Portland Natural Gas Transmission System; Notice of Compliance Filing, 68428 [E5-6225]
Download as PDF
68428
Federal Register / Vol. 70, No. 217 / Thursday, November 10, 2005 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2114]
[Docket No. RP05–671–002]
Portland Natural Gas Transmission
System; Notice of Compliance Filing
Public Utilities District No. 2 of Grant
County, WA; Notice of Authorization
for Continued Project Operation
November 4, 2005.
November 2, 2005.
Take notice that on October 31, 2005,
Portland Natural Gas Transmission
System (PNGTS) tendered for filing to
become part of its FERC Gas Tariff,
Original Volume No. 1, Second
Substitute Fifth Revised Sheet No. 380,
to become effective on September 1,
2005.
PNGTS states that copies of this filing
are being served on all jurisdictional
customers, interested state
commissions, and persons on the
official service list in this proceeding.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
On October 29, 2003, Public Utilities
District No. 2 of Grant County,
Washington, licensee for the Project No.
2114, filed an application for a new or
subsequent license pursuant to the
Federal Power Act (FPA) and the
Commission’s regulations. Project No.
2114 is located on the Columbia River,
in Grant, Yakima, Kittitas, Douglas,
Benton, and Chelan Counties,
Washington.
The license for Project No. 2114 was
issued for a period ending October 31,
2005. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year to year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2114
is issued to Public Utilities District No.
2 of Grant County, Washington for a
period effective November 1, 2005
through October 31, 2006, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before October 1,
2006, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under Section 15(a)(1) of the
Magalie R. Salas,
Secretary.
[FR Doc. E5–6225 Filed 11–9–05; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
19:02 Nov 09, 2005
Jkt 208001
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Public Utilities District No. 2 of
Grant County, Washington is authorized
to continue operation of the Priest
Rapids Project No. 2114 until such time
as the Commission acts on its
application for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6189 Filed 11–9–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2145–060–WA]
Public Utility District No. 1 of Chelan
County; Notice of Designation of
Certain Commission Personnel As
Non-Decisional
November 3, 2005.
Commission staff members Vince
Yearick (Office of Energy Projects;
vince.yearick@ferc.gov, 202–502–6174)
and Elizabeth Molloy (Office of the
General Counsel,
elizabeth.molly@ferc.gov, 202–502–
8771) are assigned to help resolve
environmental and other issues
associated with the development of a
comprehensive settlement agreement for
the Rocky Reach Project.
As non-decisional staff, Mr. Yearick
and Ms. Molloy will not participate in
an advisory capacity in the
Commission’s review of any offer of
settlement or settlement agreement, or
deliberations concerning the disposition
of the relicense application.
Different Commission advisory staff
will be assigned to review any offer of
settlement or settlement agreement, and
process the relicense application,
including providing advice to the
Commission with respect to the
agreement and application.
Non-decisional staff and advisory staff
will be prohibited from communicating
with one another concerning any filed
settlement and relicense application for
the project.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6203 Filed 11–9–05; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\10NON1.SGM
10NON1
Agencies
[Federal Register Volume 70, Number 217 (Thursday, November 10, 2005)]
[Notices]
[Page 68428]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6225]
[[Page 68428]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-671-002]
Portland Natural Gas Transmission System; Notice of Compliance
Filing
November 4, 2005.
Take notice that on October 31, 2005, Portland Natural Gas
Transmission System (PNGTS) tendered for filing to become part of its
FERC Gas Tariff, Original Volume No. 1, Second Substitute Fifth Revised
Sheet No. 380, to become effective on September 1, 2005.
PNGTS states that copies of this filing are being served on all
jurisdictional customers, interested state commissions, and persons on
the official service list in this proceeding.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed in accordance with the provisions of section 154.210 of
the Commission's regulations (18 CFR 154.210). Anyone filing a protest
must serve a copy of that document on all the parties to the
proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-6225 Filed 11-9-05; 8:45 am]
BILLING CODE 6717-01-P