge over the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard Permit and U.S. Army COE Section 10 and 404 Permits, King County, WA. Summary: EPA expressed environmental concerns about water quality, hazardous waste, and environmental justice impacts related to the project, and requested additional information in the final EIS. Rating EC1. EIS No. 20050421, EDP No. D–HUD– C85046–NY, Ashburton Avenue Master Plan and Urban Renewal Plan/Mulford Hope VI Revitalization Plan, Development, Implementation, Yonkers City, Westchester County, NY. Summary: EPA expressed environmental concerns about air quality impacts and the need for a General Conformity Determination. Rating EC2. EIS No. 20050445, EDP No. D–NPS– J61108–SD, Badlands National Park/ North Unit General Management Plan, Implementation, Jackson, Pennington and Shannon Counties, SD. Summary: EPA expressed environmental concerns about potential air quality, riparian and other water resources, and wildlife habitat impacts, and recommended further evaluation of these impacts, including a discussion of potential mitigation measures, be included in the Final EIS. Rating EC2. Final EISs EIS No. 20050443, ERP No. F–FHW– H40182–00, US–159 Missouri River Crossing Project, Rehabilitation or Replacement of the Missouri River Bridge at Rulo, Funding and U.S. Army COE Section 404 Permit, Richardson County, NE and Holt County, MO. Summary: EPA does not object to the proposed project and appreciates the additional coordination afforded to 4(f) properties, as well as the inclusion of Traffic System Management/Travel Demand Management in combination with the preferred alternative. EIS No. 20050458, ERP No. F–AFS– J65450–SD, Deerfield Project Area, Proposes to Implement Multiple Resource Management Actions, Mystic Ranger District, Black Hills National Forest, Pennington County, SD. Summary: EPA remains concerned about water quality impacts from additional runoff and related erosion and sediment losses. In addition, EPA continues to express environmental concerns about cumulative impacts to VerDate Aug<31>2005 14:22 Dec 08, 2005 Jkt 208001 soils, water quality, aquatic resources, and fish and wildlife habitats and populations. Dated: December 6, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E5–7121 Filed 12–8–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6670–01] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed November 28, 2005 Through December 2, 2005 Pursuant to 40 CFR 1506.9. EIS No. 20050501, Draft EIS, NRS, AR, Walnut Bayou Irrigation Project, Natural Resource Plan for the Little Red River Watershed, Little River County, AR, Comment Period Ends: January 23, 2006, Contact: Kalven L. Trice 501–301–3100. EIS No. 20050502, Final EIS, AFS, MT, Fishtrap Project, Proposed Timber Harvest, Prescribed Burning, Road Construction and Other Restoration Activities, Lolo National Forest, Plains/Thompson Falls Ranger District, Sanders County, MT, Wait Period Ends: January 9, 2006, Contact: Randy Hojem 406–826–4308. EIS No. 20050503, Draft EIS, GSA, WA, Peace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA, Comment Period Ends: January 23, 2006, Contact: Michael Levine 253– 931–7263. EIS No. 20050504, Draft Supplement, COE, MO, St. Johns Bayou and New Madrid Floodway Project, Channel Enlargement and Improvement, Revised Information to Clarify and Address Issues of Concern, Flood Control National Economic Development (NED), New Madrid, Mississippi and Scott Counties, MO, Comment Period Ends: January 23, 2006, Contact: Danny Ward 901–544– 0709. EIS No. 20050505, Final EIS, AFS, 00, Caribou Travel Plan Revision, Determine the Motorized Road and Trail System, Implementation, PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 73233 Caribou-Targhee National Forest, Westside, Soda Spring and Montpeller Ranger Districts, Bannock, Bear River, Bonneville, Caribou, Franklin, Oneida and Power Counties, ID; Box Elder and Cache Counties, UT and Lincoln County, WY, Wait Period Ends: January 9, 2006, Contact: Deb Tiller 208–557–5779. EIS No. 20050506, Final EIS, NOA, 00, Pacific Coast Groundfish Fishery Management Plan, To Conserve and Enhance Essential Fish Habitat (EFH) Designation and Minimization of Advise Impacts, Coast Exclusive Economic Zone, WA, OR and CA, Wait Period Ends: January 9, 2006, Contact: Dr. Robert Lohn 206–526– 6150. EIS No. 20050507, Draft EIS, BLM, NV, Sheep Complex, Big Springs and Owyhee Grazing Allotments Sensitive Bird Species Project, Determine Impacts of Livestock Grazing, Elko County, NV, Comment Period Ends: January 23, 2006, Contact: Lorrie West 775–753–0200. EIS No. 20050508, Final EIS, NPS, IN, Lincoln Boyhood National Memorial General Management Plan, Implementation, Lincoln City Spencer County, IN, Wait Period Ends: January 9, 2006, Contact: Nick Chevance 402– 661–1844. EIS No. 20050509, Final Supplement, COE, FL, Central and Southern Florida Project, Tamiami Trail Modifications, Modified Water Deliveries to Everglades National Park, Authorized Flow of Water from WCA–38 and the L–29 Canal North of the Tamiami Trail, Dade County, FL, Wait Period Ends: January 9, 2006, Contact: Dr. Jonathan Moulding 904– 232–2286. EIS No. 20050510, Draft EIS, FHW, 00, I–81 Corridor Improvement Study in Virginia , Transportation Improvements from the Tennessee Border to the West Virginia Border, (Tier 1), Several Counties, VA and WV, Comment Period Ends: February 17, 2006, Contact: John Simkins 804– 775–3342. EIS No. 20050511, Draft EIS, DOE, PA, Gilberton Coal-to-Clean Fuels and Power Project, Construction and Operation a New Demonstration Plant, Schuylkill County, PA, Comment Period Ends: February 8, 2006, Contact: Janice L. Bell 1–866– 576–8240. EIS No. 20050512, Final EIS, NPS, DC, Rock Creek Park and the Rock Creek and Potomac Parkway Project, General Management Plan, Implementation, Washington, DC, Wait Period Ends: January 9, 2006, E:\FR\FM\09DEN1.SGM 09DEN1 73234 Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices Contact: Patrick Gregerson 202–619– 7277. EIS No. 20050513, Final EIS, AFS, AR, Ozark-St. Francis National Forests Proposed Revised Land and Resource Management Plan, Implementation, Several Counties, AR, Wait Period Ends: January 9, 2006, Contact: Gary Knudsen 479–964–7200. EIS No. 20050514, Final EIS, NIH, ME, National Emerging Infectious Laboratories, Selected the Preferred Alternative, Construction of National Biocontainment Laboratory, BioSquare Research Park, Boston University Medical Center Campus, Boston, MA, Wait Period Ends: January 9, 2006, Contact: Valerie Nottingham 301–496–7775. Amended Notices EIS No. 20050469, Draft EIS, NOA, 00, Programmatic—Towards an Ecosystem Approach for the Western Pacific Region: From Species Based Fishery Management Plans to PlaceBased Fishery Ecosystem Plans, Realignment, Implementation, Western Pacific Region (America Samoa, Guam, Hawaii, Commonwealth of the Northern Mariana Islands), and U.S. Pacific Remote Island Areas, Comment Period Ends: December 27, 2005, Contact: William L. Robinson 808– 944–2200. Revision of FR Notice Published November 10, 2005: Correction to Comment Period from December 26, 2005 to December 27, 2005. Also, this document is available on the Internet at: https://swr.nmfs.noaa.gov/pir. Dated: December 6, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E5–7120 Filed 12–8–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2005–0318; FRL–7748–5] Notice of Filing of a Pesticide Petition Amendment to Regulations for Residues of the Biochemical Pesticide 2,6–diisopropylnaphthalene (2,6–DIPN) in or on Potatoes Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: This notice announces the initial filing of a pesticide petition proposing the amendment of regulations for residues of the biochemical pesticide VerDate Aug<31>2005 14:22 Dec 08, 2005 Jkt 208001 2,6–diisopropylnaphthalene (2,6–DIPN) in or on the food commodities whole potatoes at 2 parts per million (ppm) and potato peels at 6 ppm. DATES: Comments must be received on or before January 9, 2006. ADDRESSES: Comments, identified by docket identification (ID) number EPA– HQ–OPP–2005–0318 and pesticide petition (PP) number 1F6338, may be submitted electronically, by mail, or through hand delivery or courier. Follow the detailed instructions as provided in Unit I. of the SUPPLEMENTARY INFORMATION. FOR FURTHER INFORMATION CONTACT: Denise Greenway, Biopesticides and Pollution Prevention Division, (7511C), Office of Pesticide Programs, U. S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001, telephone number: (703) 308–8263, e-mail address: greenway.denise@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? You may be potentially affected by this action if you are an agricultural producer, food manufacturer, or pesticide manufacturer. Potentially affected entities may include, but are not limited to: • Crop production (NAICS code 111). • Animal production (NAICS code 112). • Food manufacturing (NAICS code 311). • Pesticide manufacturing (NAICS code 32532). This listing is not intended to be exhaustive, but rather provides a guide for readers regarding entities likely to be affected by this action. Other types of entities not listed in this unit could also be affected. The North American Industrial Classification System (NAICS) codes have been provided to assist you and others in determining whether this action might apply to certain entities. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. How Can I Get Copies of this Document and Other Related Information? 1. Docket. EPA has established an official public docket for this action under docket ID number EPA–HQ– OPP–2005–0318. The official public docket consists of the documents specifically referenced in this action, any public comments received, and PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 other information related to this action. Although a part of the official docket, the public docket does not include Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. The official public docket is the collection of materials that is available for public viewing at the Public Information and Records Integrity Branch (PIRIB), Rm. 119, Crystal Mall #2, 1801 S. Bell St., Arlington, VA. This docket facility is open from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The docket telephone number is (703) 305–5805. 2. Electronic access.You may access this document electronically through the EPA Internet under the ‘‘Federal Register’’ listings at https:// www.epa.gov/fedrgstr/. Agency Website: EDOCKET, EPA’s electronic public docket and comment system was replaced on November 25, 2005, by an enhanced federal-wide electronic docket management and comment system located at https:// www.regulations.gov/. Follow the online instructions. An electronic version of the public docket is available through EPA’s electronic public docket and comment system, EPA Dockets. You may use EPA Dockets at https://www.epa.gov/edocket/ to submit or view public comments, to access the index listing of the contents of the official public docket, and to access those documents in the public docket that are available electronically. Although not all docket materials may be available electronically, you may still access any of the publicly available docket materials through the docket facility identified in Unit I.B.1. Once in the system, select ‘‘search,’’ then key in the appropriate docket ID number. Certain types of information will not be placed in the EPA Dockets. Information claimed as CBI and other information whose disclosure is restricted by statute, which is not included in the official public docket, will not be available for public viewing in EPA’s electronic public docket. EPA’s policy is that copyrighted material will not be placed in EPA’s electronic public docket but will be available only in printed, paper form in the official public docket. To the extent feasible, publicly available docket materials will be made available in EPA’s electronic public docket. When a document is selected from the index list in EPA Dockets, the system will identify whether the document is available for viewing in EPA’s electronic public docket. Although not all docket materials may be available electronically, you may still access any of the publicly available E:\FR\FM\09DEN1.SGM 09DEN1

Agencies

[Federal Register Volume 70, Number 236 (Friday, December 9, 2005)]
[Notices]
[Pages 73233-73234]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7120]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6670-01]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed November 28, 2005 Through December 2, 2005
Pursuant to 40 CFR 1506.9.

EIS No. 20050501, Draft EIS, NRS, AR, Walnut Bayou Irrigation Project, 
Natural Resource Plan for the Little Red River Watershed, Little River 
County, AR, Comment Period Ends: January 23, 2006, Contact: Kalven L. 
Trice 501-301-3100.
EIS No. 20050502, Final EIS, AFS, MT, Fishtrap Project, Proposed Timber 
Harvest, Prescribed Burning, Road Construction and Other Restoration 
Activities, Lolo National Forest, Plains/Thompson Falls Ranger 
District, Sanders County, MT, Wait Period Ends: January 9, 2006, 
Contact: Randy Hojem 406-826-4308.
EIS No. 20050503, Draft EIS, GSA, WA, Peace Arch Port of Entry 
Redevelopment Project, Improvements to Security, Safety and 
Functionality, Canadian Border in Blaine, Whatcom County, WA, Comment 
Period Ends: January 23, 2006, Contact: Michael Levine 253-931-7263.
EIS No. 20050504, Draft Supplement, COE, MO, St. Johns Bayou and New 
Madrid Floodway Project, Channel Enlargement and Improvement, Revised 
Information to Clarify and Address Issues of Concern, Flood Control 
National Economic Development (NED), New Madrid, Mississippi and Scott 
Counties, MO, Comment Period Ends: January 23, 2006, Contact: Danny 
Ward 901-544-0709.
EIS No. 20050505, Final EIS, AFS, 00, Caribou Travel Plan Revision, 
Determine the Motorized Road and Trail System, Implementation, Caribou-
Targhee National Forest, Westside, Soda Spring and Montpeller Ranger 
Districts, Bannock, Bear River, Bonneville, Caribou, Franklin, Oneida 
and Power Counties, ID; Box Elder and Cache Counties, UT and Lincoln 
County, WY, Wait Period Ends: January 9, 2006, Contact: Deb Tiller 208-
557-5779.
EIS No. 20050506, Final EIS, NOA, 00, Pacific Coast Groundfish Fishery 
Management Plan, To Conserve and Enhance Essential Fish Habitat (EFH) 
Designation and Minimization of Advise Impacts, Coast Exclusive 
Economic Zone, WA, OR and CA, Wait Period Ends: January 9, 2006, 
Contact: Dr. Robert Lohn 206-526-6150.
EIS No. 20050507, Draft EIS, BLM, NV, Sheep Complex, Big Springs and 
Owyhee Grazing Allotments Sensitive Bird Species Project, Determine 
Impacts of Livestock Grazing, Elko County, NV, Comment Period Ends: 
January 23, 2006, Contact: Lorrie West 775-753-0200.
EIS No. 20050508, Final EIS, NPS, IN, Lincoln Boyhood National Memorial 
General Management Plan, Implementation, Lincoln City Spencer County, 
IN, Wait Period Ends: January 9, 2006, Contact: Nick Chevance 402-661-
1844.
EIS No. 20050509, Final Supplement, COE, FL, Central and Southern 
Florida Project, Tamiami Trail Modifications, Modified Water Deliveries 
to Everglades National Park, Authorized Flow of Water from WCA-38 and 
the L-29 Canal North of the Tamiami Trail, Dade County, FL, Wait Period 
Ends: January 9, 2006, Contact: Dr. Jonathan Moulding 904-232-2286.
EIS No. 20050510, Draft EIS, FHW, 00, I-81 Corridor Improvement Study 
in Virginia , Transportation Improvements from the Tennessee Border to 
the West Virginia Border, (Tier 1), Several Counties, VA and WV, 
Comment Period Ends: February 17, 2006, Contact: John Simkins 804-775-
3342.
EIS No. 20050511, Draft EIS, DOE, PA, Gilberton Coal-to-Clean Fuels and 
Power Project, Construction and Operation a New Demonstration Plant, 
Schuylkill County, PA, Comment Period Ends: February 8, 2006, Contact: 
Janice L. Bell 1-866-576-8240.
EIS No. 20050512, Final EIS, NPS, DC, Rock Creek Park and the Rock 
Creek and Potomac Parkway Project, General Management Plan, 
Implementation, Washington, DC, Wait Period Ends: January 9, 2006,

[[Page 73234]]

Contact: Patrick Gregerson 202-619-7277.
EIS No. 20050513, Final EIS, AFS, AR, Ozark-St. Francis National 
Forests Proposed Revised Land and Resource Management Plan, 
Implementation, Several Counties, AR, Wait Period Ends: January 9, 
2006, Contact: Gary Knudsen 479-964-7200.
EIS No. 20050514, Final EIS, NIH, ME, National Emerging Infectious 
Laboratories, Selected the Preferred Alternative, Construction of 
National Biocontainment Laboratory, BioSquare Research Park, Boston 
University Medical Center Campus, Boston, MA, Wait Period Ends: January 
9, 2006, Contact: Valerie Nottingham 301-496-7775.

Amended Notices

EIS No. 20050469, Draft EIS, NOA, 00, Programmatic--Towards an 
Ecosystem Approach for the Western Pacific Region: From Species Based 
Fishery Management Plans to Place-Based Fishery Ecosystem Plans, 
Realignment, Implementation, Western Pacific Region (America Samoa, 
Guam, Hawaii, Commonwealth of the Northern Mariana Islands), and U.S. 
Pacific Remote Island Areas, Comment Period Ends: December 27, 2005, 
Contact: William L. Robinson 808-944-2200.

    Revision of FR Notice Published November 10, 2005: Correction to 
Comment Period from December 26, 2005 to December 27, 2005. Also, this 
document is available on the Internet at: https://swr.nmfs.noaa.gov/pir.

    Dated: December 6, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7120 Filed 12-8-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.