Take notice that on October 24, 2005,
Dominion Transmission, Inc.,
(Dominion), 120 Tredegar Street,
Richmond, Virginia 23219, filed with
the Commission an application,
pursuant to section 7(b) of the Natural
Gas Act, for authorization to reclassify
from jurisdictional transmission to
gathering, exempt from the
Commission’s jurisdiction under section
1(b) of the NGA: (1) Approximately two
500 horsepower compressor units at its
Hastings compressor station; and (2) 218
feet of 12-inch diameter pipe on Line H–
1 and five feet of 12-inch diameter pipe
on Line H–10, all in Wetzel County,
West Virginia, as more fully set forth in
the application which is open to public
inspection. This filing may be also
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERCOnline
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions regarding this
application should be directed to
Margaret H. Peters, Senior Counsel,
Dominion Resources Services, Inc., 120
Tredegar Street, Richmond, Virginia
23219, or via telephone at (804) 819–
2277, facsimile number (804) 819–2183,
and e-mail:
margaret_h_peters@dom.com.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
VerDate Aug<31>2005
22:35 Nov 03, 2005
Jkt 208001
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions via the Internet in lieu
of paper. See, 18 CFR 385.2001(a) (1)
(iii) and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Comment Date: November 17, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6113 Filed 11–3–05; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. RM05–4–000 and RM05–4–
001]
Interconnection for Wind Energy;
Notice Extending Compliance Date
October 28, 2005.
On June 2, 2005, the Commission
issued its Final Rule in these
proceedings. Interconnection for Wind
Energy, Order No. 661, 70 FR 34993
(June 16, 2005), FERC Stats. & Regs.
¶ 31,186 (2005) (Final Rule). By order
dated August 5, 2005, the Commission
extended to November 14, 2005 the date
by which public utilities that own,
control, or operate transmission
facilities in interstate commerce are to
adopt the Final Rule Appendix G as
amendments to the Large Generator
Interconnection Procedures and Large
Generator Interconnection Agreements
in their Open Access Transmission
Tariffs.
By this notice, the Commission
hereby extends to December 30, 2005
the date by which public utilities that
own, control, or operate transmission
facilities in interstate commerce are to
adopt the Final Rule Appendix G as
amendments to the Large Generator
Interconnection Procedures and Large
Generator Interconnection Agreements
in their Open Access Transmission
Tariffs.
Magalie R. Salas,
Secretary.
[FR Doc. E5–6112 Filed 11–3–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EC06–16–000, et al.]
San Diego Gas & Electric Company, et
al.; Electric Rate and Corporate Filings
October 27, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. San Diego Gas & Electric Company
and Palomar Energy, LLC
[Docket No. EC06–16–000]
Take notice that on October 25, 2005,
San Diego Gas & Electric Company
(SDG&E) and Palomar Energy, LLC
(Palomar) (collectively, Applicants)
filed with the Commission a joint
E:\FR\FM\04NON1.SGM
04NON1
Agencies
[Federal Register Volume 70, Number 213 (Friday, November 4, 2005)]
[Notices]
[Page 67156]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6112]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. RM05-4-000 and RM05-4-001]
Interconnection for Wind Energy; Notice Extending Compliance Date
October 28, 2005.
On June 2, 2005, the Commission issued its Final Rule in these
proceedings. Interconnection for Wind Energy, Order No. 661, 70 FR
34993 (June 16, 2005), FERC Stats. & Regs. ] 31,186 (2005) (Final
Rule). By order dated August 5, 2005, the Commission extended to
November 14, 2005 the date by which public utilities that own, control,
or operate transmission facilities in interstate commerce are to adopt
the Final Rule Appendix G as amendments to the Large Generator
Interconnection Procedures and Large Generator Interconnection
Agreements in their Open Access Transmission Tariffs.
By this notice, the Commission hereby extends to December 30, 2005
the date by which public utilities that own, control, or operate
transmission facilities in interstate commerce are to adopt the Final
Rule Appendix G as amendments to the Large Generator Interconnection
Procedures and Large Generator Interconnection Agreements in their Open
Access Transmission Tariffs.
Magalie R. Salas,