Federal Acquisition Regulation; Technical Amendments, 69100-69101 [05-22505]

Download as PDF 69100 Federal Register / Vol. 70, No. 218 / Monday, November 14, 2005 / Rules and Regulations ˘ ´ HSM 47 Buildings on Ile des Petrels, ´ Terre Adelie ´ HSM 48 Cross on ˘le des Petrels, Terre I ´ Adelie HSM 49 Pillar at Bunger Hill, Queen Mary Land HSM 50 Plaque at Fildes Peninsula, King George Island, South Shetland Islands HSM 51 Grave and cross at Admiralty Bay, King George Island, South Shetland Islands HSM 52 Monolith at Fildes Peninsula, King George Island, South Shetland Islands HSM 53 Monolith and plaques on Elephant Island, South Shetland Islands HSM 54 Bust on Ross Island HSM 55 Buildings and artifacts on Stonington Island, Marguerite Bay, Antarctic Peninsula HSM 56 Remains of hut and environs at Waterboat Point, Danco Coast, Antarctic Peninsula HSM 57 Plaque at ‘‘Yankee Bay’’ (Yankee Harbour), MacFarlane Strait, Greenwich Island, South Shetland Islands HSM 59 Cairn on Half Moon Beach, Cape Shirreff, Livingston Island, South Shetland Islands HSM 60 Plaque and cairn at ‘‘Penguins Bay’’, Seymour Island, James Ross Island archipelago HSM 61 ‘‘Base A’’ at Port Lockroy, Goudier Island, off Wiencke Island, Antarctic Peninsula HSM 62 ‘‘Base F (Wordie House)’’ on Winter Island, Argentine Islands HSM 63 ‘‘Base Y’’ on Horseshoe Island, Marguerite Bay, western Graham Land HSM 64 ‘‘Base E’’ on Stonington Island, Marguerite Bay, western Graham Land HSM 65 Message post on Foyn Island, Possession Islands HSM 66 Cairn at Scott Nunataks, Alexandra Mountains HSM 67 Rock shelter ‘‘Granite House’’ at Cape Geology, Granite Harbour HSM 68 Depot at Hells Gate Moraine, Inexpressible Island, Terra Nova Bay HSM 69 Message post at Cape Crozier, Ross Island HSM 70 Message post at Cape Wadworth, Coulman Island HSM 71 Whaling station at Whalers Bay, Deception Island HSM 72 Cairn on Tryne Islands, Vestfold Hills HSM 73 Memorial Cross, Lewis Bay, Ross Island HSM 74 Wreckage of sailing ship, Elephant Island, South Shetland Islands HSM 75 ‘‘A Hut’’, Pram Point, Ross Island VerDate Aug<31>2005 15:39 Nov 10, 2005 Jkt 208001 HSM 76 Ruins of base ‘‘Pedro Aguirre Cerda’’, Pendulum Cove, Deception Island HSM 77 Cape Denison, Commonwealth Bay, George V Land HSM 78 Memorial Plaque at India Point, Humboldt Mountains, Wohlthat Massif, central Dronning Maud Land HSM 79 Lilie Marleen Hut, Mt. Dockery, Everett Range, Northern Victoria Land HSM 80 Amundsen’s Tent [FR Doc. 05–22545 Filed 11–10–05; 8:45 am] BILLING CODE 7555–01–M Dated: November 4, 2005. Gerald Zaffos, Director, Contract Policy Division. Federal Acquisition Circular Federal Acquisition Circular (FAC) 2005-06 Correction is issued under the authority of the Secretary of Defense, the Administrator of General Services, and the Administrator for the National Aeronautics and Space Administration. Unless otherwise specified, all Federal Acquisition Regulation (FAR) and other directive material contained in FAC 2005-06 Correction are effective November 14, 2005. Dated: November 4, 2005. Domenic C. Cipicchio, Acting Director, Defense Procurement and Acquisition Policy. DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 2 and 31 [FAC 2005–06; FAR Cases 2004–018 and 2004–006; Correction] Federal Acquisition Regulation; Technical Amendments AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). Dated: November 4, 2005. Roger Waldron, Acting Senior Procurement Executive, Office of the Chief Acquisition Officer, General Services Administration. Dated: November 1, 2005. Tom Luedtke, Assistant Administrator for Procurement, National Aeronautics and Space Administration. Therefore, DoD, GSA, and NASA amend 48 CFR parts 2 and 31 as set forth below: I 1. The authority citation for 48 CFR parts 2 and 31 continues to read as follows: I Technical amendment. Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c). SUMMARY: The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing amendments to the Federal Acquisition Regulation (FAR) to correct references included in FAC 2005–06, FAR cases 2004–018, Information Technology Security (Item I), and 2004– 006, Accounting for Unallowable Costs (Item IX), which were published in the Federal Register at 70 FR 57449 and 57463, September 30, 2005. PART 2—DEFINITIONS OF WORDS AND TERMS ACTION: DATES: Effective Date: November 14, 2005. The FAR Secretariat, Room 4035, GS Building, Washington, DC, 20405, (202) 501–4755, for information pertaining to status or publication schedules. Please cite FAC 2005–06 Correction, Technical Amendments. FOR FURTHER INFORMATION CONTACT: List of Subjects in 48 CFR Parts 2 and 31 Government procurement. PO 00000 Frm 00060 Fmt 4700 Sfmt 4700 2.101 [Amended] 2. Amend section 2.101 in paragraph (b) by removing the definition ‘‘Sensitive But Unclassified (SBU) information’’. I PART 31—CONTRACT COST PRINCIPLES AND PROCEDURES 31.201–6 [Amended] 3. Amend section 31.201–6 by revising the introductory text of paragraph (c)(2) to read as follows: I 31.201–6 costs. Accounting for unallowable * * * * * (c) * * * (2) Statistical sampling is an acceptable practice for contractors to follow in accounting for and presenting unallowable costs provided the following criteria in paragraphs (c)(2)(i), E:\FR\FM\14NOR1.SGM 14NOR1 Federal Register / Vol. 70, No. 218 / Monday, November 14, 2005 / Rules and Regulations (c)(2)(ii), and (c)(2)(iii) of this subsection are met: * * * * * [FR Doc. 05–22505 Filed 11–10–05; 8:45 am] BILLING CODE 6820–EP–S VerDate Aug<31>2005 15:39 Nov 10, 2005 Jkt 208001 PO 00000 Frm 00061 Fmt 4700 Sfmt 4700 E:\FR\FM\14NOR1.SGM 14NOR1 69101

Agencies

[Federal Register Volume 70, Number 218 (Monday, November 14, 2005)]
[Rules and Regulations]
[Pages 69100-69101]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-22505]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 2 and 31

[FAC 2005-06; FAR Cases 2004-018 and 2004-006; Correction]


Federal Acquisition Regulation; Technical Amendments

AGENCIES: Department of Defense (DoD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Technical amendment.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council are issuing amendments to the Federal 
Acquisition Regulation (FAR) to correct references included in FAC 
2005-06, FAR cases 2004-018, Information Technology Security (Item I), 
and 2004-006, Accounting for Unallowable Costs (Item IX), which were 
published in the Federal Register at 70 FR 57449 and 57463, September 
30, 2005.

DATES: Effective Date: November 14, 2005.

FOR FURTHER INFORMATION CONTACT: The FAR Secretariat, Room 4035, GS 
Building, Washington, DC, 20405, (202) 501-4755, for information 
pertaining to status or publication schedules. Please cite FAC 2005-06 
Correction, Technical Amendments.

List of Subjects in 48 CFR Parts 2 and 31

    Government procurement.

    Dated: November 4, 2005.
Gerald Zaffos,
Director, Contract Policy Division.

Federal Acquisition Circular

    Federal Acquisition Circular (FAC) 2005-06 Correction is issued 
under the authority of the Secretary of Defense, the Administrator of 
General Services, and the Administrator for the National Aeronautics 
and Space Administration.
    Unless otherwise specified, all Federal Acquisition Regulation 
(FAR) and other directive material contained in FAC 2005-06 Correction 
are effective November 14, 2005.

    Dated: November 4, 2005.
Domenic C. Cipicchio,
Acting Director, Defense Procurement and Acquisition Policy.

    Dated: November 4, 2005.
Roger Waldron,
Acting Senior Procurement Executive, Office of the Chief Acquisition 
Officer, General Services Administration.

    Dated: November 1, 2005.
Tom Luedtke,
Assistant Administrator for Procurement, National Aeronautics and Space 
Administration.

0
Therefore, DoD, GSA, and NASA amend 48 CFR parts 2 and 31 as set forth 
below:
0
1. The authority citation for 48 CFR parts 2 and 31 continues to read 
as follows:

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 2--DEFINITIONS OF WORDS AND TERMS


2.101  [Amended]

0
2. Amend section 2.101 in paragraph (b) by removing the definition 
``Sensitive But Unclassified (SBU) information''.

PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES


31.201-6  [Amended]

0
3. Amend section 31.201-6 by revising the introductory text of 
paragraph (c)(2) to read as follows:


31.201-6  Accounting for unallowable costs.

* * * * *
    (c) * * *
    (2) Statistical sampling is an acceptable practice for contractors 
to follow in accounting for and presenting unallowable costs provided 
the following criteria in paragraphs (c)(2)(i),

[[Page 69101]]

(c)(2)(ii), and (c)(2)(iii) of this subsection are met:
* * * * *
[FR Doc. 05-22505 Filed 11-10-05; 8:45 am]
BILLING CODE 6820-EP-S
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.