Environmental Impacts Statements; Notice of Availability, 69967-69968 [05-22888]
Download as PDF
Federal Register / Vol. 70, No. 222 / Friday, November 18, 2005 / Notices
Permits, Providence County, RI and
New England.
Summary: EPA expressed
environmental concerns about the
potential need for additional air
emission control measures on marine
vessels, additional mitigation measures
to address impacts from entrainment of
fish, eggs, and larvae by ship ballast
water intakes, and requested an
opportunity for additional discussions
about potential environmental justice
impacts.
EIS No. 20050320, ERP No. F–AFS–
J65426–UT, Wasatch Plateau Grazing
Project, Proposal to Continue to
Authorize Sheep Grazing by Issuance
of a Term Grazing Permits on 31
Sheep Allotments, Manti-La Sal
National Forest, Sanpete, Ferron and
Price Ranger Districts, Sanpete,
Carbon, Utah and Emery County, UT.
Summary: The FEIS addressed EPA’s
concerns with impact to water quality.
EIS No. 20050408, ERP No. F–FHW–
F40432–WI, U.S. 41 Highway
Corridor Project, Transportation
Improvement between the Cities of
Oconto and Perhtigo, Funding,
Marinette and Oconto Counties, WI.
Summary: While EPA has no
objection to the proposed action, it
asked to be involved in planning the
wetland restoration of the more than
300 acres required for compensatory
mitigation.
EIS No. 20050449, ERP No. F–USN–
E11054–FL, Navy Air-To-Ground
Training at Avon Park Air Force
Range, To Conduct Air-To-Ground
Ordnance Delivery and Training,
Fleet Forces Command’s Fleet
Readiness Training Program (FRTP),
Polk and Highland Counties, FL.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA has
no objection to the proposed action.
Dated: November 15, 2005.
Elaine Suriano,
Environmental Scientist, Office of Federal
Activities.
[FR Doc. 05–22887 Filed 11–17–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6669–04]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
VerDate Aug<31>2005
15:21 Nov 17, 2005
Jkt 208001
Filed November 7, 2005 Through
November 10, 2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050471, Draft EIS, AFS, WY,
Moose-Gypsum Project, Proposes to
Authorize Vegetation Treatments,
Watershed Improvements, and Travel
Plan and Recreation Updates,
Pinedale Ranger District, BridgerTeton National Forest, Sublette
County, WY, Comment Period Ends:
January 3, 2006, Contact:
Craig Trulock 307–367–4326.
EIS No. 20050472, Second Draft
Supplement, AFS, CO, Sheep Flats
Diversity Unit, Timber Sales and
Related Road Construction,
Additional Information Regarding
Wildlife Resources, Grand Mesa
Uncompahgre and Gunnison National
Forests, Grand Valley Ranger District,
Mesa County, CO, Comment Period
Ends: January 3, 2006, Contact: Carol
McKenzie 208–634–0761.
EIS No. 20050473, Draft EIS, COE, MT,
Upper Columbia Alternative Flood
Control and Fish Operations,
Implementation, Libby and Hungry
Horse Dams, Columbia River Basin,
MT, Comment Period Ends: January 3,
2006, Contact: Evan Lewis 206–764–
6922.
EIS No. 20050474, Final EIS, COE, CA,
Mare Island Reuse of Dredged
Material Disposal Ponds as a
Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404
Permit Clean Water Act and Section
10 Permit Rivers and Harbor Act, San
Francisco Bay Area, City of Vallejo,
Solando County, CA , Wait Period
Ends: December 19, 2005, Contact:
Robert J. Lawrence 415–977–8020.
EIS No. 20050475, Final EIS, AFS, NM,
Invasive Plant Control Project,
Protection of the Abundance and
Biological Diversity of Desired Native
Plant, Carson National Forest and
Santa Fe National Forest, Rio Arriba,
Colfax, Los Alamos, Mora, San Miguel
and Santa Fe Counties, NM, Wait
Period Ends: December 19, 2005,
Contact: Sanford Hurlocker 505–753–
7331.
EIS No. 20050476, Final Supplement,
AFS, AK, Emerald Bay Timber Sale,
Implementation, Additional
Information on the Potential Effects of
the Project Alternatives, KetchikanMisty Fiords Ranger District, Tongass
National Forest, AK, Wait Period
Ends: December 19, 2005, Contact:
Rob Reeck 907–228–4114.
EIS No. 20050477, Final EIS, COE, AZ,
Santa Cruz River, Paseo de las Iglesias
Feasibility Study, To Identify, Define
and Solve Environmental
Degradation, Flooding and Water
Resource Problems, City of Tucson,
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
69967
Pima County, AZ, Wait Period Ends:
December 19, 2005, Contact: Michael
J. Fink 602–640–2001 Ext. 252.
EIS No. 20050478, Second Final EIS
(Tiering), FHW, MO, Interstate 70
Corridor Improvements, Section of
Independent Utility #4, from Missouri
Route BB Interchange to Eastern
Columbia, Funding, Boone County,
MO, Wait Period Ends: December 19,
2005, Contact: Peggy Casey 573–636–
7104.
EIS No. 20050479, Final EIS, SFW, 00,
Resident Canada Goose Management
Plan, Evaluate Alternatives Strategies
to Reduce, Manage, and Resident
Canada Goose Population,
Implementation, within the
Conterminous U.S., Wait Period Ends:
December 19, 2005, Contact: Ron
Kokel 703–358–1714.
EIS No. 20050480, Final EIS, NOA, CA,
PROGRAMMATIC—Montrose
Settlements Restoration Plan,
Restoration of Inquired Natural
Resources, Channel Islands, Southern
California Bight, Baja California
Pacific Islands, Orange County, CA,
Wait Period Ends: December 19, 2005,
Contact: Greg Baker 301–713–1622.
This document is available on the
Internet at: https://
www.montrose.restoration.gov.
EIS No. 20050481, Draft EIS, FTA, MO,
St. Louis Metro South Metrolink
Extension, Transportation
Improvement, City of St. Louis, St.
Louis County, MO, Comment Period
Ends: January 6, 2006, Contact: Joan
Roeseler 816–329–3936.
EIS No. 20050482, Final EIS, AFS, WY,
Cottonwood II Vegetation
Management Project, Vegetation
Management in the North and South
Cottonwood Creek Drainages,
Implementation, Bridger-Teton
National Forest, Big Piney Ranger
District, Sublette County, WY, Wait
Period Ends: December 19, 2005,
Contact: Jeff Laub 307–276–3375.
EIS No. 20050483, Draft Supplement,
UAF, 00, Realistic Bomber Training
Initiative, Addressees Impacts of
Wake Vortices on Surface Structures,
Dyess Air Force Base, TX and
Barksdale Air Force Base, LA,
Comment Period Ends: January 3,
2006, Contact: Sheryl Parker 757–
764–9334.
EIS No. 20050484, Draft EIS, COE, CA,
American River Watershed, Lower
American River Common Features
Mayhew Levee Project,
Reconstruction, Sacramento County,
CA, Comment Period Ends: January 3,
2006, Contact: Robert Koenigs 916–
557–6712.
EIS No. 20050485, Final EIS, FRC, CA,
Upper North Fork Feather River
E:\FR\FM\18NON1.SGM
18NON1
69968
Federal Register / Vol. 70, No. 222 / Friday, November 18, 2005 / Notices
Project (FERC No. 2105), Issuance of
a New License for existing 3517.3
megawatt (MW) Hydroelectric Facility
located in North Fork Feather River
and Butt Creek, Plumas County, CA,
Wait Period Ends: December 19, 2005,
Contact: Thomas Russo 1–866–208–
3372.
This document is available on the
Internet at: https://www.ferc.gov.
Dated: November 15, 2005.
Elaine Suriano,
Environmental Scientist, Office of Federal
Activities.
[FR Doc. 05–22888 Filed 11–17–05; 8:45 am]
Bank Holding Company, Inc., Williston,
North Dakota, and thereby indirectly
acquire voting shares of American State
Bank & Trust Company of Williston,
Williston, North Dakota. In addition,
Shirley A. Davidson, Tamara M.
Davidson–Sogard, and Patrick O. Sogard
to individually acquire voting shares of
American State Bank Holding Company,
Inc., Williston, North Dakota, and
thereby indirectly acquire voting shares
of American State Bank & Trust
Company of Williston, Williston, North
Dakota.
FEDERAL RESERVE SYSTEM
Board of Governors of the Federal Reserve
System, November 14, 2005.
Robert deV. Frierson,
Deputy Secretary of the Board.
[FR Doc. E5–6369 Filed 11–17–05; 8:45 am]
Change in Bank Control Notices;
Acquisition of Shares of Bank or Bank
Holding Companies
FEDERAL RESERVE SYSTEM
BILLING CODE 6560–50–P
BILLING CODE 6210–01–S
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire a bank or bank
holding company. The factors that are
considered in acting on the notices are
set forth in paragraph 7 of the Act (12
U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the office of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than
December 2, 2005.
A. Federal Reserve Bank of
Minneapolis (Jacqueline G. King,
Community Affairs Officer) 90
Hennepin Avenue, Minneapolis,
Minnesota 55480-0291:
1. Shirley A. Davidson; the Shirley A.
Davidson Marital Trust, Shirley A.
Davidson trustee; Tamara M. Davidson–
Sogard; the Tamara M. Davidson–
Sogard Family Generation Skipping
Trust, Tamara M. Davidson–Sogard
trustee; Patrick Oliver Sogard; Barrett
W. Sogard; the Barrett W. Sogard Trust;
Isabella M. Sogard; the Isabella M.
Sogard Trust; Oliver T. Sogard; the
Oliver T. Sogard Trust; Thomas P.
Sogard; and the Thomas P. Sogard
Trust, all of Williston, North Dakota and
Thomas M. Davidson, Jr. and the
Thomas M. Davidson Jr. Family
Generation Skipping Trust, Thomas M.
Davidson Jr. trustee, Minneapolis,
Minnesota, a group acting in concert; to
acquire voting shares of American State
VerDate Aug<31>2005
15:21 Nov 17, 2005
Jkt 208001
Change in Bank Control Notices;
Acquisition of Shares of Bank or Bank
Holding Companies
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire a bank or bank
holding company. The factors that are
considered in acting on the notices are
set forth in paragraph 7 of the Act (12
U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the office of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than
December 5, 2005.
A. Federal Reserve Bank of St. Louis
(Glenda Wilson, Community Affairs
Officer) 411 Locust Street, St. Louis,
Missouri 63166-2034:
1. Scott Lee Bolding, Fayetteville,
Arkansas; John Spellings Everett,
Collierville, Tennessee; John Edgar
Griffin, Columbus, Mississippi; Dayton
Reid Hedgepeth, Memphis, Tennessee;
Donald Lee Hutson, Memphis,
Tennessee; Pritesh Bhagubhai Patel,
Fort Worth, Texas; Jon Abner Reeves,
Southaven, Mississippi; James Lee
Stafford, West Point, Mississippi; James
Lynn Teel, Winter Park, Florida; Brent
Derek Trulove, Memphis, Tennessee;
Frank Pearson Uhlhorn, Germantown,
Tennessee; Theodore Gaillard Uhlhorn,
V, Memphis, Tennessee; John
Bullington Walker, Germantown,
Tennessee; and William Gerald
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Washington, Randolph, Mississippi, a
group acting in concert; to acquire
voting shares of MemphisFirst
Corporation, Memphis, Tennessee, and
thereby indirectly acquire voting shares
of MemphisFirst Community Bank,
Memphis, Tennessee.
Board of Governors of the Federal Reserve
System, November 15, 2005.
Robert deV. Frierson,
Deputy Secretary of the Board.
[FR Doc. E5–6388 Filed 11–17–05; 8:45 am]
BILLING CODE 6210–01–S
FEDERAL RESERVE SYSTEM
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
assets or the ownership of, control of, or
the power to vote shares of a bank or
bank holding company and all of the
banks and nonbanking companies
owned by the bank holding company,
including the companies listed below.
The applications listed below, as well
as other related filings required by the
Board, are available for immediate
inspection at the Federal Reserve Bank
indicated. The application also will be
available for inspection at the offices of
the Board of Governors. Interested
persons may express their views in
writing on the standards enumerated in
the BHC Act (12 U.S.C. 1842(c)). If the
proposal also involves the acquisition of
a nonbanking company, the review also
includes whether the acquisition of the
nonbanking company complies with the
standards in section 4 of the BHC Act
(12 U.S.C. 1843). Unless otherwise
noted, nonbanking activities will be
conducted throughout the United States.
Additional information on all bank
holding companies may be obtained
from the National Information Center
Web site at https://www.ffiec.gov/nic/.
Unless otherwise noted, comments
regarding each of these applications
must be received at the Reserve Bank
indicated or the offices of the Board of
Governors not later than December 12,
2005.
A. Federal Reserve Bank of Chicago
(Patrick M. Wilder, Assistant Vice
President) 230 South LaSalle Street,
Chicago, Illinois 60690-1414:
1. Belmont Financial Group, Inc.,
Chicago, Illinois; to become a bank
holding company by acquiring 100
E:\FR\FM\18NON1.SGM
18NON1
Agencies
[Federal Register Volume 70, Number 222 (Friday, November 18, 2005)]
[NOTI]
[Pages 69967-69968]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-22888]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6669-04]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed November 7, 2005 Through November 10, 2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050471, Draft EIS, AFS, WY, Moose-Gypsum Project, Proposes to
Authorize Vegetation Treatments, Watershed Improvements, and Travel
Plan and Recreation Updates, Pinedale Ranger District, Bridger-Teton
National Forest, Sublette County, WY, Comment Period Ends:
January 3, 2006, Contact: Craig Trulock 307-367-4326.
EIS No. 20050472, Second Draft Supplement, AFS, CO, Sheep Flats
Diversity Unit, Timber Sales and Related Road Construction, Additional
Information Regarding Wildlife Resources, Grand Mesa Uncompahgre and
Gunnison National Forests, Grand Valley Ranger District, Mesa County,
CO, Comment Period Ends: January 3, 2006, Contact: Carol McKenzie 208-
634-0761.
EIS No. 20050473, Draft EIS, COE, MT, Upper Columbia Alternative Flood
Control and Fish Operations, Implementation, Libby and Hungry Horse
Dams, Columbia River Basin, MT, Comment Period Ends: January 3, 2006,
Contact: Evan Lewis 206-764-6922.
EIS No. 20050474, Final EIS, COE, CA, Mare Island Reuse of Dredged
Material Disposal Ponds as a Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404 Permit Clean Water Act and
Section 10 Permit Rivers and Harbor Act, San Francisco Bay Area, City
of Vallejo, Solando County, CA , Wait Period Ends: December 19, 2005,
Contact: Robert J. Lawrence 415-977-8020.
EIS No. 20050475, Final EIS, AFS, NM, Invasive Plant Control Project,
Protection of the Abundance and Biological Diversity of Desired Native
Plant, Carson National Forest and Santa Fe National Forest, Rio Arriba,
Colfax, Los Alamos, Mora, San Miguel and Santa Fe Counties, NM, Wait
Period Ends: December 19, 2005, Contact: Sanford Hurlocker 505-753-
7331.
EIS No. 20050476, Final Supplement, AFS, AK, Emerald Bay Timber Sale,
Implementation, Additional Information on the Potential Effects of the
Project Alternatives, Ketchikan-Misty Fiords Ranger District, Tongass
National Forest, AK, Wait Period Ends: December 19, 2005, Contact: Rob
Reeck 907-228-4114.
EIS No. 20050477, Final EIS, COE, AZ, Santa Cruz River, Paseo de las
Iglesias Feasibility Study, To Identify, Define and Solve Environmental
Degradation, Flooding and Water Resource Problems, City of Tucson, Pima
County, AZ, Wait Period Ends: December 19, 2005, Contact: Michael J.
Fink 602-640-2001 Ext. 252.
EIS No. 20050478, Second Final EIS (Tiering), FHW, MO, Interstate 70
Corridor Improvements, Section of Independent Utility 4, from
Missouri Route BB Interchange to Eastern Columbia, Funding, Boone
County, MO, Wait Period Ends: December 19, 2005, Contact: Peggy Casey
573-636-7104.
EIS No. 20050479, Final EIS, SFW, 00, Resident Canada Goose Management
Plan, Evaluate Alternatives Strategies to Reduce, Manage, and Resident
Canada Goose Population, Implementation, within the Conterminous U.S.,
Wait Period Ends: December 19, 2005, Contact: Ron Kokel 703-358-1714.
EIS No. 20050480, Final EIS, NOA, CA, PROGRAMMATIC--Montrose
Settlements Restoration Plan, Restoration of Inquired Natural
Resources, Channel Islands, Southern California Bight, Baja California
Pacific Islands, Orange County, CA, Wait Period Ends: December 19,
2005, Contact: Greg Baker 301-713-1622.
This document is available on the Internet at: https://
www.montrose.restoration.gov.
EIS No. 20050481, Draft EIS, FTA, MO, St. Louis Metro South Metrolink
Extension, Transportation Improvement, City of St. Louis, St. Louis
County, MO, Comment Period Ends: January 6, 2006, Contact: Joan
Roeseler 816-329-3936.
EIS No. 20050482, Final EIS, AFS, WY, Cottonwood II Vegetation
Management Project, Vegetation Management in the North and South
Cottonwood Creek Drainages, Implementation, Bridger-Teton National
Forest, Big Piney Ranger District, Sublette County, WY, Wait Period
Ends: December 19, 2005, Contact: Jeff Laub 307-276-3375.
EIS No. 20050483, Draft Supplement, UAF, 00, Realistic Bomber Training
Initiative, Addressees Impacts of Wake Vortices on Surface Structures,
Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Comment
Period Ends: January 3, 2006, Contact: Sheryl Parker 757-764-9334.
EIS No. 20050484, Draft EIS, COE, CA, American River Watershed, Lower
American River Common Features Mayhew Levee Project, Reconstruction,
Sacramento County, CA, Comment Period Ends: January 3, 2006, Contact:
Robert Koenigs 916-557-6712.
EIS No. 20050485, Final EIS, FRC, CA, Upper North Fork Feather River
[[Page 69968]]
Project (FERC No. 2105), Issuance of a New License for existing 3517.3
megawatt (MW) Hydroelectric Facility located in North Fork Feather
River and Butt Creek, Plumas County, CA, Wait Period Ends: December 19,
2005, Contact: Thomas Russo 1-866-208-3372.
This document is available on the Internet at: https://www.ferc.gov.
Dated: November 15, 2005.
Elaine Suriano,
Environmental Scientist, Office of Federal Activities.
[FR Doc. 05-22888 Filed 11-17-05; 8:45 am]
BILLING CODE 6560-50-P