Download as PDF 66830 Federal Register / Vol. 70, No. 212 / Thursday, November 3, 2005 / Notices FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 15, 2005. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL06–12–000] American Municipal Power-Ohio, Inc., Complainant, v. PJM Interconnection, L.L.C., Respondent; Notice of Complaint Magalie R. Salas, Secretary. [FR Doc. E5–6068 Filed 11–2–05; 8:45 am] BILLING CODE 6717–01–P October 27, 2005. Take notice that on October 26, 2005, American Municipal Power-Ohio, Inc. (AMP-Ohio) pursuant to sections 206 and 306 of the Federal Power Act and Rule 206 of the Commission’s Rules of Practice and Procedures, tendered for filing a complaint against PJM Interconnection, L.L.C. (PJM) on behalf of twelve of AMP-Ohio’s member municipal utilities. AMP-Ohio requests that the Commission enforce the Amended and Restated Operating Agreement of PJM and the PJM West Reliability Assurance Agreement and require PJM to recognize and honor the transfer Unforced Capacity Credits from Dayton Power & Light Company to AMP-Ohio. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail VerDate Aug<31>2005 18:27 Nov 02, 2005 Jkt 208001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 October 26, 2005. Take notice that the Commission received the following electric rate filings. Docket Numbers: ER01–3117–004. Applicants: Wellhead Power Panoche, LLC. Description: Wellhead Power Panoche, LLC submits Second Revised Sheet No.1 et al to FERC Electric Tariff, Original Volume No. 1, to the amended market-base rate tariff and request an effective date of 10/21/05. Filed Date: 10/20/2005. Accession Number: 20051024–0232. Comment Date: 5 p.m. Eastern Time on Thursday, November 10, 2005. Docket Numbers: ER01–3118–004. Applicants: Wellhead Power Gates, LLC. Description: Wellhead Power Gates, LLC submits Second Revised Sheet No. 1 et al to FERC Electric tariff, Original Volume No. 1 to the amended marketbased rate tariff and requests an effective date of 10/21/05. Filed Date: 10/20/2005. Accession Number: 20051024–0231. Comment Date: 5 p.m. Eastern Time on Thursday, November 10, 2005. Docket Numbers: ER01–388–004. Applicants: WFEC Genco, L.L.C. Description: WFEC GENCO, LLC submits Substitute First Revised Sheet No. 1, Substitute Original Sheet No. 6 and Substitute Original Sheet No. 7 to FERC Electric Tariff, First Revised Volume No. 1, pursuant to FERC’s 10/ 17/05 Order. Filed Date: 10/20/2005. Accession Number: 20051024–0240. Comment Date: 5 p.m. Eastern Time on Thursday, November 10, 2005. Docket Numbers: ER01–642–004; ER01–1335–006; ER01–1011–008. Applicants: Cottonwood Energy Company LP; Magnolia Energy LP; Redbud Energy LP. Description: Cottonwood Energy Company LP, Magnolia Energy LP, and PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 Redbud Energy LP notifies FERC that certain changes in the characteristics relied upon to grant market-based rate authority to the project. Filed Date: 10/20/2005. Accession Number: 20051024–0238. Comment Date: 5 p.m. Eastern Time on Thursday, November 10, 2005. Docket Numbers: ER03–1079–006; EL05–83–001. Applicants: Aquila, Inc. Description: Aquila, Inc on behalf of itself and Aquila Networks-MPS et al submits Substitute First Revised Sheet No. 2 et al to FERC Electric Tariff, Original Volume No. 30, Third Revised Volume No. 28, in compliance with FERC’s 9/19/05 Order. Filed Date: 10/19/2005. Accession Number: 20051020–0271. Comment Date: 5 p.m. Eastern Time on Wednesday, November 9, 2005. Docket Numbers: ER05–1258–001. Applicants: Interstate Power and Light Company. Description: Interstate Power & Light Co & Midwest Independent Transmission System Operator, Inc submit revised Large Generator Interconnection Agreement relating to the Duane Arnold Energy Center. Filed Date: 10/18/2005. Accession Number: 20051020–0283. Comment Date: 5 p.m. Eastern Time on Wednesday, November 2, 2005. Docket Numbers: ER05–1485–001. Applicants: Alcoa Power Generating Inc. Description: Alcoa Power Generating Inc submits substitute tariff sheet in Attachment C to the open access transmission tariff of their Yadkin Division. Filed Date: 10/20/2005. Accession Number: 20051024–0239. Comment Date: 5 p.m. Eastern Time on Thursday, November 10, 2005. Docket Numbers: ER05–428–005. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc proposes to amend the first full paragraph on Revised Sheet No. 157 Services Tariff to comply with FERC’s 4/21/05 Order. Filed Date: 10/18/2005. Accession Number: 20051019–0263. Comment Date: 5 p.m. Eastern Time on Tuesday, November 8, 2005. Docket Numbers: ER05–652–004; RT04–1–016; ER04–48–016; ER05–109– 003. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc submits a compliance filing revising and clarifying various portions of its Open Access Transmission Tariff. E:\FR\FM\03NON1.SGM 03NON1

Agencies

[Federal Register Volume 70, Number 212 (Thursday, November 3, 2005)]
[Notices]
[Page 66830]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-6068]



[[Page 66830]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL06-12-000]


American Municipal Power-Ohio, Inc., Complainant, v. PJM 
Interconnection, L.L.C., Respondent; Notice of Complaint

October 27, 2005.
    Take notice that on October 26, 2005, American Municipal Power-
Ohio, Inc. (AMP-Ohio) pursuant to sections 206 and 306 of the Federal 
Power Act and Rule 206 of the Commission's Rules of Practice and 
Procedures, tendered for filing a complaint against PJM 
Interconnection, L.L.C. (PJM) on behalf of twelve of AMP-Ohio's member 
municipal utilities. AMP-Ohio requests that the Commission enforce the 
Amended and Restated Operating Agreement of PJM and the PJM West 
Reliability Assurance Agreement and require PJM to recognize and honor 
the transfer Unforced Capacity Credits from Dayton Power & Light 
Company to AMP-Ohio.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on November 15, 2005.

Magalie R. Salas,
Secretary.