Colorado Interstate Gas Company; Notice of Compliance Filing, 72804-72805 [E5-6945]
Download as PDF
72804
Federal Register / Vol. 70, No. 234 / Wednesday, December 7, 2005 / Notices
issuances of securities or assumptions of
liability by Wisconsin River should file
a motion to intervene or protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is April 25, 2005.
Absent a request to be heard in
opposition by the deadline above,
Wisconsin River is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Wisconsin River,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of Wisconsin River’s issuances
of securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426. The Order may
also be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number filed to access the
document. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6937 Filed 12–6–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Tariff, Second Revised Volume No. 1, a
work paper supporting the continuation,
effective January 1, 2006, of its currently
effective Fuel and Line Loss Allowance
of 0.0%.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time
December 6, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6949 Filed 12–6–05; 8:45 am]
Federal Energy Regulatory
Commission
[Docket No. RP06–107–000]
BILLING CODE 6717–01–P
Chandeleur Pipe Line Company;
Notice of Filing
November 29, 2005.
Take notice that on November 22,
2005, Chandeleur Pipe Line Company
(Chandeleur) tendered for filing Gas
VerDate Aug<31>2005
13:01 Dec 06, 2005
Jkt 208001
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–618–001]
Colorado Interstate Gas Company;
Notice of Compliance Filing
November 29, 2005.
Take notice that on November 23,
2005, Colorado Interstate Gas Company
(CIG) tendered for filing as part of its
FERC Gas Tariff, Pro Forma First
Revised Volume No.1, the following
tariff sheets:
First Revised Sheet No. 380F.
First Revised Sheet No. 380G.
First Revised Sheet No. 380H.
Original Sheet No. 380H.01.
Original Sheet No. 380H.02.
Original Sheet No. 380H.03.
Original Sheet No. 380H.04.
CIG states that the pro forma tariff
sheets are being filed to comply with the
Commission’s Order dated September
30, 2005 in Docket No. RP05–618–000.
CIG states that these pro forma tariff
sheets are submitted to establish a trueup feature in its Fuel and L&U
reimbursement mechanism.
CIG states that copies of its filing have
been sent to all firm customers,
interruptible customers, and affected
state commissions.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
E:\FR\FM\07DEN1.SGM
07DEN1
Federal Register / Vol. 70, No. 234 / Wednesday, December 7, 2005 / Notices
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6945 Filed 12–6–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP98–151–003]
Columbia Gas Transmission
Corporation; Notice of Petition to
Amend
November 30, 2005.
Take notice that on August 1, 2005,
Columbia Gas Transmission Corporation
(Columbia), 1700 MacCorkle Avenue,
SE., Charleston, West Virginia 25314,
filed in Docket No. CP98–151–003, a
petition to amend the authorization
previously issued by the Commission as
it relates to the facilities approved for
abandonment, the method of
abandonment, and the leasing of
capacity from Millennium Pipeline
Company, L.P. In addition, Columbia
requests approval of an interim
operating agreement. In addition,
Columbia requests approval of a
limited-term certificate of public
convenience and necessity with pregranted abandonment authorizing
Columbia to operate certain facilities
that Millennium has requested authority
to construct, pending the in-service date
of Millennium.
This petition is on file with the
Commission and open to public
inspection. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any initial questions regarding this
petition should be directed to counsel
for Columbia, Fredric J. George,
Columbia Gas Transmission
Corporation, P.O. Box 1273, Charleston,
West Virginia 25325–1273; at (304) 357–
2359 (phone) or (304) 357–3206 (fax).
There are two ways to become
involved in the Commission’s review of
VerDate Aug<31>2005
13:01 Dec 06, 2005
Jkt 208001
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date,
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Persons who wish to comment only
on the environmental review of this
project, or in support of or in opposition
to this project, should submit an
original and two copies of their
comments to the Secretary of the
Commission. Environmental
commenters will be placed on the
Commission’s environmental mailing
list, will receive copies of the
environmental documents, and will be
notified of meetings associated with the
Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
The Commission’s rules require that
persons filing comments in opposition
to the project provide copies of their
protests only to the applicant. However,
the non-party commenters will not
receive copies of all documents filed by
other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: January 17, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6955 Filed 12–6–05; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
72805
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commssion
[Docket Nos. ES06–7–000, ES06–8–000]
Consolidated Edison Company of New
York, Inc.; Orange and Rockland
Utilities, Inc.; Notice of Application
November 25, 2005.
Take notice that on November 21,
2005, Consolidated Edison Company of
New York, Inc. (Consolidated Edison)
and Orange and Rockland Utilities, Inc.
(Orange and Rockland) submitted
applications pursuant to Section 204 of
the Federal Power Act. Consolidated
Edison is seeking authorization to issue
short-term debt in an amount not to
exceed $1.5 billion outstanding at any
one time. Orange and Rockland is
seeking authorization to issue shortterm debt in an amount not to exceed
$200 million.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\07DEN1.SGM
07DEN1
Agencies
[Federal Register Volume 70, Number 234 (Wednesday, December 7, 2005)]
[Notices]
[Pages 72804-72805]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6945]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-618-001]
Colorado Interstate Gas Company; Notice of Compliance Filing
November 29, 2005.
Take notice that on November 23, 2005, Colorado Interstate Gas
Company (CIG) tendered for filing as part of its FERC Gas Tariff, Pro
Forma First Revised Volume No.1, the following tariff sheets:
First Revised Sheet No. 380F.
First Revised Sheet No. 380G.
First Revised Sheet No. 380H.
Original Sheet No. 380H.01.
Original Sheet No. 380H.02.
Original Sheet No. 380H.03.
Original Sheet No. 380H.04.
CIG states that the pro forma tariff sheets are being filed to
comply with the Commission's Order dated September 30, 2005 in Docket
No. RP05-618-000. CIG states that these pro forma tariff sheets are
submitted to establish a true-up feature in its Fuel and L&U
reimbursement mechanism.
CIG states that copies of its filing have been sent to all firm
customers, interruptible customers, and affected state commissions.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed in accordance with the provisions of section 154.210 of
the Commission's regulations (18 CFR 154.210). Anyone filing a protest
must serve a copy of that document on all the parties to the
proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed
[[Page 72805]]
docket(s). For assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-6945 Filed 12-6-05; 8:45 am]
BILLING CODE 6717-01-P