Download as PDF 71122 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices pursuant to section 205 of the Federal Power Act. Filed Date: November 7, 2005. Accession Number: 20051109–0174. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER06–173–000. Applicants: Entergy Services, Inc. Description: Entergy Services, Inc. as agent on behalf of Entergy Operating Companies submits an amendment to its OATT, consisting of First Revised Sheet No. 54 et al. to FERC Electric Tariff, Second Revised Volume No. 3. Filed Date: November 7, 2005. Accession Number: 20051109–0245. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER06–174–000. Applicants: Mid-Continent Area Power Pool. Description: Mid-Continent Area Power Pool et al. submits Second Rev. Sheet No. 137 reflecting that their Schedule F is modified to adopt North American Electric Reliability Council’s most recent version of its TLR Procedures. Filed Date: November 7, 2005. Accession Number: 20051109–0246. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER06–175–000. Applicants: Sierra Pacific Power Company. Description: Sierra Pacific Power Co. submits revisions to Exhibit F of the General Transfer Agreement with Bonneville Power Administration. Filed Date: November 7, 2005. Accession Number: 20051109–0247. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER06–176–000. Applicants: PSEG Waterford Energy LLC. Description: PSEG Waterford Energy LLC submits notice of cancellation of market-based authority under Applicant’s FERC Electric Tariff, Original Volume No. 1. Filed Date: November 7, 2005. Accession Number: 20051109–0248. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER06–177–000. Applicants: Econnergy Energy Company, Inc. Description: Econnergy Energy Co., Inc. requests cancellation of Market Based Rate Authority. Filed Date: November 7, 2005. Accession Number: 20051109–0236. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER94–142–029; ER05–570–004; ER98–3774–004; ER03– 717–003; ER00–2603–004. VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 Applicants: Tractebel Energy Marketing, Inc.; Hot Spring Power Company, LP; Choctaw Generation Limited Partnership; Chehalis Power Generation Ltd; Trigen-Syracuse Energy Corporation. Description: Tractebel Energy Marketing Inc. et al. submits a triennial market power update and revisions to market-based rate tariffs. Filed Date: November 7, 2005. Accession Number: 20051110–0103. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER95–1787–018. Applicants: Texaco Natural Gas, Inc. Description: Texaco Natural Gas, Inc. submits a compliance filing to correct a typographical error in its market behavior rules in FERC’s November 3, 2005 Order. Filed Date: November 7, 2005. Accession Number: 20051114–0010. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER96–2830–007. Applicants: Washington Gas Energy Services, Inc. Description: Washington Gas Energy Services, Inc. submits a compliance filing to correct a typographical error in its market behavior rules in FERC’s November 3, 2005 Order. Filed Date: November 7, 2005. Accession Number: 20051114–0013. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER99–3077–002. Applicants: Colorado Power Partners. Description: Colorado Power Partners submits an amendment to the Triennial Updated Market Power Analysis and a request for shortened notice period. Filed Date: November 10, 2005. Accession Number: 20051115–0033. Comment Date: 5 p.m. Eastern Time on Monday, November 21, 2005. Docket Numbers: ER99–3197–002. Applicants: BIV Generation Company, LLC. Description: BIV Generation Co., LLC submits an amendment to the Triennial Updated Market Power Analysis and a request for shortened notice period. Filed Date: November 10, 2005. Accession Number: 20051115–0032. Comment Date: 5 p.m. Eastern Time on Monday, November 21, 2005. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern Time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–6472 Filed 11–23–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 November 17, 2005. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER05–1221–002. Applicants: Commonwealth Edison Company. E:\FR\FM\25NON1.SGM 25NON1 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices Description: Commonwealth Edison Co’s Transmission Interconnection Agreement with ComEd, Ameren Services Co, MidWest ISO and PJM and request that FERC defer for consideration ComEd’s 7/15/05 filing pending refiling of the service agreement. Filed Date: 11/08/2005. Accession Number: 20051114–0009. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER05–524–001. Applicants: Xcel Energy Services. Description: Xcel Energy Services, on behalf of, Northern States Power Co submits the Refund Report required by FERC’s 11/4/05 Order which accepted an executed Generation Interconnection Agreement with Dan Mar Transmission, LLC. Filed Date: 11/09/2005. Accession Number: 20051114–0001. Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005. Docket Numbers: ER05–751–000. Applicants: American Electric Power Service Company. Description: American Electric Power on behalf of the American Electric Power System submits a Settlement Agreement. Filed Date: 11/08/2005. Accession Number: 20051109–0238. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER06–178–000. Applicants: Exelon Corporation. Description: Exelon Corp submits a notice of cancellation, as Attachment A, regarding the cancellation of Unicom Power Marketing, Inc’s FERC Electric Rate Schedule No. 1. Filed Date: 11/08/2005. Accession Number: 20051109–0249. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER06–179–000. Applicants: MEP Investments, LLC. Description: Aquila Merchant Services, LLC on behalf of MEP Investment, submits a notice of cancellation of its FERC Electric Rate Schedule Volume No. 1. Filed Date: 11/08/2005. Accession Number: 20051110–0070. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER06–180–000. Applicants: MEP Pleasant Hill Operating, LLC. Description: Aquila Merchange Services, LLC on behalf of MEP Pleasant Hill Operating, LLC submits a Notice of Cancellation of its FERC Electric Tariff, Original Volume No. 1. Filed Date: 11/08/2005. Accession Number: 20051110–0069. VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER06–181–000. Applicants: Pleasant Hill Marketing, LLC. Description: Aquila Merchange Services, LLC on behalf of Pleasant Hill Marketing, LLC submits a Notice of Cancellation of its FERC Electric Rate Schedule Volume No. 1. Filed Date: 11/08/2005. Accession Number: 20051110–0068. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER06–182–000. Applicants: MidAmerican Energy Company. Description: MidAmerican Energy Co submits an amended Electric Transmission Interconnection Agreement with Corn Belt Power Cooperative dated 10/31/05 pursuant to section 205 of the Federal Power Act. Filed Date: 11/09/2005. Accession Number: 20051110–0120. Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005. Docket Numbers: ER06–183–000. Applicants: South Carolina Electric & Gas Company. Description: South Carolina Electric & Gas Corp submits Second Revised Sheet No. 8 et al to FERC Electric Tariff, Second Revised Volume No. 5 in compliance with FERC’s 10/7/05 Order. Filed Date: 11/08/2005. Accession Number: 20051110–0123. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Docket Numbers: ER06–184–000. Applicants: Midwest Independent System Operator. Description: Midwest Independent Transmission System Operator, Inc & American Transmission Co, LLC et al submit a notice of cancellation for the Stratford Water & Electric Utility Service Agreement. Filed Date: 11/09/2005. Accession Number: 20051114–0005. Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005. Docket Numbers: ER06–189–000. Applicants: Electric Energy, Inc. Description: Electric Energy, Inc submits a Letter Supplement to its 9/2/ 87 Power Supply Agreement with Union Electric Co, Ameren Energy Resources Co, and Kentucky Utilities Co. Filed Date: 11/09/2005. Accession Number: 20051114–0082. Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005. Docket Numbers: ER06–190–000. Applicants: Electric Energy, Inc. Description: Electric Energy, Inc submits Modification No. 16 to its 9/2/ PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 71123 87 Power Contract with the Unites States Department of Energy. Filed Date: 11/09/2005. Accession Number: 20051114–0083. Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005. Docket Numbers: ER99–230–010; ER03–762–011. Applicants: Alliant Energy Corporate Services, Inc. Description: Alliant Energy Corporate Services, Inc. on behalf of its Alliant Energy Operating Companies in compliance 9/19/05 Order submitted a refund report. Filed Date: 11/08/2005. Accession Number: 20051108–5007. Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an E:\FR\FM\25NON1.SGM 25NON1 71124 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502-8659. Magalie R. Salas, Secretary. [FR Doc. E5–6473 Filed 11–23–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Friday, November 18, 2005. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER05–1325–001; ER05–1319–001; ER05–1324–001. Applicants: Southern California Edison Company; Pacific Gas & Electric Company; San Diego Gas & Electric Company. Description: Southern California Edison Co. submits a compliance filing for the wholesale distribution access tariff small generation interconnection procedures & small generation interconnection agreement. Filed Date: 11/10/2005. Accession Number: 20051117–0081. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER05–1491–001. Applicants: Vermont Yankee Nuclear Power Corporation. Description: Vermont Yankee Nuclear Power Corp submits an amendment to its 9/19/05 filing of a market-based sales tariff, designated as FERC Electric Tariff, Original Volume No. 1. Filed Date: 11/10/2005. Accession Number: 20051116–0187. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER05–1497–001. Applicants: Dearborn Industrial Generation, L.L.C. Description: Dearborn Industrial Generation, L.L.C’s submits revised FERC Electric Tariff Volume No. 1, First Revised Sheet No. 18. Filed Date: 11/02/2005. Accession Number: 20051102–5049. Comment Date: 5 p.m. Eastern Time on Monday, November 28, 2005. Docket Numbers: ER06–9–001. Applicants: FPL Energy Burleigh County Wind, LLC. VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 Description: FPL Energy Burleigh County Wind, LLC’s response to FERC Staff. Filed Date: 11/10/2005. Accession Number: 20051116–0188. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–187–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission Operator, Inc submits a Large Generation Interconnection Agreement among Valley View Transmission, LLC, the Midwest ISO, and Great River Energy. Filed Date: 11/10/2005. Accession Number: 20051114–0081. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–188–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits a revised Network Integration Service Agreement with the City of Eaton Rapids, MI. Filed Date: 11/10/2005. Accession Number: 20051114–0086. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–191–000. Applicants: ISO New England Inc. Description: ISO New England Inc et al. jointly submits its Order 2006 compliance filing for New England’s Standardization of Small Generator Interconnection Agreements & Procedures. Filed Date: 11/10/2005. Accession Number: 20051115–0034. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–192–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits proposed revisions to their Open Access Transmission and Energy Markets Tariff, FERC Electric Tariff, Third Revised Volume No. 1. Filed Date: 11/10/2005. Accession Number: 20051115–0103. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–193–000. Applicants: ISO New England Inc. Description: ISO New England Inc. et al. submits transmittal letter and proposed improvements to Schedule 22 of the ISO OATT pursuant to section 205 of the Federal Power Act and Part 35 of FERC’s Regulations. Filed Date: 11/10/2005. Accession Number: 20051115–0008. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 Docket Numbers: ER06–194–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits an unexecuted Large Generator Interconnection Agreement among Wisconsin Electric Co. et al. Filed Date: 11/10/2005. Accession Number: 20051115–0004. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–195–000. Applicants: K Road BG Management LLC. Description: K Road BG Management, LLC’s request Commission approval of the market-based rate authorization and request for certain waivers and blanket authorization. Filed Date: 11/10/2005. Accession Number: 20051115–0005. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–196–000. Applicants: Cantor Fitzgerald Brokerage, L.P. Description: Cantor Fitzgerald Brokerage, LP submits its proposed market-based rate schedule FERC Electric Rate Schedule No. 1. Filed Date: 11/10/2005. Accession Number: 20051115–0006. Comment Date: 5 p.m. Eastern Time on Thursday, December 01, 2005. Docket Numbers: ER06–197–000. Applicants: Cabrillo Power I LLC. Description: Cabrillo Power I LLC et al. submit revisions to the Reliability Must-Run Service Agreements with the California Independent System Operator Corp. Filed Date: 11/10/2005. Accession Number: 20051115–0009. Comment Date: 5 p.m. Eastern Time on Thursday, December 1, 2005. Docket Numbers: ER06–198–000. Applicants: Virginia Electric and Power Company. Description: Virginia Electric & Power Co. dba Dominion Virginia Power submits a revised unexecuted Mutual Operating Agreement, First Revised Service Agreement No. 1301 with North Carolina Electric Membership Corp. Filed Date: 11/10/2005. Accession Number: 20051115–0001. Comment Date: 5 p.m. Eastern Time on Thursday, December 1, 2005. Docket Numbers: ER06–199–000. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection LLC submits revisions to the PJM Open Access Transmission Tariff to comply with FERC’s Final Rule in RM02–12– 000. Filed Date: 11/10/2005. E:\FR\FM\25NON1.SGM 25NON1

Agencies

[Federal Register Volume 70, Number 226 (Friday, November 25, 2005)]
[Notices]
[Pages 71122-71124]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6473]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

November 17, 2005.
    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER05-1221-002.
    Applicants: Commonwealth Edison Company.

[[Page 71123]]

    Description: Commonwealth Edison Co's Transmission Interconnection 
Agreement with ComEd, Ameren Services Co, MidWest ISO and PJM and 
request that FERC defer for consideration ComEd's 7/15/05 filing 
pending refiling of the service agreement.
    Filed Date: 11/08/2005.
    Accession Number: 20051114-0009.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER05-524-001.
    Applicants: Xcel Energy Services.
    Description: Xcel Energy Services, on behalf of, Northern States 
Power Co submits the Refund Report required by FERC's 11/4/05 Order 
which accepted an executed Generation Interconnection Agreement with 
Dan Mar Transmission, LLC.
    Filed Date: 11/09/2005.
    Accession Number: 20051114-0001.
    Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005.

    Docket Numbers: ER05-751-000.
    Applicants: American Electric Power Service Company.
    Description: American Electric Power on behalf of the American 
Electric Power System submits a Settlement Agreement.
    Filed Date: 11/08/2005.
    Accession Number: 20051109-0238.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER06-178-000.
    Applicants: Exelon Corporation.
    Description: Exelon Corp submits a notice of cancellation, as 
Attachment A, regarding the cancellation of Unicom Power Marketing, 
Inc's FERC Electric Rate Schedule No. 1.
    Filed Date: 11/08/2005.
    Accession Number: 20051109-0249.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER06-179-000.
    Applicants: MEP Investments, LLC.
    Description: Aquila Merchant Services, LLC on behalf of MEP 
Investment, submits a notice of cancellation of its FERC Electric Rate 
Schedule Volume No. 1.
    Filed Date: 11/08/2005.
    Accession Number: 20051110-0070.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER06-180-000.
    Applicants: MEP Pleasant Hill Operating, LLC.
    Description: Aquila Merchange Services, LLC on behalf of MEP 
Pleasant Hill Operating, LLC submits a Notice of Cancellation of its 
FERC Electric Tariff, Original Volume No. 1.
    Filed Date: 11/08/2005.
    Accession Number: 20051110-0069.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER06-181-000.
    Applicants: Pleasant Hill Marketing, LLC.
    Description: Aquila Merchange Services, LLC on behalf of Pleasant 
Hill Marketing, LLC submits a Notice of Cancellation of its FERC 
Electric Rate Schedule Volume No. 1.
    Filed Date: 11/08/2005.
    Accession Number: 20051110-0068.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER06-182-000.
    Applicants: MidAmerican Energy Company.
    Description: MidAmerican Energy Co submits an amended Electric 
Transmission Interconnection Agreement with Corn Belt Power Cooperative 
dated 10/31/05 pursuant to section 205 of the Federal Power Act.
    Filed Date: 11/09/2005.
    Accession Number: 20051110-0120.
    Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005.

    Docket Numbers: ER06-183-000.
    Applicants: South Carolina Electric & Gas Company.
    Description: South Carolina Electric & Gas Corp submits Second 
Revised Sheet No. 8 et al to FERC Electric Tariff, Second Revised 
Volume No. 5 in compliance with FERC's 10/7/05 Order.
    Filed Date: 11/08/2005.
    Accession Number: 20051110-0123.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Docket Numbers: ER06-184-000.
    Applicants: Midwest Independent System Operator.
    Description: Midwest Independent Transmission System Operator, Inc 
& American Transmission Co, LLC et al submit a notice of cancellation 
for the Stratford Water & Electric Utility Service Agreement.
    Filed Date: 11/09/2005.
    Accession Number: 20051114-0005.
    Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005.

    Docket Numbers: ER06-189-000.
    Applicants: Electric Energy, Inc.
    Description: Electric Energy, Inc submits a Letter Supplement to 
its 9/2/87 Power Supply Agreement with Union Electric Co, Ameren Energy 
Resources Co, and Kentucky Utilities Co.
    Filed Date: 11/09/2005.
    Accession Number: 20051114-0082.
    Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005.

    Docket Numbers: ER06-190-000.
    Applicants: Electric Energy, Inc.
    Description: Electric Energy, Inc submits Modification No. 16 to 
its 9/2/87 Power Contract with the Unites States Department of Energy.
    Filed Date: 11/09/2005.
    Accession Number: 20051114-0083.
    Comment Date: 5 p.m. Eastern Time on Wednesday, November 30, 2005.

    Docket Numbers: ER99-230-010; ER03-762-011.
    Applicants: Alliant Energy Corporate Services, Inc.
    Description: Alliant Energy Corporate Services, Inc. on behalf of 
its Alliant Energy Operating Companies in compliance 9/19/05 Order 
submitted a refund report.
    Filed Date: 11/08/2005.
    Accession Number: 20051108-5007.
    Comment Date: 5 p.m. Eastern Time on Tuesday, November 29, 2005.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an

[[Page 71124]]

eSubscription link on the Web site that enables subscribers to receive 
e-mail notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY, 
call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-6473 Filed 11-23-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.