Environmental Impacts Statements; Notice of Availability, 69967-69968 [05-22888]

Download as PDF Federal Register / Vol. 70, No. 222 / Friday, November 18, 2005 / Notices Permits, Providence County, RI and New England. Summary: EPA expressed environmental concerns about the potential need for additional air emission control measures on marine vessels, additional mitigation measures to address impacts from entrainment of fish, eggs, and larvae by ship ballast water intakes, and requested an opportunity for additional discussions about potential environmental justice impacts. EIS No. 20050320, ERP No. F–AFS– J65426–UT, Wasatch Plateau Grazing Project, Proposal to Continue to Authorize Sheep Grazing by Issuance of a Term Grazing Permits on 31 Sheep Allotments, Manti-La Sal National Forest, Sanpete, Ferron and Price Ranger Districts, Sanpete, Carbon, Utah and Emery County, UT. Summary: The FEIS addressed EPA’s concerns with impact to water quality. EIS No. 20050408, ERP No. F–FHW– F40432–WI, U.S. 41 Highway Corridor Project, Transportation Improvement between the Cities of Oconto and Perhtigo, Funding, Marinette and Oconto Counties, WI. Summary: While EPA has no objection to the proposed action, it asked to be involved in planning the wetland restoration of the more than 300 acres required for compensatory mitigation. EIS No. 20050449, ERP No. F–USN– E11054–FL, Navy Air-To-Ground Training at Avon Park Air Force Range, To Conduct Air-To-Ground Ordnance Delivery and Training, Fleet Forces Command’s Fleet Readiness Training Program (FRTP), Polk and Highland Counties, FL. Summary: EPA’s previous concerns have been resolved; therefore, EPA has no objection to the proposed action. Dated: November 15, 2005. Elaine Suriano, Environmental Scientist, Office of Federal Activities. [FR Doc. 05–22887 Filed 11–17–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6669–04] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements VerDate Aug<31>2005 15:21 Nov 17, 2005 Jkt 208001 Filed November 7, 2005 Through November 10, 2005. Pursuant to 40 CFR 1506.9. EIS No. 20050471, Draft EIS, AFS, WY, Moose-Gypsum Project, Proposes to Authorize Vegetation Treatments, Watershed Improvements, and Travel Plan and Recreation Updates, Pinedale Ranger District, BridgerTeton National Forest, Sublette County, WY, Comment Period Ends: January 3, 2006, Contact: Craig Trulock 307–367–4326. EIS No. 20050472, Second Draft Supplement, AFS, CO, Sheep Flats Diversity Unit, Timber Sales and Related Road Construction, Additional Information Regarding Wildlife Resources, Grand Mesa Uncompahgre and Gunnison National Forests, Grand Valley Ranger District, Mesa County, CO, Comment Period Ends: January 3, 2006, Contact: Carol McKenzie 208–634–0761. EIS No. 20050473, Draft EIS, COE, MT, Upper Columbia Alternative Flood Control and Fish Operations, Implementation, Libby and Hungry Horse Dams, Columbia River Basin, MT, Comment Period Ends: January 3, 2006, Contact: Evan Lewis 206–764– 6922. EIS No. 20050474, Final EIS, COE, CA, Mare Island Reuse of Dredged Material Disposal Ponds as a Confirmed Updated Dredged Material Disposal Facility, Issuing Section 404 Permit Clean Water Act and Section 10 Permit Rivers and Harbor Act, San Francisco Bay Area, City of Vallejo, Solando County, CA , Wait Period Ends: December 19, 2005, Contact: Robert J. Lawrence 415–977–8020. EIS No. 20050475, Final EIS, AFS, NM, Invasive Plant Control Project, Protection of the Abundance and Biological Diversity of Desired Native Plant, Carson National Forest and Santa Fe National Forest, Rio Arriba, Colfax, Los Alamos, Mora, San Miguel and Santa Fe Counties, NM, Wait Period Ends: December 19, 2005, Contact: Sanford Hurlocker 505–753– 7331. EIS No. 20050476, Final Supplement, AFS, AK, Emerald Bay Timber Sale, Implementation, Additional Information on the Potential Effects of the Project Alternatives, KetchikanMisty Fiords Ranger District, Tongass National Forest, AK, Wait Period Ends: December 19, 2005, Contact: Rob Reeck 907–228–4114. EIS No. 20050477, Final EIS, COE, AZ, Santa Cruz River, Paseo de las Iglesias Feasibility Study, To Identify, Define and Solve Environmental Degradation, Flooding and Water Resource Problems, City of Tucson, PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 69967 Pima County, AZ, Wait Period Ends: December 19, 2005, Contact: Michael J. Fink 602–640–2001 Ext. 252. EIS No. 20050478, Second Final EIS (Tiering), FHW, MO, Interstate 70 Corridor Improvements, Section of Independent Utility #4, from Missouri Route BB Interchange to Eastern Columbia, Funding, Boone County, MO, Wait Period Ends: December 19, 2005, Contact: Peggy Casey 573–636– 7104. EIS No. 20050479, Final EIS, SFW, 00, Resident Canada Goose Management Plan, Evaluate Alternatives Strategies to Reduce, Manage, and Resident Canada Goose Population, Implementation, within the Conterminous U.S., Wait Period Ends: December 19, 2005, Contact: Ron Kokel 703–358–1714. EIS No. 20050480, Final EIS, NOA, CA, PROGRAMMATIC—Montrose Settlements Restoration Plan, Restoration of Inquired Natural Resources, Channel Islands, Southern California Bight, Baja California Pacific Islands, Orange County, CA, Wait Period Ends: December 19, 2005, Contact: Greg Baker 301–713–1622. This document is available on the Internet at: https:// www.montrose.restoration.gov. EIS No. 20050481, Draft EIS, FTA, MO, St. Louis Metro South Metrolink Extension, Transportation Improvement, City of St. Louis, St. Louis County, MO, Comment Period Ends: January 6, 2006, Contact: Joan Roeseler 816–329–3936. EIS No. 20050482, Final EIS, AFS, WY, Cottonwood II Vegetation Management Project, Vegetation Management in the North and South Cottonwood Creek Drainages, Implementation, Bridger-Teton National Forest, Big Piney Ranger District, Sublette County, WY, Wait Period Ends: December 19, 2005, Contact: Jeff Laub 307–276–3375. EIS No. 20050483, Draft Supplement, UAF, 00, Realistic Bomber Training Initiative, Addressees Impacts of Wake Vortices on Surface Structures, Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Comment Period Ends: January 3, 2006, Contact: Sheryl Parker 757– 764–9334. EIS No. 20050484, Draft EIS, COE, CA, American River Watershed, Lower American River Common Features Mayhew Levee Project, Reconstruction, Sacramento County, CA, Comment Period Ends: January 3, 2006, Contact: Robert Koenigs 916– 557–6712. EIS No. 20050485, Final EIS, FRC, CA, Upper North Fork Feather River E:\FR\FM\18NON1.SGM 18NON1 69968 Federal Register / Vol. 70, No. 222 / Friday, November 18, 2005 / Notices Project (FERC No. 2105), Issuance of a New License for existing 3517.3 megawatt (MW) Hydroelectric Facility located in North Fork Feather River and Butt Creek, Plumas County, CA, Wait Period Ends: December 19, 2005, Contact: Thomas Russo 1–866–208– 3372. This document is available on the Internet at: https://www.ferc.gov. Dated: November 15, 2005. Elaine Suriano, Environmental Scientist, Office of Federal Activities. [FR Doc. 05–22888 Filed 11–17–05; 8:45 am] Bank Holding Company, Inc., Williston, North Dakota, and thereby indirectly acquire voting shares of American State Bank & Trust Company of Williston, Williston, North Dakota. In addition, Shirley A. Davidson, Tamara M. Davidson–Sogard, and Patrick O. Sogard to individually acquire voting shares of American State Bank Holding Company, Inc., Williston, North Dakota, and thereby indirectly acquire voting shares of American State Bank & Trust Company of Williston, Williston, North Dakota. FEDERAL RESERVE SYSTEM Board of Governors of the Federal Reserve System, November 14, 2005. Robert deV. Frierson, Deputy Secretary of the Board. [FR Doc. E5–6369 Filed 11–17–05; 8:45 am] Change in Bank Control Notices; Acquisition of Shares of Bank or Bank Holding Companies FEDERAL RESERVE SYSTEM BILLING CODE 6560–50–P BILLING CODE 6210–01–S The notificants listed below have applied under the Change in Bank Control Act (12 U.S.C. 1817(j)) and § 225.41 of the Board’s Regulation Y (12 CFR 225.41) to acquire a bank or bank holding company. The factors that are considered in acting on the notices are set forth in paragraph 7 of the Act (12 U.S.C. 1817(j)(7)). The notices are available for immediate inspection at the Federal Reserve Bank indicated. The notices also will be available for inspection at the office of the Board of Governors. Interested persons may express their views in writing to the Reserve Bank indicated for that notice or to the offices of the Board of Governors. Comments must be received not later than December 2, 2005. A. Federal Reserve Bank of Minneapolis (Jacqueline G. King, Community Affairs Officer) 90 Hennepin Avenue, Minneapolis, Minnesota 55480-0291: 1. Shirley A. Davidson; the Shirley A. Davidson Marital Trust, Shirley A. Davidson trustee; Tamara M. Davidson– Sogard; the Tamara M. Davidson– Sogard Family Generation Skipping Trust, Tamara M. Davidson–Sogard trustee; Patrick Oliver Sogard; Barrett W. Sogard; the Barrett W. Sogard Trust; Isabella M. Sogard; the Isabella M. Sogard Trust; Oliver T. Sogard; the Oliver T. Sogard Trust; Thomas P. Sogard; and the Thomas P. Sogard Trust, all of Williston, North Dakota and Thomas M. Davidson, Jr. and the Thomas M. Davidson Jr. Family Generation Skipping Trust, Thomas M. Davidson Jr. trustee, Minneapolis, Minnesota, a group acting in concert; to acquire voting shares of American State VerDate Aug<31>2005 15:21 Nov 17, 2005 Jkt 208001 Change in Bank Control Notices; Acquisition of Shares of Bank or Bank Holding Companies The notificants listed below have applied under the Change in Bank Control Act (12 U.S.C. 1817(j)) and § 225.41 of the Board’s Regulation Y (12 CFR 225.41) to acquire a bank or bank holding company. The factors that are considered in acting on the notices are set forth in paragraph 7 of the Act (12 U.S.C. 1817(j)(7)). The notices are available for immediate inspection at the Federal Reserve Bank indicated. The notices also will be available for inspection at the office of the Board of Governors. Interested persons may express their views in writing to the Reserve Bank indicated for that notice or to the offices of the Board of Governors. Comments must be received not later than December 5, 2005. A. Federal Reserve Bank of St. Louis (Glenda Wilson, Community Affairs Officer) 411 Locust Street, St. Louis, Missouri 63166-2034: 1. Scott Lee Bolding, Fayetteville, Arkansas; John Spellings Everett, Collierville, Tennessee; John Edgar Griffin, Columbus, Mississippi; Dayton Reid Hedgepeth, Memphis, Tennessee; Donald Lee Hutson, Memphis, Tennessee; Pritesh Bhagubhai Patel, Fort Worth, Texas; Jon Abner Reeves, Southaven, Mississippi; James Lee Stafford, West Point, Mississippi; James Lynn Teel, Winter Park, Florida; Brent Derek Trulove, Memphis, Tennessee; Frank Pearson Uhlhorn, Germantown, Tennessee; Theodore Gaillard Uhlhorn, V, Memphis, Tennessee; John Bullington Walker, Germantown, Tennessee; and William Gerald PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 Washington, Randolph, Mississippi, a group acting in concert; to acquire voting shares of MemphisFirst Corporation, Memphis, Tennessee, and thereby indirectly acquire voting shares of MemphisFirst Community Bank, Memphis, Tennessee. Board of Governors of the Federal Reserve System, November 15, 2005. Robert deV. Frierson, Deputy Secretary of the Board. [FR Doc. E5–6388 Filed 11–17–05; 8:45 am] BILLING CODE 6210–01–S FEDERAL RESERVE SYSTEM Formations of, Acquisitions by, and Mergers of Bank Holding Companies The companies listed in this notice have applied to the Board for approval, pursuant to the Bank Holding Company Act of 1956 (12 U.S.C. 1841 et seq.) (BHC Act), Regulation Y (12 CFR part 225), and all other applicable statutes and regulations to become a bank holding company and/or to acquire the assets or the ownership of, control of, or the power to vote shares of a bank or bank holding company and all of the banks and nonbanking companies owned by the bank holding company, including the companies listed below. The applications listed below, as well as other related filings required by the Board, are available for immediate inspection at the Federal Reserve Bank indicated. The application also will be available for inspection at the offices of the Board of Governors. Interested persons may express their views in writing on the standards enumerated in the BHC Act (12 U.S.C. 1842(c)). If the proposal also involves the acquisition of a nonbanking company, the review also includes whether the acquisition of the nonbanking company complies with the standards in section 4 of the BHC Act (12 U.S.C. 1843). Unless otherwise noted, nonbanking activities will be conducted throughout the United States. Additional information on all bank holding companies may be obtained from the National Information Center Web site at https://www.ffiec.gov/nic/. Unless otherwise noted, comments regarding each of these applications must be received at the Reserve Bank indicated or the offices of the Board of Governors not later than December 12, 2005. A. Federal Reserve Bank of Chicago (Patrick M. Wilder, Assistant Vice President) 230 South LaSalle Street, Chicago, Illinois 60690-1414: 1. Belmont Financial Group, Inc., Chicago, Illinois; to become a bank holding company by acquiring 100 E:\FR\FM\18NON1.SGM 18NON1

Agencies

[Federal Register Volume 70, Number 222 (Friday, November 18, 2005)]
[NOTI]
[Pages 69967-69968]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-22888]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6669-04]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed November 7, 2005 Through November 10, 2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050471, Draft EIS, AFS, WY, Moose-Gypsum Project, Proposes to 
Authorize Vegetation Treatments, Watershed Improvements, and Travel 
Plan and Recreation Updates, Pinedale Ranger District, Bridger-Teton 
National Forest, Sublette County, WY, Comment Period Ends:
    January 3, 2006, Contact: Craig Trulock 307-367-4326.
EIS No. 20050472, Second Draft Supplement, AFS, CO, Sheep Flats 
Diversity Unit, Timber Sales and Related Road Construction, Additional 
Information Regarding Wildlife Resources, Grand Mesa Uncompahgre and 
Gunnison National Forests, Grand Valley Ranger District, Mesa County, 
CO, Comment Period Ends: January 3, 2006, Contact: Carol McKenzie 208-
634-0761.
EIS No. 20050473, Draft EIS, COE, MT, Upper Columbia Alternative Flood 
Control and Fish Operations, Implementation, Libby and Hungry Horse 
Dams, Columbia River Basin, MT, Comment Period Ends: January 3, 2006, 
Contact: Evan Lewis 206-764-6922.
EIS No. 20050474, Final EIS, COE, CA, Mare Island Reuse of Dredged 
Material Disposal Ponds as a Confirmed Updated Dredged Material 
Disposal Facility, Issuing Section 404 Permit Clean Water Act and 
Section 10 Permit Rivers and Harbor Act, San Francisco Bay Area, City 
of Vallejo, Solando County, CA , Wait Period Ends: December 19, 2005, 
Contact: Robert J. Lawrence 415-977-8020.
EIS No. 20050475, Final EIS, AFS, NM, Invasive Plant Control Project, 
Protection of the Abundance and Biological Diversity of Desired Native 
Plant, Carson National Forest and Santa Fe National Forest, Rio Arriba, 
Colfax, Los Alamos, Mora, San Miguel and Santa Fe Counties, NM, Wait 
Period Ends: December 19, 2005, Contact: Sanford Hurlocker 505-753-
7331.
EIS No. 20050476, Final Supplement, AFS, AK, Emerald Bay Timber Sale, 
Implementation, Additional Information on the Potential Effects of the 
Project Alternatives, Ketchikan-Misty Fiords Ranger District, Tongass 
National Forest, AK, Wait Period Ends: December 19, 2005, Contact: Rob 
Reeck 907-228-4114.
EIS No. 20050477, Final EIS, COE, AZ, Santa Cruz River, Paseo de las 
Iglesias Feasibility Study, To Identify, Define and Solve Environmental 
Degradation, Flooding and Water Resource Problems, City of Tucson, Pima 
County, AZ, Wait Period Ends: December 19, 2005, Contact: Michael J. 
Fink 602-640-2001 Ext. 252.
EIS No. 20050478, Second Final EIS (Tiering), FHW, MO, Interstate 70 
Corridor Improvements, Section of Independent Utility 4, from 
Missouri Route BB Interchange to Eastern Columbia, Funding, Boone 
County, MO, Wait Period Ends: December 19, 2005, Contact: Peggy Casey 
573-636-7104.
EIS No. 20050479, Final EIS, SFW, 00, Resident Canada Goose Management 
Plan, Evaluate Alternatives Strategies to Reduce, Manage, and Resident 
Canada Goose Population, Implementation, within the Conterminous U.S., 
Wait Period Ends: December 19, 2005, Contact: Ron Kokel 703-358-1714.
EIS No. 20050480, Final EIS, NOA, CA, PROGRAMMATIC--Montrose 
Settlements Restoration Plan, Restoration of Inquired Natural 
Resources, Channel Islands, Southern California Bight, Baja California 
Pacific Islands, Orange County, CA, Wait Period Ends: December 19, 
2005, Contact: Greg Baker 301-713-1622.
    This document is available on the Internet at: https://
www.montrose.restoration.gov.
EIS No. 20050481, Draft EIS, FTA, MO, St. Louis Metro South Metrolink 
Extension, Transportation Improvement, City of St. Louis, St. Louis 
County, MO, Comment Period Ends: January 6, 2006, Contact: Joan 
Roeseler 816-329-3936.
EIS No. 20050482, Final EIS, AFS, WY, Cottonwood II Vegetation 
Management Project, Vegetation Management in the North and South 
Cottonwood Creek Drainages, Implementation, Bridger-Teton National 
Forest, Big Piney Ranger District, Sublette County, WY, Wait Period 
Ends: December 19, 2005, Contact: Jeff Laub 307-276-3375.
EIS No. 20050483, Draft Supplement, UAF, 00, Realistic Bomber Training 
Initiative, Addressees Impacts of Wake Vortices on Surface Structures, 
Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Comment 
Period Ends: January 3, 2006, Contact: Sheryl Parker 757-764-9334.
EIS No. 20050484, Draft EIS, COE, CA, American River Watershed, Lower 
American River Common Features Mayhew Levee Project, Reconstruction, 
Sacramento County, CA, Comment Period Ends: January 3, 2006, Contact: 
Robert Koenigs 916-557-6712.
EIS No. 20050485, Final EIS, FRC, CA, Upper North Fork Feather River

[[Page 69968]]

Project (FERC No. 2105), Issuance of a New License for existing 3517.3 
megawatt (MW) Hydroelectric Facility located in North Fork Feather 
River and Butt Creek, Plumas County, CA, Wait Period Ends: December 19, 
2005, Contact: Thomas Russo 1-866-208-3372.
    This document is available on the Internet at: https://www.ferc.gov.

    Dated: November 15, 2005.
Elaine Suriano,
Environmental Scientist, Office of Federal Activities.
[FR Doc. 05-22888 Filed 11-17-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.