Environmental Impacts Statements; Notice of Availability, 73233-73234 [E5-7120]
Download as PDF
Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices
conformity, energy and water
conservation, and cumulative impacts
analysis. Rating EC2.
EIS No. 20050406, EDP No. D–FHW–
L40228–WA, South Park Bridge Project,
Proposes to Rehabilitate or Replace the
Historic South Park Ridge over the
Duwamish Waterway at 14th/16 Avenue
S, U.S. Coast Guard Permit and U.S.
Army COE Section 10 and 404 Permits,
King County, WA.
Summary: EPA expressed
environmental concerns about water
quality, hazardous waste, and
environmental justice impacts related to
the project, and requested additional
information in the final EIS. Rating EC1.
EIS No. 20050421, EDP No. D–HUD–
C85046–NY, Ashburton Avenue Master
Plan and Urban Renewal Plan/Mulford
Hope VI Revitalization Plan,
Development, Implementation, Yonkers
City, Westchester County, NY.
Summary: EPA expressed
environmental concerns about air
quality impacts and the need for a
General Conformity Determination.
Rating EC2.
EIS No. 20050445, EDP No. D–NPS–
J61108–SD, Badlands National Park/
North Unit General Management Plan,
Implementation, Jackson, Pennington
and Shannon Counties, SD.
Summary: EPA expressed
environmental concerns about potential
air quality, riparian and other water
resources, and wildlife habitat impacts,
and recommended further evaluation of
these impacts, including a discussion of
potential mitigation measures, be
included in the Final EIS. Rating EC2.
Final EISs
EIS No. 20050443, ERP No. F–FHW–
H40182–00, US–159 Missouri River
Crossing Project, Rehabilitation or
Replacement of the Missouri River
Bridge at Rulo, Funding and U.S. Army
COE Section 404 Permit, Richardson
County, NE and Holt County, MO.
Summary: EPA does not object to the
proposed project and appreciates the
additional coordination afforded to 4(f)
properties, as well as the inclusion of
Traffic System Management/Travel
Demand Management in combination
with the preferred alternative.
EIS No. 20050458, ERP No. F–AFS–
J65450–SD, Deerfield Project Area,
Proposes to Implement Multiple
Resource Management Actions, Mystic
Ranger District, Black Hills National
Forest, Pennington County, SD.
Summary: EPA remains concerned
about water quality impacts from
additional runoff and related erosion
and sediment losses. In addition, EPA
continues to express environmental
concerns about cumulative impacts to
VerDate Aug<31>2005
14:22 Dec 08, 2005
Jkt 208001
soils, water quality, aquatic resources,
and fish and wildlife habitats and
populations.
Dated: December 6, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7121 Filed 12–8–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6670–01]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed November 28, 2005 Through
December 2, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050501, Draft EIS, NRS, AR,
Walnut Bayou Irrigation Project,
Natural Resource Plan for the Little
Red River Watershed, Little River
County, AR, Comment Period Ends:
January 23, 2006, Contact: Kalven L.
Trice 501–301–3100.
EIS No. 20050502, Final EIS, AFS, MT,
Fishtrap Project, Proposed Timber
Harvest, Prescribed Burning, Road
Construction and Other Restoration
Activities, Lolo National Forest,
Plains/Thompson Falls Ranger
District, Sanders County, MT, Wait
Period Ends: January 9, 2006, Contact:
Randy Hojem 406–826–4308.
EIS No. 20050503, Draft EIS, GSA, WA,
Peace Arch Port of Entry
Redevelopment Project,
Improvements to Security, Safety and
Functionality, Canadian Border in
Blaine, Whatcom County, WA,
Comment Period Ends: January 23,
2006, Contact: Michael Levine 253–
931–7263.
EIS No. 20050504, Draft Supplement,
COE, MO, St. Johns Bayou and New
Madrid Floodway Project, Channel
Enlargement and Improvement,
Revised Information to Clarify and
Address Issues of Concern, Flood
Control National Economic
Development (NED), New Madrid,
Mississippi and Scott Counties, MO,
Comment Period Ends: January 23,
2006, Contact: Danny Ward 901–544–
0709.
EIS No. 20050505, Final EIS, AFS, 00,
Caribou Travel Plan Revision,
Determine the Motorized Road and
Trail System, Implementation,
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
73233
Caribou-Targhee National Forest,
Westside, Soda Spring and
Montpeller Ranger Districts, Bannock,
Bear River, Bonneville, Caribou,
Franklin, Oneida and Power Counties,
ID; Box Elder and Cache Counties, UT
and Lincoln County, WY, Wait Period
Ends: January 9, 2006, Contact: Deb
Tiller 208–557–5779.
EIS No. 20050506, Final EIS, NOA, 00,
Pacific Coast Groundfish Fishery
Management Plan, To Conserve and
Enhance Essential Fish Habitat (EFH)
Designation and Minimization of
Advise Impacts, Coast Exclusive
Economic Zone, WA, OR and CA,
Wait Period Ends: January 9, 2006,
Contact: Dr. Robert Lohn 206–526–
6150.
EIS No. 20050507, Draft EIS, BLM, NV,
Sheep Complex, Big Springs and
Owyhee Grazing Allotments Sensitive
Bird Species Project, Determine
Impacts of Livestock Grazing, Elko
County, NV, Comment Period Ends:
January 23, 2006, Contact: Lorrie West
775–753–0200.
EIS No. 20050508, Final EIS, NPS, IN,
Lincoln Boyhood National Memorial
General Management Plan,
Implementation, Lincoln City Spencer
County, IN, Wait Period Ends: January
9, 2006, Contact: Nick Chevance 402–
661–1844.
EIS No. 20050509, Final Supplement,
COE, FL, Central and Southern
Florida Project, Tamiami Trail
Modifications, Modified Water
Deliveries to Everglades National
Park, Authorized Flow of Water from
WCA–38 and the L–29 Canal North of
the Tamiami Trail, Dade County, FL,
Wait Period Ends: January 9, 2006,
Contact: Dr. Jonathan Moulding 904–
232–2286.
EIS No. 20050510, Draft EIS, FHW, 00,
I–81 Corridor Improvement Study in
Virginia , Transportation
Improvements from the Tennessee
Border to the West Virginia Border,
(Tier 1), Several Counties, VA and
WV, Comment Period Ends: February
17, 2006, Contact: John Simkins 804–
775–3342.
EIS No. 20050511, Draft EIS, DOE, PA,
Gilberton Coal-to-Clean Fuels and
Power Project, Construction and
Operation a New Demonstration
Plant, Schuylkill County, PA,
Comment Period Ends: February 8,
2006, Contact: Janice L. Bell 1–866–
576–8240.
EIS No. 20050512, Final EIS, NPS, DC,
Rock Creek Park and the Rock Creek
and Potomac Parkway Project,
General Management Plan,
Implementation, Washington, DC,
Wait Period Ends: January 9, 2006,
E:\FR\FM\09DEN1.SGM
09DEN1
73234
Federal Register / Vol. 70, No. 236 / Friday, December 9, 2005 / Notices
Contact: Patrick Gregerson 202–619–
7277.
EIS No. 20050513, Final EIS, AFS, AR,
Ozark-St. Francis National Forests
Proposed Revised Land and Resource
Management Plan, Implementation,
Several Counties, AR, Wait Period
Ends: January 9, 2006, Contact: Gary
Knudsen 479–964–7200.
EIS No. 20050514, Final EIS, NIH, ME,
National Emerging Infectious
Laboratories, Selected the Preferred
Alternative, Construction of National
Biocontainment Laboratory,
BioSquare Research Park, Boston
University Medical Center Campus,
Boston, MA, Wait Period Ends:
January 9, 2006, Contact: Valerie
Nottingham 301–496–7775.
Amended Notices
EIS No. 20050469, Draft EIS, NOA, 00,
Programmatic—Towards an
Ecosystem Approach for the Western
Pacific Region: From Species Based
Fishery Management Plans to PlaceBased Fishery Ecosystem Plans,
Realignment, Implementation,
Western Pacific Region (America
Samoa, Guam, Hawaii,
Commonwealth of the Northern
Mariana Islands), and U.S. Pacific
Remote Island Areas, Comment
Period Ends: December 27, 2005,
Contact: William L. Robinson 808–
944–2200.
Revision of FR Notice Published
November 10, 2005: Correction to
Comment Period from December 26,
2005 to December 27, 2005. Also, this
document is available on the Internet at:
https://swr.nmfs.noaa.gov/pir.
Dated: December 6, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E5–7120 Filed 12–8–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2005–0318; FRL–7748–5]
Notice of Filing of a Pesticide Petition
Amendment to Regulations for
Residues of the Biochemical Pesticide
2,6–diisopropylnaphthalene (2,6–DIPN)
in or on Potatoes
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This notice announces the
initial filing of a pesticide petition
proposing the amendment of regulations
for residues of the biochemical pesticide
VerDate Aug<31>2005
14:22 Dec 08, 2005
Jkt 208001
2,6–diisopropylnaphthalene (2,6–DIPN)
in or on the food commodities whole
potatoes at 2 parts per million (ppm)
and potato peels at 6 ppm.
DATES: Comments must be received on
or before January 9, 2006.
ADDRESSES: Comments, identified by
docket identification (ID) number EPA–
HQ–OPP–2005–0318 and pesticide
petition (PP) number 1F6338, may be
submitted electronically, by mail, or
through hand delivery or courier.
Follow the detailed instructions as
provided in Unit I. of the
SUPPLEMENTARY INFORMATION.
FOR FURTHER INFORMATION CONTACT:
Denise Greenway, Biopesticides and
Pollution Prevention Division, (7511C),
Office of Pesticide Programs, U. S.
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001, telephone number:
(703) 308–8263, e-mail address:
greenway.denise@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Does this Action Apply to Me?
You may be potentially affected by
this action if you are an agricultural
producer, food manufacturer, or
pesticide manufacturer. Potentially
affected entities may include, but are
not limited to:
• Crop production (NAICS code 111).
• Animal production (NAICS code
112).
• Food manufacturing (NAICS code
311).
• Pesticide manufacturing (NAICS
code 32532).
This listing is not intended to be
exhaustive, but rather provides a guide
for readers regarding entities likely to be
affected by this action. Other types of
entities not listed in this unit could also
be affected. The North American
Industrial Classification System
(NAICS) codes have been provided to
assist you and others in determining
whether this action might apply to
certain entities. If you have any
questions regarding the applicability of
this action to a particular entity, consult
the person listed under FOR FURTHER
INFORMATION CONTACT.
B. How Can I Get Copies of this
Document and Other Related
Information?
1. Docket. EPA has established an
official public docket for this action
under docket ID number EPA–HQ–
OPP–2005–0318. The official public
docket consists of the documents
specifically referenced in this action,
any public comments received, and
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
other information related to this action.
Although a part of the official docket,
the public docket does not include
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. The official public
docket is the collection of materials that
is available for public viewing at the
Public Information and Records
Integrity Branch (PIRIB), Rm. 119,
Crystal Mall #2, 1801 S. Bell St.,
Arlington, VA. This docket facility is
open from 8:30 a.m. to 4 p.m., Monday
through Friday, excluding legal
holidays. The docket telephone number
is (703) 305–5805.
2. Electronic access.You may access
this document electronically through
the EPA Internet under the ‘‘Federal
Register’’ listings at https://
www.epa.gov/fedrgstr/.
Agency Website: EDOCKET, EPA’s
electronic public docket and comment
system was replaced on November 25,
2005, by an enhanced federal-wide
electronic docket management and
comment system located at https://
www.regulations.gov/. Follow the online instructions.
An electronic version of the public
docket is available through EPA’s
electronic public docket and comment
system, EPA Dockets. You may use EPA
Dockets at https://www.epa.gov/edocket/
to submit or view public comments, to
access the index listing of the contents
of the official public docket, and to
access those documents in the public
docket that are available electronically.
Although not all docket materials may
be available electronically, you may still
access any of the publicly available
docket materials through the docket
facility identified in Unit I.B.1. Once in
the system, select ‘‘search,’’ then key in
the appropriate docket ID number.
Certain types of information will not
be placed in the EPA Dockets.
Information claimed as CBI and other
information whose disclosure is
restricted by statute, which is not
included in the official public docket,
will not be available for public viewing
in EPA’s electronic public docket. EPA’s
policy is that copyrighted material will
not be placed in EPA’s electronic public
docket but will be available only in
printed, paper form in the official public
docket. To the extent feasible, publicly
available docket materials will be made
available in EPA’s electronic public
docket. When a document is selected
from the index list in EPA Dockets, the
system will identify whether the
document is available for viewing in
EPA’s electronic public docket.
Although not all docket materials may
be available electronically, you may still
access any of the publicly available
E:\FR\FM\09DEN1.SGM
09DEN1
Agencies
[Federal Register Volume 70, Number 236 (Friday, December 9, 2005)]
[Notices]
[Pages 73233-73234]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-7120]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6670-01]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed November 28, 2005 Through December 2, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050501, Draft EIS, NRS, AR, Walnut Bayou Irrigation Project,
Natural Resource Plan for the Little Red River Watershed, Little River
County, AR, Comment Period Ends: January 23, 2006, Contact: Kalven L.
Trice 501-301-3100.
EIS No. 20050502, Final EIS, AFS, MT, Fishtrap Project, Proposed Timber
Harvest, Prescribed Burning, Road Construction and Other Restoration
Activities, Lolo National Forest, Plains/Thompson Falls Ranger
District, Sanders County, MT, Wait Period Ends: January 9, 2006,
Contact: Randy Hojem 406-826-4308.
EIS No. 20050503, Draft EIS, GSA, WA, Peace Arch Port of Entry
Redevelopment Project, Improvements to Security, Safety and
Functionality, Canadian Border in Blaine, Whatcom County, WA, Comment
Period Ends: January 23, 2006, Contact: Michael Levine 253-931-7263.
EIS No. 20050504, Draft Supplement, COE, MO, St. Johns Bayou and New
Madrid Floodway Project, Channel Enlargement and Improvement, Revised
Information to Clarify and Address Issues of Concern, Flood Control
National Economic Development (NED), New Madrid, Mississippi and Scott
Counties, MO, Comment Period Ends: January 23, 2006, Contact: Danny
Ward 901-544-0709.
EIS No. 20050505, Final EIS, AFS, 00, Caribou Travel Plan Revision,
Determine the Motorized Road and Trail System, Implementation, Caribou-
Targhee National Forest, Westside, Soda Spring and Montpeller Ranger
Districts, Bannock, Bear River, Bonneville, Caribou, Franklin, Oneida
and Power Counties, ID; Box Elder and Cache Counties, UT and Lincoln
County, WY, Wait Period Ends: January 9, 2006, Contact: Deb Tiller 208-
557-5779.
EIS No. 20050506, Final EIS, NOA, 00, Pacific Coast Groundfish Fishery
Management Plan, To Conserve and Enhance Essential Fish Habitat (EFH)
Designation and Minimization of Advise Impacts, Coast Exclusive
Economic Zone, WA, OR and CA, Wait Period Ends: January 9, 2006,
Contact: Dr. Robert Lohn 206-526-6150.
EIS No. 20050507, Draft EIS, BLM, NV, Sheep Complex, Big Springs and
Owyhee Grazing Allotments Sensitive Bird Species Project, Determine
Impacts of Livestock Grazing, Elko County, NV, Comment Period Ends:
January 23, 2006, Contact: Lorrie West 775-753-0200.
EIS No. 20050508, Final EIS, NPS, IN, Lincoln Boyhood National Memorial
General Management Plan, Implementation, Lincoln City Spencer County,
IN, Wait Period Ends: January 9, 2006, Contact: Nick Chevance 402-661-
1844.
EIS No. 20050509, Final Supplement, COE, FL, Central and Southern
Florida Project, Tamiami Trail Modifications, Modified Water Deliveries
to Everglades National Park, Authorized Flow of Water from WCA-38 and
the L-29 Canal North of the Tamiami Trail, Dade County, FL, Wait Period
Ends: January 9, 2006, Contact: Dr. Jonathan Moulding 904-232-2286.
EIS No. 20050510, Draft EIS, FHW, 00, I-81 Corridor Improvement Study
in Virginia , Transportation Improvements from the Tennessee Border to
the West Virginia Border, (Tier 1), Several Counties, VA and WV,
Comment Period Ends: February 17, 2006, Contact: John Simkins 804-775-
3342.
EIS No. 20050511, Draft EIS, DOE, PA, Gilberton Coal-to-Clean Fuels and
Power Project, Construction and Operation a New Demonstration Plant,
Schuylkill County, PA, Comment Period Ends: February 8, 2006, Contact:
Janice L. Bell 1-866-576-8240.
EIS No. 20050512, Final EIS, NPS, DC, Rock Creek Park and the Rock
Creek and Potomac Parkway Project, General Management Plan,
Implementation, Washington, DC, Wait Period Ends: January 9, 2006,
[[Page 73234]]
Contact: Patrick Gregerson 202-619-7277.
EIS No. 20050513, Final EIS, AFS, AR, Ozark-St. Francis National
Forests Proposed Revised Land and Resource Management Plan,
Implementation, Several Counties, AR, Wait Period Ends: January 9,
2006, Contact: Gary Knudsen 479-964-7200.
EIS No. 20050514, Final EIS, NIH, ME, National Emerging Infectious
Laboratories, Selected the Preferred Alternative, Construction of
National Biocontainment Laboratory, BioSquare Research Park, Boston
University Medical Center Campus, Boston, MA, Wait Period Ends: January
9, 2006, Contact: Valerie Nottingham 301-496-7775.
Amended Notices
EIS No. 20050469, Draft EIS, NOA, 00, Programmatic--Towards an
Ecosystem Approach for the Western Pacific Region: From Species Based
Fishery Management Plans to Place-Based Fishery Ecosystem Plans,
Realignment, Implementation, Western Pacific Region (America Samoa,
Guam, Hawaii, Commonwealth of the Northern Mariana Islands), and U.S.
Pacific Remote Island Areas, Comment Period Ends: December 27, 2005,
Contact: William L. Robinson 808-944-2200.
Revision of FR Notice Published November 10, 2005: Correction to
Comment Period from December 26, 2005 to December 27, 2005. Also, this
document is available on the Internet at: https://swr.nmfs.noaa.gov/pir.
Dated: December 6, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7120 Filed 12-8-05; 8:45 am]
BILLING CODE 6560-50-P