Environmental Impacts Statements; Notice of Availability, 67166 [05-22040]

Download as PDF 67166 Federal Register / Vol. 70, No. 213 / Friday, November 4, 2005 / Notices Summary: EPA continues to express concerns about potential impacts to water quality. EPA stressed the importance of designing and implementing fuels reduction treatments and road access in a manner that minimizes impacts. EPA also recommended modification of mitigation measures to further assure protection for large old growth Ponderosa pine trees. Dated: November 1, 2005. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 05–22041 Filed 11–3–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6668–09] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed October 24, 2005 Through October 28, 2005 Pursuant to 40 CFR 1506.9. EIS No. 20050450, Draft EIS, SFW, IL, Crab Orchard National Wildlife Refuge Comprehensive Conservation Plan (CCP), Implementation, Williamson, Jackson and Unicon Counties, IL, Comment Period Ends: January 17, 2006, Contact: Dan Frisk 618–997–3344. EIS No. 20050451, Final EIS, AFS, WA, Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamaria County, WA, Wait Period Ends: December 5, 2005, Contact: Benet Coffin 509–395–3425. EIS No. 20050452, Draft EIS, BLM, NM, Kasha-Katuwe Tent Rocks National Monument Resource Management Plan, Implementation, Rio Puerco Field Office, Sandoval County, NM, Comment Period Ends: February 2, 2006, Contact: John Bristol 505–761– 8755. EIS No. 20050453, Draft EIS, AFS, ID, South Fork Salmon River Subbasin Noxious and Invasive Weed Management Program, Implementation, Krassel and McCall Ranger Districts, Payette National Forest and Cascade Ranger District, Valley and Idaho Counties, ID, Comment Period Ends: December 20, VerDate Aug<31>2005 22:35 Nov 03, 2005 Jkt 208001 2005, Contact: Ana Egnew 208–634– 0624. EIS No. 20050454, Final EIS, FRC, 00, Cove Point Expansion Project, Construction and Operation of a Liquefied Natural Gas (LNG) Import Terminal Expansion and Natural Gas Pipeline Facilities, US. Army COE Section 404 Permit, Docket Nos. CPO5–130–000, CP05–131–000 and CP05–132–00, PA, VA, WV, NY and MD, Wait Period Ends: December 21, 2005, Contact: Thomas Russo 1–866– 208–3372. EIS No. 20050455, Final EIS, AFS, IN, German Ridge Restoration Project, To Restore Native Hardwood Communities, Implementation, Hoosier National Forest, Tell City Ranger District, Perry County, IN, Wait Period Ends: December 5, 2005, Contact: Ron Ellis 812–275–5987. EIS No. 20050456, Final EIS, FHW, 00, US 24 Transportation Improvements Project, I–469 in New Haven, Indiana to Ohio Route15 in Defiance, Funding, NPDES Permit and U.S. Army COE Section 404 Permit Issuance, Westenmost and Allen Counties, IN and Paulding and Defiance Counties, OH, Wait Period Ends: December 5, 2005, Contact: Mark Vonder Embse 614–280–6854. Amended Notices EIS No. 20050437, Final EIS, AFS, NM, Tajique Watershed Restoration Project, Proposes Fuel Reduction and Restore Forest Health, Cibola National Forest, Torrance County, NM, Wait Period Ends: November 21, 2005, Contact: Vicky Estrada 505–847–2990. Revision of FR Notice Published October 21, 2005: Correction to Title and Contact Person Name. EIS No. 20050446, Draft EIS, USN, 00, Undersea Warfare Training Range (USWTR), Installation and Operation, Preferred Site (in the Cherry Point Operating Area) and the Alternate Sites (within the Virginia Capes and Jacksonville Operating Areas), NC, VA and FL, Comment Period Ends: December 28, 2005, Contact: Keith Jenkins 757–322–4046. Revision of FR Notice Published on October 28, 2005: Comment Period Extended from December 12, 2005 to December 28, 2005. Dated: November 1, 2005. Ken Mittelholtz, Environmental Protection Specialist, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–22040 Filed 11–3–05; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [FRL–7994–2] Underground Injection Control Program; Hazardous Waste Injection Restrictions; Petition for Exemption— Class I Hazardous Waste Injection; Lyondell Chemical Company AGENCY: Environmental Protection Agency. Notice of Final Decision on No Migration Petition Reissuance. ACTION: SUMMARY: Notice is hereby given that an exemption to the land disposal restrictions under the 1984 Hazardous and Solid Waste Amendments to the Resource Conservation and Recovery Act has been granted to Lyondell Industries, Inc. (Lyondell) for two Class I injection wells located at Channelview, Texas. As required by 40 CFR Part 148, the company has adequately demonstrated to the satisfaction of the Environmental Protection Agency by the petition and supporting documentation that, to a reasonable degree of certainty, there will be no migration of hazardous constituents from the injection zone for as long as the waste remains hazardous. This final decision allows the continued underground injection by Lyondell, of the specific restricted hazardous wastes identified in the exemption, into Class I hazardous waste injection wells WDW–148 and WDW–162, until December 31, 2020, unless EPA moves to terminate the exemption under provisions of 40 CFR 148.24. Additional conditions included in this final decision may be reviewed by contacting the Region 6 Ground Water/UIC Section. As required by 40 CFR 148.22(b) and 124.10, a public notice was issued August 18, 2005. The public comment period closed on October 3, 2005. No comments were received. This decision constitutes final Agency action. This action is effective as of October 28, 2005. DATES: Copies of the petition and all pertinent information relating thereto are on file at the following location: Environmental Protection Agency, Region 6, Water Quality Protection Division, Source Water Protection Branch (6WQ-S), 1445 Ross Avenue, Dallas, Texas 75202–2733. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Philip Dellinger, Chief Ground Water/ E:\FR\FM\04NON1.SGM 04NON1

Agencies

[Federal Register Volume 70, Number 213 (Friday, November 4, 2005)]
[Notices]
[Page 67166]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-22040]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6668-09]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed October 24, 2005 Through October 28, 2005
Pursuant to 40 CFR 1506.9.

EIS No. 20050450, Draft EIS, SFW, IL, Crab Orchard National Wildlife 
Refuge Comprehensive Conservation Plan (CCP), Implementation, 
Williamson, Jackson and Unicon Counties, IL, Comment Period Ends: 
January 17, 2006, Contact: Dan Frisk 618-997-3344.
EIS No. 20050451, Final EIS, AFS, WA, Fish Passage and Aquatic Habitat 
Restoration at Hemlock Dam, Implementation, Gifford Pinchot National 
Forest, Mount Adams District, Skamaria County, WA, Wait Period Ends: 
December 5, 2005, Contact: Benet Coffin 509-395-3425.
EIS No. 20050452, Draft EIS, BLM, NM, Kasha-Katuwe Tent Rocks National 
Monument Resource Management Plan, Implementation, Rio Puerco Field 
Office, Sandoval County, NM, Comment Period Ends: February 2, 2006, 
Contact: John Bristol 505-761-8755.
EIS No. 20050453, Draft EIS, AFS, ID, South Fork Salmon River Subbasin 
Noxious and Invasive Weed Management Program, Implementation, Krassel 
and McCall Ranger Districts, Payette National Forest and Cascade Ranger 
District, Valley and Idaho Counties, ID, Comment Period Ends: December 
20, 2005, Contact: Ana Egnew 208-634-0624.
EIS No. 20050454, Final EIS, FRC, 00, Cove Point Expansion Project, 
Construction and Operation of a Liquefied Natural Gas (LNG) Import 
Terminal Expansion and Natural Gas Pipeline Facilities, US. Army COE 
Section 404 Permit, Docket Nos. CPO5-130-000, CP05-131-000 and CP05-
132-00, PA, VA, WV, NY and MD, Wait Period Ends: December 21, 2005, 
Contact: Thomas Russo 1-866-208-3372.
EIS No. 20050455, Final EIS, AFS, IN, German Ridge Restoration Project, 
To Restore Native Hardwood Communities, Implementation, Hoosier 
National Forest, Tell City Ranger District, Perry County, IN, Wait 
Period Ends: December 5, 2005, Contact: Ron Ellis 812-275-5987.
EIS No. 20050456, Final EIS, FHW, 00, US 24 Transportation Improvements 
Project, I-469 in New Haven, Indiana to Ohio Route15 in Defiance, 
Funding, NPDES Permit and U.S. Army COE Section 404 Permit Issuance, 
Westenmost and Allen Counties, IN and Paulding and Defiance Counties, 
OH, Wait Period Ends: December 5, 2005, Contact: Mark Vonder Embse 614-
280-6854.

Amended Notices

EIS No. 20050437, Final EIS, AFS, NM, Tajique Watershed Restoration 
Project, Proposes Fuel Reduction and Restore Forest Health, Cibola 
National Forest, Torrance County, NM, Wait Period Ends: November 21, 
2005, Contact: Vicky Estrada 505-847-2990.

    Revision of FR Notice Published October 21, 2005: Correction to 
Title and Contact Person Name.

EIS No. 20050446, Draft EIS, USN, 00, Undersea Warfare Training Range 
(USWTR), Installation and Operation, Preferred Site (in the Cherry 
Point Operating Area) and the Alternate Sites (within the Virginia 
Capes and Jacksonville Operating Areas), NC, VA and FL, Comment Period 
Ends: December 28, 2005, Contact: Keith Jenkins 757-322-4046.

    Revision of FR Notice Published on October 28, 2005: Comment Period 
Extended from December 12, 2005 to December 28, 2005.

    Dated: November 1, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office 
of Federal Activities.
[FR Doc. 05-22040 Filed 11-3-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.