Environmental Impacts Statements; Notice of Availability, 67166 [05-22040]
Download as PDF
67166
Federal Register / Vol. 70, No. 213 / Friday, November 4, 2005 / Notices
Summary: EPA continues to express
concerns about potential impacts to
water quality. EPA stressed the
importance of designing and
implementing fuels reduction
treatments and road access in a manner
that minimizes impacts. EPA also
recommended modification of
mitigation measures to further assure
protection for large old growth
Ponderosa pine trees.
Dated: November 1, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–22041 Filed 11–3–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6668–09]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed October 24, 2005 Through October
28, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050450, Draft EIS, SFW, IL,
Crab Orchard National Wildlife
Refuge Comprehensive Conservation
Plan (CCP), Implementation,
Williamson, Jackson and Unicon
Counties, IL, Comment Period Ends:
January 17, 2006, Contact: Dan Frisk
618–997–3344.
EIS No. 20050451, Final EIS, AFS, WA,
Fish Passage and Aquatic Habitat
Restoration at Hemlock Dam,
Implementation, Gifford Pinchot
National Forest, Mount Adams
District, Skamaria County, WA, Wait
Period Ends: December 5, 2005,
Contact: Benet Coffin 509–395–3425.
EIS No. 20050452, Draft EIS, BLM, NM,
Kasha-Katuwe Tent Rocks National
Monument Resource Management
Plan, Implementation, Rio Puerco
Field Office, Sandoval County, NM,
Comment Period Ends: February 2,
2006, Contact: John Bristol 505–761–
8755.
EIS No. 20050453, Draft EIS, AFS, ID,
South Fork Salmon River Subbasin
Noxious and Invasive Weed
Management Program,
Implementation, Krassel and McCall
Ranger Districts, Payette National
Forest and Cascade Ranger District,
Valley and Idaho Counties, ID,
Comment Period Ends: December 20,
VerDate Aug<31>2005
22:35 Nov 03, 2005
Jkt 208001
2005, Contact: Ana Egnew 208–634–
0624.
EIS No. 20050454, Final EIS, FRC, 00,
Cove Point Expansion Project,
Construction and Operation of a
Liquefied Natural Gas (LNG) Import
Terminal Expansion and Natural Gas
Pipeline Facilities, US. Army COE
Section 404 Permit, Docket Nos.
CPO5–130–000, CP05–131–000 and
CP05–132–00, PA, VA, WV, NY and
MD, Wait Period Ends: December 21,
2005, Contact: Thomas Russo 1–866–
208–3372.
EIS No. 20050455, Final EIS, AFS, IN,
German Ridge Restoration Project, To
Restore Native Hardwood
Communities, Implementation,
Hoosier National Forest, Tell City
Ranger District, Perry County, IN,
Wait Period Ends: December 5, 2005,
Contact: Ron Ellis 812–275–5987.
EIS No. 20050456, Final EIS, FHW, 00,
US 24 Transportation Improvements
Project, I–469 in New Haven, Indiana
to Ohio Route15 in Defiance,
Funding, NPDES Permit and U.S.
Army COE Section 404 Permit
Issuance, Westenmost and Allen
Counties, IN and Paulding and
Defiance Counties, OH, Wait Period
Ends: December 5, 2005, Contact:
Mark Vonder Embse 614–280–6854.
Amended Notices
EIS No. 20050437, Final EIS, AFS, NM,
Tajique Watershed Restoration
Project, Proposes Fuel Reduction and
Restore Forest Health, Cibola National
Forest, Torrance County, NM, Wait
Period Ends: November 21, 2005,
Contact: Vicky Estrada 505–847–2990.
Revision of FR Notice Published
October 21, 2005: Correction to Title
and Contact Person Name.
EIS No. 20050446, Draft EIS, USN, 00,
Undersea Warfare Training Range
(USWTR), Installation and Operation,
Preferred Site (in the Cherry Point
Operating Area) and the Alternate
Sites (within the Virginia Capes and
Jacksonville Operating Areas), NC, VA
and FL, Comment Period Ends:
December 28, 2005, Contact: Keith
Jenkins 757–322–4046.
Revision of FR Notice Published on
October 28, 2005: Comment Period
Extended from December 12, 2005 to
December 28, 2005.
Dated: November 1, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA
Compliance Division, Office of Federal
Activities.
[FR Doc. 05–22040 Filed 11–3–05; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–7994–2]
Underground Injection Control
Program; Hazardous Waste Injection
Restrictions; Petition for Exemption—
Class I Hazardous Waste Injection;
Lyondell Chemical Company
AGENCY:
Environmental Protection
Agency.
Notice of Final Decision on No
Migration Petition Reissuance.
ACTION:
SUMMARY: Notice is hereby given that an
exemption to the land disposal
restrictions under the 1984 Hazardous
and Solid Waste Amendments to the
Resource Conservation and Recovery
Act has been granted to Lyondell
Industries, Inc. (Lyondell) for two Class
I injection wells located at
Channelview, Texas. As required by 40
CFR Part 148, the company has
adequately demonstrated to the
satisfaction of the Environmental
Protection Agency by the petition and
supporting documentation that, to a
reasonable degree of certainty, there will
be no migration of hazardous
constituents from the injection zone for
as long as the waste remains hazardous.
This final decision allows the continued
underground injection by Lyondell, of
the specific restricted hazardous wastes
identified in the exemption, into Class
I hazardous waste injection wells
WDW–148 and WDW–162, until
December 31, 2020, unless EPA moves
to terminate the exemption under
provisions of 40 CFR 148.24. Additional
conditions included in this final
decision may be reviewed by contacting
the Region 6 Ground Water/UIC Section.
As required by 40 CFR 148.22(b) and
124.10, a public notice was issued
August 18, 2005. The public comment
period closed on October 3, 2005. No
comments were received. This decision
constitutes final Agency action.
This action is effective as of
October 28, 2005.
DATES:
Copies of the petition and
all pertinent information relating thereto
are on file at the following location:
Environmental Protection Agency,
Region 6, Water Quality Protection
Division, Source Water Protection
Branch (6WQ-S), 1445 Ross Avenue,
Dallas, Texas 75202–2733.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Philip Dellinger, Chief Ground Water/
E:\FR\FM\04NON1.SGM
04NON1
Agencies
[Federal Register Volume 70, Number 213 (Friday, November 4, 2005)]
[Notices]
[Page 67166]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-22040]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6668-09]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed October 24, 2005 Through October 28, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050450, Draft EIS, SFW, IL, Crab Orchard National Wildlife
Refuge Comprehensive Conservation Plan (CCP), Implementation,
Williamson, Jackson and Unicon Counties, IL, Comment Period Ends:
January 17, 2006, Contact: Dan Frisk 618-997-3344.
EIS No. 20050451, Final EIS, AFS, WA, Fish Passage and Aquatic Habitat
Restoration at Hemlock Dam, Implementation, Gifford Pinchot National
Forest, Mount Adams District, Skamaria County, WA, Wait Period Ends:
December 5, 2005, Contact: Benet Coffin 509-395-3425.
EIS No. 20050452, Draft EIS, BLM, NM, Kasha-Katuwe Tent Rocks National
Monument Resource Management Plan, Implementation, Rio Puerco Field
Office, Sandoval County, NM, Comment Period Ends: February 2, 2006,
Contact: John Bristol 505-761-8755.
EIS No. 20050453, Draft EIS, AFS, ID, South Fork Salmon River Subbasin
Noxious and Invasive Weed Management Program, Implementation, Krassel
and McCall Ranger Districts, Payette National Forest and Cascade Ranger
District, Valley and Idaho Counties, ID, Comment Period Ends: December
20, 2005, Contact: Ana Egnew 208-634-0624.
EIS No. 20050454, Final EIS, FRC, 00, Cove Point Expansion Project,
Construction and Operation of a Liquefied Natural Gas (LNG) Import
Terminal Expansion and Natural Gas Pipeline Facilities, US. Army COE
Section 404 Permit, Docket Nos. CPO5-130-000, CP05-131-000 and CP05-
132-00, PA, VA, WV, NY and MD, Wait Period Ends: December 21, 2005,
Contact: Thomas Russo 1-866-208-3372.
EIS No. 20050455, Final EIS, AFS, IN, German Ridge Restoration Project,
To Restore Native Hardwood Communities, Implementation, Hoosier
National Forest, Tell City Ranger District, Perry County, IN, Wait
Period Ends: December 5, 2005, Contact: Ron Ellis 812-275-5987.
EIS No. 20050456, Final EIS, FHW, 00, US 24 Transportation Improvements
Project, I-469 in New Haven, Indiana to Ohio Route15 in Defiance,
Funding, NPDES Permit and U.S. Army COE Section 404 Permit Issuance,
Westenmost and Allen Counties, IN and Paulding and Defiance Counties,
OH, Wait Period Ends: December 5, 2005, Contact: Mark Vonder Embse 614-
280-6854.
Amended Notices
EIS No. 20050437, Final EIS, AFS, NM, Tajique Watershed Restoration
Project, Proposes Fuel Reduction and Restore Forest Health, Cibola
National Forest, Torrance County, NM, Wait Period Ends: November 21,
2005, Contact: Vicky Estrada 505-847-2990.
Revision of FR Notice Published October 21, 2005: Correction to
Title and Contact Person Name.
EIS No. 20050446, Draft EIS, USN, 00, Undersea Warfare Training Range
(USWTR), Installation and Operation, Preferred Site (in the Cherry
Point Operating Area) and the Alternate Sites (within the Virginia
Capes and Jacksonville Operating Areas), NC, VA and FL, Comment Period
Ends: December 28, 2005, Contact: Keith Jenkins 757-322-4046.
Revision of FR Notice Published on October 28, 2005: Comment Period
Extended from December 12, 2005 to December 28, 2005.
Dated: November 1, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05-22040 Filed 11-3-05; 8:45 am]
BILLING CODE 6560-50-P