San Juan Mesa Wind Project, LLC, Padoma Project Holdings, LLC, Mission Wind New Mexico; Notice of Filing, 69332 [E5-6280]
Download as PDF
69332
Federal Register / Vol. 70, No. 219 / Tuesday, November 15, 2005 / Notices
Comment Date: 5 p.m. eastern time on
November 25, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6275 Filed 11–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EC06–24–000]
San Juan Mesa Wind Project, LLC,
Padoma Project Holdings, LLC,
Mission Wind New Mexico; Notice of
Filing
November 7, 2005.
Take notice that on November 3,
2005, San Juan Mesa Wind Project, LLC
(San Juan Mesa), Padoma Project
Holdings, LLC (Padoma) and Mission
Wind New Mexico (Mission Wind NM)
filed with the Commission an
application pursuant to section 203 of
the Federal Power Act for authorization
of an indirect disposition of
jurisdictional facilities in connection
with the transfer by Padoma of its one
hundred percent membership interest in
San Juan Mesa to Mission Wind NM and
a subsequent transfer of a twenty-five
percent membership interest in San
Juan Mesa to Citicorp N.A. or its
affiliate. Pursuant to Section 388.112 of
the Commission’s regulations, 18 CFR
388.112, San Juan Mesa, Padoma and
Mission Wind NM request confidential
treatment of the documents relating to
these respective transactions that are
attached as Exhibit I to this Application.
San Juan Mesa states that it is
developing and constructing an
approximately 120 megawatt wind
energy generating facility located in
Roosevelt and Chaves Counties, New
Mexico.
San Juan Mesa states that a copy of
the application was served upon the
New Mexico Public Regulation
Commission.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR. 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
VerDate Aug<31>2005
15:50 Nov 14, 2005
Jkt 208001
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time on
November 25, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6280 Filed 11–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
November 7, 2005.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER01–316–018.
Applicants: ISO New England Inc.
Description: ISO New England, Inc
submits its Index of Customers for the
third quarter of 2005.
Filed Date: November 1, 2005.
Accession Number: 20051103–0038.
Comment Date: 5 p.m. eastern time on
Tuesday, November 22, 2005.
Docket Numbers: ER04–445–013.
Applicants: California Independent
System Operator Corporation.
Description: The California
Independent System Operator Corp
submits its long-term Standard Large
Generator Interconnection Procedures
etc. pursuant to FERC’s June 16, 2005
Order.
Filed Date: November 1, 2005.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Accession Number: 20051103–0065.
Comment Date: 5 p.m. eastern time on
Tuesday, November 22, 2005.
Docket Numbers: ER04–445–014;
ER04–435–018; ER04–441–010; ER04–
443–010.
Applicants: California Independent
System Operator; Pacific Gas and
Electric Company, San Diego Gas &
Electric Company; Southern California
Edison Company.
Description: California Independent
System Operator Corp, Pacific Gas &
Electric Co et al. submit a long-term
Standard Large Generator
Interconnection Agreement for approval
as a pro forma agreement per FERC’s
July 1, 2005 Order.
Filed Date: November 1, 2005.
Accession Number: 20051103–0096.
Comment Date: 5 p.m. eastern time on
Tuesday, November 22, 2005.
Docket Numbers: ER05–1326–002.
Applicants: Cornerstone Energy
General Partners, LLC.
Description: CornerStone Energy
General Partners, LLC submits Revised
Sheet No. 2 to FERC Electric Tariff,
Original Volume No. 1.
Filed Date: October 31, 2005.
Accession Number: 20051104–0300.
Comment Date: 5 p.m. eastern time on
Monday, November 21, 2005.
Docket Numbers: ER05–718–004.
Applicants: California Independent
System Operator.
Description: California Independent
System Operator submits compliance
filing to clarify CAISO’s authority to
settle intertie transactions.
Filed Date: November 1, 2005.
Accession Number: 20051103–0095.
Comment Date: 5 p.m. eastern time on
Tuesday, November 22, 2005.
Docket Numbers: ER06–5–001.
Applicants: CBK Group, LTD.
Description: Petition of CBK Group
Ltd for acceptance of amended rate
schedule, waivers and blanket authority.
Filed Date: October 28, 2005.
Accession Number: 20051104–0318.
Comment Date: 5 p.m. eastern time on
Friday, November 18, 2005.
Docket Numbers: ER91–569–030;
EL04–123–004; EL05–105–002; ER01–
666–006; ER02–862–006; ER01–1675–
004; ER01–1804–005.
Applicants: Entergy Services, Inc.
Description: Entergy Services Inc on
behalf of EWO Marketing LP et al.
submits a compliance filing pursuant to
FERC’s December 17, 2004 order.
Filed Date: November 1, 2005.
Accession Number: 20051104–0299.
Comment Date: 5 p.m. eastern time on
Tuesday, November 22, 2005.
Docket Numbers: ER91–569–031;
EL04–123–005; EL05–105–003.
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 70, Number 219 (Tuesday, November 15, 2005)]
[Notices]
[Page 69332]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6280]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC06-24-000]
San Juan Mesa Wind Project, LLC, Padoma Project Holdings, LLC,
Mission Wind New Mexico; Notice of Filing
November 7, 2005.
Take notice that on November 3, 2005, San Juan Mesa Wind Project,
LLC (San Juan Mesa), Padoma Project Holdings, LLC (Padoma) and Mission
Wind New Mexico (Mission Wind NM) filed with the Commission an
application pursuant to section 203 of the Federal Power Act for
authorization of an indirect disposition of jurisdictional facilities
in connection with the transfer by Padoma of its one hundred percent
membership interest in San Juan Mesa to Mission Wind NM and a
subsequent transfer of a twenty-five percent membership interest in San
Juan Mesa to Citicorp N.A. or its affiliate. Pursuant to Section
388.112 of the Commission's regulations, 18 CFR 388.112, San Juan Mesa,
Padoma and Mission Wind NM request confidential treatment of the
documents relating to these respective transactions that are attached
as Exhibit I to this Application. San Juan Mesa states that it is
developing and constructing an approximately 120 megawatt wind energy
generating facility located in Roosevelt and Chaves Counties, New
Mexico.
San Juan Mesa states that a copy of the application was served upon
the New Mexico Public Regulation Commission.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR. 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant. On or before the comment date, it is
not necessary to serve motions to intervene or protests on persons
other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. eastern time on November 25, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5-6280 Filed 11-14-05; 8:45 am]
BILLING CODE 6717-01-P