Gulfstream Natural Gas System, L.L.C.; Notice of Negotiated Rates, 69749 [E5-6346]
Download as PDF
Federal Register / Vol. 70, No. 221 / Thursday, November 17, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER05–1281–000, ER05–1281–
001, and ER05–1281–002]
FPL Energy Duane Arnold, LLC; Notice
of Issuance of Order
November 9, 2005.
FPL Energy Duane Arnold, LLC (FPL
Duane) filed an application for marketbased rate authority, with an
accompanying rate tariff. The proposed
rate tariff provides for wholesale sales of
energy, capacity and ancillary services
at market-based rates. FPL Duane also
requested waiver of various Commission
regulations. In particular, FPL Duane
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by FPL Duane.
On November 8, 2005, the Director,
Division of Tariffs and Market
Development—South, granted the
request for blanket approval under Part
34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by FPL Duane should file a
motion to intervene or protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protests, is December 8, 2005.
Absent a request to be heard in
opposition by the deadline above, FPL
Duane is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of FPL Duane, compatible
with the public interest, and is
reasonably necessary or appropriate for
such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of FPL Duane’s issuances of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
VerDate Aug<31>2005
17:38 Nov 16, 2005
Jkt 208001
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6339 Filed 11–16–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
69749
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E5–6346 Filed 11–16–05; 8:45 am]
[Docket No. RP02–361–056]
BILLING CODE 6717–01–P
Gulfstream Natural Gas System, L.L.C.;
Notice of Negotiated Rates
DEPARTMENT OF ENERGY
November 9, 2005.
Take notice that on November 4,
2005, Gulfstream Natural Gas System,
L.L.C. (Gulfstream) tendered for filing as
part of its FERC Gas Tariff, Original
Volume No. 1, Original Sheet Nos. 8.01v
and 8.01w, each reflecting an effective
date of November 7, 2005.
Gulfstream states that copies of its
filing have been mailed to all affected
customers and interested state
commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP06–84–000]
Iroquois Gas Transmission System,
L.P.; Notice of Proposed Changes in
FERC Gas Tariff
November 9, 2005.
Take notice that on November 4,
2005, Iroquois Gas Transmission
System, L.P. (Iroquois) tendered for
filing to become part of its FERC Gas
Tariff, First Revised Volume No. 1, the
following revised sheets, to be effective
on December 4, 2005:
Fifth Revised Sheet No. 50.
Fourth Revised Sheet No. 50A.
Fourth Revised Sheet No. 50B.
First Revised Sheet No. 52A.
Second Revised Sheet 84A.
Third Revised Sheet No. 115.
Fifth Revised Sheet No. 161.
Seventh Revised Sheet No. 162.
Iroquois states that copies of its filing
were served on all jurisdictional
customers and interested state
regulatory agencies and all parties to the
proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 70, Number 221 (Thursday, November 17, 2005)]
[Notices]
[Page 69749]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6346]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP02-361-056]
Gulfstream Natural Gas System, L.L.C.; Notice of Negotiated Rates
November 9, 2005.
Take notice that on November 4, 2005, Gulfstream Natural Gas
System, L.L.C. (Gulfstream) tendered for filing as part of its FERC Gas
Tariff, Original Volume No. 1, Original Sheet Nos. 8.01v and 8.01w,
each reflecting an effective date of November 7, 2005.
Gulfstream states that copies of its filing have been mailed to all
affected customers and interested state commissions.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-6346 Filed 11-16-05; 8:45 am]
BILLING CODE 6717-01-P