Environmental Impact Statements and Regulations; Availability of EPA Comments, 62106-62107 [05-21545]
Download as PDF
62106
Federal Register / Vol. 70, No. 208 / Friday, October 28, 2005 / Notices
and an update on the work of the
National Center for Education Statistics
(NCES).
From 9:30 a.m. to 12 p.m. on
November 18, the Board’s standing
committees—the Assessment
Development Committee; the Committee
on Standards, Design, and Methodology;
and the Reporting and Dissemination
Committees—will meet in open session.
The full Board will meet in closed
session on November 18 from 12 p.m. to
2 p.m. The Board will receive a briefing
from the Associate Commissioner of the
National Center for Education Statistics
on NAEP participation by various states
affected by hurricanes Katrina and Rita,
and these questions about participation
will have a direct impact on cost
estimates for NCES contracts. The
meeting must therefore be conducted in
closed session as disclosure of
independent cost estimates for NCES
contracts would significantly impede
implementation of the NAEP contract
activities, and is therefore protected by
exemption 9(B) of section 552b(c) of
Title 5 U.S.C.
On November 18, the full Board will
meet in open session from 2:15 p.m. to
4:30 p.m. At 2:15 p.m., Raymond
Simon, U.S. Deputy Secretary of
Education, will administer the Oath of
Office to a new Board member. From
2:30 p.m. to 4 p.m. Board members will
receive an update and take action on the
NAEF 2009 Science Framework project.
At 4 p.m. an ethics briefing will be
provided to Board members by a staff
member from the Office of General
Counsel. The November 18 session of
the Board meeting will conclude at 4:30
p.m.
On November 19, the Nominations
Committee will meet from 7:45 p.m. to
8:45 p.m. in open session. The full
Board will convene in open session
from 9 a.m. to 12 p.m. At 9 a.m., the
Board will receive a briefing on the
newly formed U.S. Department of
Education Higher Education
Commission and the relationship of the
Commission’s work with the Board’s
work on high school assessment. Board
actions on policies and Committee
reports are scheduled to take place
between 10:15 a.m. and 12 p.m., upon
which the November 19, 2005 session of
the Board meeting will adjourn.
Detailed minutes of the meeting,
including summaries of the activities of
the closed sessions and related matters
that are informative to the public and
consistent with the policy of section 5
U.S.C. 552b(c) will be available to the
public within 14 days of the meeting.
Records are kept of all Board
proceedings and are available for public
inspection at the U.S. Department of
VerDate Aug<31>2005
18:15 Oct 27, 2005
Jkt 208001
Education, National Assessment
Governing Board, Suite #825, 800 North
Capitol Street, NW., Washington, DC,
from 9 a.m. to 5 p.m. Eastern Standard
Time.
Dated: October 24, 2005.
Charles E. Smith,
Executive Director, National Assessment
Governing Board.
[FR Doc. 05–21495 Filed 10–27–05; 8:45 am]
BILLING CODE 4000–01–M
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6668–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050216, ERP No. D–IBR–
K65285–CA, San Luis Drainage
Feature Re-evaluation Project, Provide
Agricultural Drainage Service to the
San Luis Unit, Several Counties, CA.
Summary: EPA has concerns about
the In-Valley Disposal Alternatives
because of uncertainties about
treatments to remove selenium from
drainage water, the lack of information
on contaminant profile and disposal of
biotreatment and reverse osmosis brine,
and potential environmental effects of
evaporation ponds and reuse areas. EPA
has environmental objections to the San
Francisco Delta and Pacific Ocean
Disposal Alternatives because of
potential adverse effects to the Delta,
Estero Bay, and drinking water supply.
Rating EO2.
EIS No. 20050222, ERP No. D–FAA–
K51042–AZ, Phoenix Sky Harbor
International Airport (PHX),
Construction and Operation of a
Terminal, Airfield and Surface
Transportation, City of Phoenix,
Maricopa County, AZ.
Summary: EPA expressed
environmental concerns about
documentation of alternatives that were
eliminated and recommended
additional mitigation measures for air
quality. Rating EC2.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
EIS No. 20050293, ERP No. D–WPA–
K08030–AZ, Wellton-Mohawk
Generating Facility Project,
Construction and Operation a Natural
Gas-Fired, Combined-Cycle, Electric
Generating Stations, Approval for
Right-of-Way, Yuma County, AZ.
Summary: EPA expressed
environmental concerns about potential
impacts to water quality, wildlife, and
traditional cultural properties, and
recommended a (1) commitment to
specific additional mitigation measures
described in the DEIS, (2) selection of
pipeline route Option 2, and (3)
construction of the double-circuit
Ligurta-to-Dome Tap Transmission Line.
EPA also requested additional
information on air emissions, the
regional natural gas pipelines, exhaust
stack height variance, and need for local
energy generation. Rating EC2.
EIS No. 20050318, ERP No. D–BIA–
F65058–MI, Nottawaseppi Huron
Band of Potawatomi Indians (the
Tribe), Proposes Fee-to-Trust Transfer
and Casino Project, Calhoun County,
MI.
Summary: EPA expressed
environmental concerns about potential
impacts to waterbodies and traffic
safety, and requested additional
information on conservation measures.
Rating EC2.
EIS No. 20050350, ERP No. D–COE–
K30022–CA, Encinitas/Solana Beach
Shoreline Protection Project, To
Protect Public Safety and Reduce
Storm-Related Damages to Coastal
Structures, Cities of Encinitas and
Solana Beach, San Diego County, CA.
Summary: EPA expressed
environmental concerns about the
project’s impacts to water resources,
endangered species, and air quality, and
requested specific information regarding
modeling and post-project monitoring
for impacts to these resources. Rating
EC2.
EIS No. 20050390, ERP No. D–NPS–
H65026–IA, Hoover Creek Stream
Management Plan, Implementation,
Herbert Hoover National Historic Site,
IA
Summary: EPA has no objections to
the proposed project. Rating LO.
Final EISs
EIS No. 20050263, ERP No. F–AFS–
K65280–CA, Power Fire Restoration
Project, To Reduce Long-Term Fuel
Loading for the Purpose of Reducing
Future Severity and Resistance to
Control, Amador Ranger District,
Eldorado National Forest, Amado
County, CA.
Summary: EPA continues to have
concerns about ground disturbing
E:\FR\FM\28OCN1.SGM
28OCN1
Federal Register / Vol. 70, No. 208 / Friday, October 28, 2005 / Notices
logging methods in high risk
watersheds, and recommends greater
use of helicopter or skyline logging
systems in order to minimize potential
impacts to water resources.
EPA also recommend utilizing the
results of water quality monitoring
performed by other agencies in
evaluating the environmental benefits of
the final project design.
EIS No. 20050269, ERP No. F–AFS–
K65279–CA, Freds Fire Restoration
Project, To Reduce Long-Term Fuel
Loading for the Purpose of Reducing
Future Fire Severity and Resistance to
Control, Eldorado National Forest, El
Dorado County, CA
Summary: EPA has no objections to
the project as described in the FEIS.
EIS No. 20050272, ERP No. F–NRS–
L39060–OR, Williamson River Delta
Restoration Project, To Restore and
Maintain the Ecological Functions of
the Delta, Williamson River, Klamath
County, OR.
Summary: No comment letter was
sent to the preparing agency.
EIS No. 20050364, ERP No. F–FHW–
H40183–00, Council Bluffs Interstate
System Improvements Project,
Transportation Improvements,
Missouri River on I–80 to east of I–
480 Interchange, Tier 1,
Pottawattamie County, IA and
Douglas County, NE.
Summary: EPA has no objections to
the proposed project.
EIS No. 20050372, ERP No. F–AFS–
K65282–AZ, Pickett Lake and Padre
Canyon Allotments Cattle Grazing
Management, Authorization and
Implementation, Coconino National
Forest, Mormon Lake Ranger District,
Coconino County, AZ.
Summary: EPA continues to have
environmental concerns about the
impacts of grazing on impaired meadow
and grassland soils, and the sufficiency
of wetlands vegetation protection
necessary for successful pronghorn
fawning.
EIS No. 20050402, ERP No. F–FHW–
J40163–UT, Iron County
Transportation Corridors,
Construction from Station Road 56 to
Exit 51 on Interstate 15, Funding and
Right-of-Way Grant, Southwest of the
Cedar City Limits, Iron County, UT.
Summary: EPA has no objections to
the proposed project.
Dated: October 25, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–21545 Filed 10–27–05; 8:45 am]
BILLING CODE 6560–50–P
VerDate Aug<31>2005
18:15 Oct 27, 2005
Jkt 208001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6668–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed October 17, 2005 Through October
21, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050439, Final EIS, COE, MS,
Enhanced Evaluation of Cumulative
Effects Associated with U.S. Army
Corps of Engineers Permitting
Activity for Large-Scale Development
in Coastal Mississippi, Hancock,
Harrison, Jackson, and Mississippi
Counties, MS, Wait Period Ends: 12/
27/2005, Contact: Dr. Susan I. Rees
251–694–4141.
EIS No. 20050440, Final EIS, SFW, AK,
Alaska Peninsula and Becharof
National Wildlife Refuges, Revised
Comprehensive Conservation Plan,
Implementation, AK, Wait Period
Ends: 11/28/2005, Contact: Peter
Wikoff 907–786–3837.
EIS No. 20050441, Draft EIS, COE, AK,
Delong Mountain Terminal Project,
Proposed Construction and Operation
of Navigation Improvements,
Northwest Arctic Borough, AK,
Comment Period Ends: 12/27/2005,
Contact: Guy McConnell 907–753–
2614.
EIS No. 20050442, Draft EIS, NOA, WV,
Canaan Valley Institute Office
Complex, Proposes to Construct:
Offices, Classrooms, Laboratories,
250-Seat Auditorium, Parking
Facilities, Outdoor Classrooms and
Interpretive Areas, U.S. Army COE
Section 404 Permit, Southeast of the
Towns of Davis and Thomas, Tucker
County, WV, Comment Period Ends:
12/12/2005, Contact: Dr. Bruce B.
Hicks 301–713–3318.
EIS No. 20050443, Final EIS, FHW, 00,
US–159 Missouri River Crossing
Project, Rehabilitation or Replacement
of the Missouri River Bridge at Rulo,
Funding and U.S. Army COE Section
404 Permit, Richardson County, NE
and Holt County, MO, Wait Period
Ends: 11/28/2005, Contact: Ed Kosola
402–437–5973.
EIS No. 20050444, Final Supplement,
FTA, VA, Norfolk Light Rail Transit
System, from the western terminus
near Eastern Virginia Medical Center
through Downtown Norfolk to an
eastern terminus at Newtown Road
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
62107
and Kempsville Road, Funding, U.S.
COE Section 404 Permit, USCGD
Bridge Permit, City of Norfolk, VA,
Wait Period Ends: 11/28/2005
Contact: Patricia Kampf 215–656–
7100.
EIS No. 20050445, Draft EIS, NPS, SD,
Badlands National Park/North Unit
General Management Plan,
Implementation, Jackson, Pennington
and Shananon Counties, SD,
Comment Period Ends: 12/27/2005,
Contact: William Supernaugh 605–
433–5281.
EIS No. 20050446, Draft EIS, USN, 00,
Undersea Warfare Training Range
(USWTR), Installation and Operation,
Preferred Site (in the Cherry Point
Operating Area) and the Alternate
Sites ( within the Virginia Capes and
Jacksonville Operating Areas), NC, VA
and FL, Comment Period Ends: 12/12/
2005, Contact: Keith Jenkins 757–
322–4046.
EIS No. 20050447, Final EIS, FHW, OH,
Eastern Corridor Multi-Modal (Tier 1)
Project, to Implement a Multi-Modal
Transportation Program between the
City of Cincinnati and Eastern
Suburbs in Hamilton and Clermont
Counties, OH, Wait Period Ends: 11/
28/2005, Contact: Dennis A. Decker
614–280–6896.
EIS No. 20050448, Draft EIS, BLM, MT,
Upper Missouri River Breaks National
Monument Resource Management
Plan, Implementation, Blaine,
Chouteau, Fergus and Phillips
Counties, MT, Comment Period Ends:
01/26/2005, Contact: Jerry Majerus
406–538–1924.
EIS No. 20050449, Final EIS, USN, FL,
Navy Air-To-Ground Training at Avon
Park Air Force Range, To Conduct
Air-To-Ground Ordnance Delivery
and Training, Fleet Forces
Command’s Fleet Readiness Training
Program (FRTP), Polk and Highland
Counties, FL, Wait Period Ends: 11/
28/2005, Contact: Will Sloger 843–
820–5797.
Amended Notices
EIS No. 20050334, Final EIS, DOE, MT,
South Fork Flathead Watershed
Westslope Cutthroat Trout
Conservation Program, Preserve the
Genetic Purity of the Westslope
Cutthroat Trout Population, Flathead
National Forest, Flathead River,
Flathead, Powell and Missoula
Counties, MT, Wait Period Ends: 12/
12/2005, Contact: Colleen Spiering
503–230–5756. Revision of FR Notice
Published on 08/19/2005: Reopened
the Wait Period from 09/19/2005 to
12/12/2005.
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 70, Number 208 (Friday, October 28, 2005)]
[Notices]
[Pages 62106-62107]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-21545]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6668-8]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050216, ERP No. D-IBR-K65285-CA, San Luis Drainage Feature
Re-evaluation Project, Provide Agricultural Drainage Service to the San
Luis Unit, Several Counties, CA.
Summary: EPA has concerns about the In-Valley Disposal Alternatives
because of uncertainties about treatments to remove selenium from
drainage water, the lack of information on contaminant profile and
disposal of biotreatment and reverse osmosis brine, and potential
environmental effects of evaporation ponds and reuse areas. EPA has
environmental objections to the San Francisco Delta and Pacific Ocean
Disposal Alternatives because of potential adverse effects to the
Delta, Estero Bay, and drinking water supply. Rating EO2.
EIS No. 20050222, ERP No. D-FAA-K51042-AZ, Phoenix Sky Harbor
International Airport (PHX), Construction and Operation of a Terminal,
Airfield and Surface Transportation, City of Phoenix, Maricopa County,
AZ.
Summary: EPA expressed environmental concerns about documentation
of alternatives that were eliminated and recommended additional
mitigation measures for air quality. Rating EC2.
EIS No. 20050293, ERP No. D-WPA-K08030-AZ, Wellton-Mohawk Generating
Facility Project, Construction and Operation a Natural Gas-Fired,
Combined-Cycle, Electric Generating Stations, Approval for Right-of-
Way, Yuma County, AZ.
Summary: EPA expressed environmental concerns about potential
impacts to water quality, wildlife, and traditional cultural
properties, and recommended a (1) commitment to specific additional
mitigation measures described in the DEIS, (2) selection of pipeline
route Option 2, and (3) construction of the double-circuit Ligurta-to-
Dome Tap Transmission Line. EPA also requested additional information
on air emissions, the regional natural gas pipelines, exhaust stack
height variance, and need for local energy generation. Rating EC2.
EIS No. 20050318, ERP No. D-BIA-F65058-MI, Nottawaseppi Huron Band of
Potawatomi Indians (the Tribe), Proposes Fee-to-Trust Transfer and
Casino Project, Calhoun County, MI.
Summary: EPA expressed environmental concerns about potential
impacts to waterbodies and traffic safety, and requested additional
information on conservation measures. Rating EC2.
EIS No. 20050350, ERP No. D-COE-K30022-CA, Encinitas/Solana Beach
Shoreline Protection Project, To Protect Public Safety and Reduce
Storm-Related Damages to Coastal Structures, Cities of Encinitas and
Solana Beach, San Diego County, CA.
Summary: EPA expressed environmental concerns about the project's
impacts to water resources, endangered species, and air quality, and
requested specific information regarding modeling and post-project
monitoring for impacts to these resources. Rating EC2.
EIS No. 20050390, ERP No. D-NPS-H65026-IA, Hoover Creek Stream
Management Plan, Implementation, Herbert Hoover National Historic Site,
IA
Summary: EPA has no objections to the proposed project. Rating LO.
Final EISs
EIS No. 20050263, ERP No. F-AFS-K65280-CA, Power Fire Restoration
Project, To Reduce Long-Term Fuel Loading for the Purpose of Reducing
Future Severity and Resistance to Control, Amador Ranger District,
Eldorado National Forest, Amado County, CA.
Summary: EPA continues to have concerns about ground disturbing
[[Page 62107]]
logging methods in high risk watersheds, and recommends greater use of
helicopter or skyline logging systems in order to minimize potential
impacts to water resources.
EPA also recommend utilizing the results of water quality
monitoring performed by other agencies in evaluating the environmental
benefits of the final project design.
EIS No. 20050269, ERP No. F-AFS-K65279-CA, Freds Fire Restoration
Project, To Reduce Long-Term Fuel Loading for the Purpose of Reducing
Future Fire Severity and Resistance to Control, Eldorado National
Forest, El Dorado County, CA
Summary: EPA has no objections to the project as described in the
FEIS.
EIS No. 20050272, ERP No. F-NRS-L39060-OR, Williamson River Delta
Restoration Project, To Restore and Maintain the Ecological Functions
of the Delta, Williamson River, Klamath County, OR.
Summary: No comment letter was sent to the preparing agency.
EIS No. 20050364, ERP No. F-FHW-H40183-00, Council Bluffs Interstate
System Improvements Project, Transportation Improvements, Missouri
River on I-80 to east of I-480 Interchange, Tier 1, Pottawattamie
County, IA and Douglas County, NE.
Summary: EPA has no objections to the proposed project.
EIS No. 20050372, ERP No. F-AFS-K65282-AZ, Pickett Lake and Padre
Canyon Allotments Cattle Grazing Management, Authorization and
Implementation, Coconino National Forest, Mormon Lake Ranger District,
Coconino County, AZ.
Summary: EPA continues to have environmental concerns about the
impacts of grazing on impaired meadow and grassland soils, and the
sufficiency of wetlands vegetation protection necessary for successful
pronghorn fawning.
EIS No. 20050402, ERP No. F-FHW-J40163-UT, Iron County Transportation
Corridors, Construction from Station Road 56 to Exit 51 on Interstate
15, Funding and Right-of-Way Grant, Southwest of the Cedar City Limits,
Iron County, UT.
Summary: EPA has no objections to the proposed project.
Dated: October 25, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-21545 Filed 10-27-05; 8:45 am]
BILLING CODE 6560-50-P