Drawbridge Operation Regulations; Shark River (South Channel), NJ, 62064 [05-21501]

Download as PDF 62064 Federal Register / Vol. 70, No. 208 / Friday, October 28, 2005 / Rules and Regulations (2) Normally will conduct an expedited sunset review and, not later than 120 days after the date of publication in the Federal Register of the notice of initiation, issue final results of review based on the facts available in accordance with § 351.308(f) (see section 751(c)(3)(B) of the Act and § 351.221(c)(5)(ii)). * * * * * Reporting and recordkeeping requirements. Dated: October 20, 2005. Joseph A. Spetrini, Acting Assistant Secretary for Import Administration. For the reasons stated, 19 CFR part 351 is amended as follows: I PART 351—ANTIDUMPING AND COUNTERVAILING DUTIES Subpart C—Information and Argument Subpart B—Antidumping and Countervailing Duty Procedures 2. Section 351.309 is amended by revising paragraph (c)(1)(iii) to read as follows: I 1. Section 351.218 is amended by revising paragraphs (d)(2)(ii) introductory text, (d)(2)(iv)(C), (e)(1)(ii)(B) introductory text, (e)(1)(ii)(B)(3), and (e)(1)(ii)(C)(2), and removing and reserving paragraph (d)(2)(iii), as follows: I § 351.309 § 351.218 Sunset reviews under section 751(c) of the Act. * * * * * (d) * * * (2) * * * (ii) Contents of statement of waiver. Every statement of waiver must include a statement indicating that the respondent interested party waives participation in the sunset review before the Department; a statement that the respondent interested party is likely to dump or benefit from a countervailable subsidy (as the case may be) if the order is revoked or the investigation is terminated; in the case of a foreign government in a CVD sunset review, a statement that the government is likely to provide a countervailable subsidy if the order is revoked or the investigation is terminated; and the following information: * * * * * (iv) * * * (C) Base the final results of review on the facts available in accordance with 351.308(f). * * * * * (e) Conduct of sunset review—(1) * * * (ii) * * * (B) Failure of a foreign government to file a substantive response to a notice of initiation in a CVD sunset review. If a foreign government fails to file a complete substantive response to a notice of initiation in a CVD sunset review under paragraph (d)(3)(v) of this section or waives participation in a CVD sunset review under paragraph (d)(2)(i) of this section, the Secretary will: * * * (3) Base the final results of review on the facts available in accordance with 351.308(f). (C) * * * VerDate Aug<31>2005 14:35 Oct 27, 2005 Jkt 208001 Written argument. * * * * * (c) Case brief. (1) * * * (iii) For the final results of an expedited sunset review, expedited antidumping review, Article 8 violation review, Article 4/Article 7 review, or section 753 review, a date specified by the Secretary. * * * * * [FR Doc. 05–21468 Filed 10–28–05; 8:45 am] BILLING CODE 3510–DS–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [CGD05–05–127] RIN 1625–AA–09 Drawbridge Operation Regulations; Shark River (South Channel), NJ Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Route 71 Bridge, at mile 0.8, across Shark River (South Channel), at Belmar, New Jersey. This deviation allows the drawbridge to provide vessel openings upon two hours advance notice each day from 8 a.m. to 3 p.m. and from 6 p.m. to 10 p.m. beginning on Monday, October 31 until Thursday, November 3, 2005, to facilitate emergency mechanical repairs. DATES: The deviation is effective from 8 a.m. to 3 a.m. and from 6 p.m. to 10 p.m. from October 31 until November 3, 2005. ADDRESSES: Materials referred to in this document are available for inspection or copying at Commander (obr), Fifth Coast PO 00000 Frm 00010 Fmt 4700 Sfmt 4700 Guard District, Federal Building, 1st Floor, 431 Crawford Street, Portsmouth, VA 23704–5004 between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays. The telephone number is (757) 398–6222. Commander (obr), Fifth Coast Guard District maintains the public docket for this temporary deviation. FOR FURTHER INFORMATION CONTACT: Waverly W. Gregory, Jr., Bridge Administrator, Fifth Coast Guard District, at (757) 398–6222. The Route 71 Bridge, at mile 0.8 across Shark River (South Channel), a bascule-type drawbridge, has a vertical clearance in the closed position to vessels of 13 feet, at mean high water. The New Jersey Department of Transportation, the bridge owner, requested a temporary deviation from the operating regulations for the Route 71 Bridge, set out in 33 CFR 117.751, to effect emergency repair and replacement of the span lock motor and gear box of the draw span. To facilitate the work, the Route 71 Bridge will provide vessel openings of the draw span upon two hours advance notice each day from 8 a.m. to 3 p.m. and from 6 p.m. to 10 p.m. beginning on Monday, October 31, 2005 until and including Thursday, November 3, 2005. At all other times, the bridge will operate in accordance with 33 CFR 117.751. The Coast Guard has informed the known users of the waterway of the closure periods for the bridge so that these vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35. SUPPLEMENTARY INFORMATION: Dated: October 20, 2005. Waverly W. Gregory, Jr., Chief, Bridge Administration Branch, Fifth Coast Guard District. [FR Doc. 05–21501 Filed 10–27–05; 8:45 am] BILLING CODE 4910–15–P E:\FR\FM\28OCR1.SGM 28OCR1

Agencies

[Federal Register Volume 70, Number 208 (Friday, October 28, 2005)]
[Rules and Regulations]
[Page 62064]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-21501]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[CGD05-05-127]
RIN 1625-AA-09


Drawbridge Operation Regulations; Shark River (South Channel), NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Fifth Coast Guard District, has approved a 
temporary deviation from the regulations governing the operation of the 
Route 71 Bridge, at mile 0.8, across Shark River (South Channel), at 
Belmar, New Jersey. This deviation allows the drawbridge to provide 
vessel openings upon two hours advance notice each day from 8 a.m. to 3 
p.m. and from 6 p.m. to 10 p.m. beginning on Monday, October 31 until 
Thursday, November 3, 2005, to facilitate emergency mechanical repairs.

DATES: The deviation is effective from 8 a.m. to 3 a.m. and from 6 p.m. 
to 10 p.m. from October 31 until November 3, 2005.

ADDRESSES: Materials referred to in this document are available for 
inspection or copying at Commander (obr), Fifth Coast Guard District, 
Federal Building, 1st Floor, 431 Crawford Street, Portsmouth, VA 23704-
5004 between 8 a.m. and 4 p.m., Monday through Friday, except Federal 
holidays. The telephone number is (757) 398-6222. Commander (obr), 
Fifth Coast Guard District maintains the public docket for this 
temporary deviation.

FOR FURTHER INFORMATION CONTACT: Waverly W. Gregory, Jr., Bridge 
Administrator, Fifth Coast Guard District, at (757) 398-6222.

SUPPLEMENTARY INFORMATION: The Route 71 Bridge, at mile 0.8 across 
Shark River (South Channel), a bascule-type drawbridge, has a vertical 
clearance in the closed position to vessels of 13 feet, at mean high 
water.
    The New Jersey Department of Transportation, the bridge owner, 
requested a temporary deviation from the operating regulations for the 
Route 71 Bridge, set out in 33 CFR 117.751, to effect emergency repair 
and replacement of the span lock motor and gear box of the draw span.
    To facilitate the work, the Route 71 Bridge will provide vessel 
openings of the draw span upon two hours advance notice each day from 8 
a.m. to 3 p.m. and from 6 p.m. to 10 p.m. beginning on Monday, October 
31, 2005 until and including Thursday, November 3, 2005. At all other 
times, the bridge will operate in accordance with 33 CFR 117.751.
    The Coast Guard has informed the known users of the waterway of the 
closure periods for the bridge so that these vessels can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(c), this work will be performed 
with all due speed in order to return the bridge to normal operation as 
soon as possible. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: October 20, 2005.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.
[FR Doc. 05-21501 Filed 10-27-05; 8:45 am]
BILLING CODE 4910-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.