Federal Acquisition Regulation; Technical Amendments, 69100-69101 [05-22505]
Download as PDF
69100
Federal Register / Vol. 70, No. 218 / Monday, November 14, 2005 / Rules and Regulations
˘
´
HSM 47 Buildings on Ile des Petrels,
´
Terre Adelie
´
HSM 48 Cross on ˘le des Petrels, Terre
I
´
Adelie
HSM 49 Pillar at Bunger Hill, Queen
Mary Land
HSM 50 Plaque at Fildes Peninsula,
King George Island, South Shetland
Islands
HSM 51 Grave and cross at Admiralty
Bay, King George Island, South
Shetland Islands
HSM 52 Monolith at Fildes Peninsula,
King George Island, South Shetland
Islands
HSM 53 Monolith and plaques on
Elephant Island, South Shetland
Islands
HSM 54 Bust on Ross Island
HSM 55 Buildings and artifacts on
Stonington Island, Marguerite Bay,
Antarctic Peninsula
HSM 56 Remains of hut and environs
at Waterboat Point, Danco Coast,
Antarctic Peninsula
HSM 57 Plaque at ‘‘Yankee Bay’’
(Yankee Harbour), MacFarlane Strait,
Greenwich Island, South Shetland
Islands
HSM 59 Cairn on Half Moon Beach,
Cape Shirreff, Livingston Island,
South Shetland Islands
HSM 60 Plaque and cairn at ‘‘Penguins
Bay’’, Seymour Island, James Ross
Island archipelago
HSM 61 ‘‘Base A’’ at Port Lockroy,
Goudier Island, off Wiencke Island,
Antarctic Peninsula
HSM 62 ‘‘Base F (Wordie House)’’ on
Winter Island, Argentine Islands
HSM 63 ‘‘Base Y’’ on Horseshoe
Island, Marguerite Bay, western
Graham Land
HSM 64 ‘‘Base E’’ on Stonington
Island, Marguerite Bay, western
Graham Land
HSM 65 Message post on Foyn Island,
Possession Islands
HSM 66 Cairn at Scott Nunataks,
Alexandra Mountains
HSM 67 Rock shelter ‘‘Granite House’’
at Cape Geology, Granite Harbour
HSM 68 Depot at Hells Gate Moraine,
Inexpressible Island, Terra Nova Bay
HSM 69 Message post at Cape Crozier,
Ross Island
HSM 70 Message post at Cape
Wadworth, Coulman Island
HSM 71 Whaling station at Whalers
Bay, Deception Island
HSM 72 Cairn on Tryne Islands,
Vestfold Hills
HSM 73 Memorial Cross, Lewis Bay,
Ross Island
HSM 74 Wreckage of sailing ship,
Elephant Island, South Shetland
Islands
HSM 75 ‘‘A Hut’’, Pram Point, Ross
Island
VerDate Aug<31>2005
15:39 Nov 10, 2005
Jkt 208001
HSM 76 Ruins of base ‘‘Pedro Aguirre
Cerda’’, Pendulum Cove, Deception
Island
HSM 77 Cape Denison,
Commonwealth Bay, George V Land
HSM 78 Memorial Plaque at India
Point, Humboldt Mountains,
Wohlthat Massif, central Dronning
Maud Land
HSM 79 Lilie Marleen Hut, Mt.
Dockery, Everett Range, Northern
Victoria Land
HSM 80 Amundsen’s Tent
[FR Doc. 05–22545 Filed 11–10–05; 8:45 am]
BILLING CODE 7555–01–M
Dated: November 4, 2005.
Gerald Zaffos,
Director, Contract Policy Division.
Federal Acquisition Circular
Federal Acquisition Circular (FAC)
2005-06 Correction is issued under the
authority of the Secretary of Defense,
the Administrator of General Services,
and the Administrator for the National
Aeronautics and Space Administration.
Unless otherwise specified, all
Federal Acquisition Regulation (FAR)
and other directive material contained
in FAC 2005-06 Correction are effective
November 14, 2005.
Dated: November 4, 2005.
Domenic C. Cipicchio,
Acting Director, Defense Procurement and
Acquisition Policy.
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
48 CFR Parts 2 and 31
[FAC 2005–06; FAR Cases 2004–018 and
2004–006; Correction]
Federal Acquisition Regulation;
Technical Amendments
AGENCIES: Department of Defense (DoD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
Dated: November 4, 2005.
Roger Waldron,
Acting Senior Procurement Executive, Office
of the Chief Acquisition Officer, General
Services Administration.
Dated: November 1, 2005.
Tom Luedtke,
Assistant Administrator for Procurement,
National Aeronautics and Space
Administration.
Therefore, DoD, GSA, and NASA
amend 48 CFR parts 2 and 31 as set
forth below:
I 1. The authority citation for 48 CFR
parts 2 and 31 continues to read as
follows:
I
Technical amendment.
Authority: 40 U.S.C. 121(c); 10 U.S.C.
chapter 137; and 42 U.S.C. 2473(c).
SUMMARY: The Civilian Agency
Acquisition Council and the Defense
Acquisition Regulations Council are
issuing amendments to the Federal
Acquisition Regulation (FAR) to correct
references included in FAC 2005–06,
FAR cases 2004–018, Information
Technology Security (Item I), and 2004–
006, Accounting for Unallowable Costs
(Item IX), which were published in the
Federal Register at 70 FR 57449 and
57463, September 30, 2005.
PART 2—DEFINITIONS OF WORDS
AND TERMS
ACTION:
DATES:
Effective Date: November 14,
2005.
The
FAR Secretariat, Room 4035, GS
Building, Washington, DC, 20405, (202)
501–4755, for information pertaining to
status or publication schedules. Please
cite FAC 2005–06 Correction, Technical
Amendments.
FOR FURTHER INFORMATION CONTACT:
List of Subjects in 48 CFR Parts 2 and
31
Government procurement.
PO 00000
Frm 00060
Fmt 4700
Sfmt 4700
2.101
[Amended]
2. Amend section 2.101 in paragraph
(b) by removing the definition
‘‘Sensitive But Unclassified (SBU)
information’’.
I
PART 31—CONTRACT COST
PRINCIPLES AND PROCEDURES
31.201–6
[Amended]
3. Amend section 31.201–6 by
revising the introductory text of
paragraph (c)(2) to read as follows:
I
31.201–6
costs.
Accounting for unallowable
*
*
*
*
*
(c) * * *
(2) Statistical sampling is an
acceptable practice for contractors to
follow in accounting for and presenting
unallowable costs provided the
following criteria in paragraphs (c)(2)(i),
E:\FR\FM\14NOR1.SGM
14NOR1
Federal Register / Vol. 70, No. 218 / Monday, November 14, 2005 / Rules and Regulations
(c)(2)(ii), and (c)(2)(iii) of this subsection
are met:
*
*
*
*
*
[FR Doc. 05–22505 Filed 11–10–05; 8:45 am]
BILLING CODE 6820–EP–S
VerDate Aug<31>2005
15:39 Nov 10, 2005
Jkt 208001
PO 00000
Frm 00061
Fmt 4700
Sfmt 4700
E:\FR\FM\14NOR1.SGM
14NOR1
69101
Agencies
[Federal Register Volume 70, Number 218 (Monday, November 14, 2005)]
[Rules and Regulations]
[Pages 69100-69101]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-22505]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Parts 2 and 31
[FAC 2005-06; FAR Cases 2004-018 and 2004-006; Correction]
Federal Acquisition Regulation; Technical Amendments
AGENCIES: Department of Defense (DoD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Technical amendment.
-----------------------------------------------------------------------
SUMMARY: The Civilian Agency Acquisition Council and the Defense
Acquisition Regulations Council are issuing amendments to the Federal
Acquisition Regulation (FAR) to correct references included in FAC
2005-06, FAR cases 2004-018, Information Technology Security (Item I),
and 2004-006, Accounting for Unallowable Costs (Item IX), which were
published in the Federal Register at 70 FR 57449 and 57463, September
30, 2005.
DATES: Effective Date: November 14, 2005.
FOR FURTHER INFORMATION CONTACT: The FAR Secretariat, Room 4035, GS
Building, Washington, DC, 20405, (202) 501-4755, for information
pertaining to status or publication schedules. Please cite FAC 2005-06
Correction, Technical Amendments.
List of Subjects in 48 CFR Parts 2 and 31
Government procurement.
Dated: November 4, 2005.
Gerald Zaffos,
Director, Contract Policy Division.
Federal Acquisition Circular
Federal Acquisition Circular (FAC) 2005-06 Correction is issued
under the authority of the Secretary of Defense, the Administrator of
General Services, and the Administrator for the National Aeronautics
and Space Administration.
Unless otherwise specified, all Federal Acquisition Regulation
(FAR) and other directive material contained in FAC 2005-06 Correction
are effective November 14, 2005.
Dated: November 4, 2005.
Domenic C. Cipicchio,
Acting Director, Defense Procurement and Acquisition Policy.
Dated: November 4, 2005.
Roger Waldron,
Acting Senior Procurement Executive, Office of the Chief Acquisition
Officer, General Services Administration.
Dated: November 1, 2005.
Tom Luedtke,
Assistant Administrator for Procurement, National Aeronautics and Space
Administration.
0
Therefore, DoD, GSA, and NASA amend 48 CFR parts 2 and 31 as set forth
below:
0
1. The authority citation for 48 CFR parts 2 and 31 continues to read
as follows:
Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42
U.S.C. 2473(c).
PART 2--DEFINITIONS OF WORDS AND TERMS
2.101 [Amended]
0
2. Amend section 2.101 in paragraph (b) by removing the definition
``Sensitive But Unclassified (SBU) information''.
PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES
31.201-6 [Amended]
0
3. Amend section 31.201-6 by revising the introductory text of
paragraph (c)(2) to read as follows:
31.201-6 Accounting for unallowable costs.
* * * * *
(c) * * *
(2) Statistical sampling is an acceptable practice for contractors
to follow in accounting for and presenting unallowable costs provided
the following criteria in paragraphs (c)(2)(i),
[[Page 69101]]
(c)(2)(ii), and (c)(2)(iii) of this subsection are met:
* * * * *
[FR Doc. 05-22505 Filed 11-10-05; 8:45 am]
BILLING CODE 6820-EP-S