Drawbridge Operation Regulations; Shark River (South Channel), NJ, 62064 [05-21501]
Download as PDF
62064
Federal Register / Vol. 70, No. 208 / Friday, October 28, 2005 / Rules and Regulations
(2) Normally will conduct an
expedited sunset review and, not later
than 120 days after the date of
publication in the Federal Register of
the notice of initiation, issue final
results of review based on the facts
available in accordance with
§ 351.308(f) (see section 751(c)(3)(B) of
the Act and § 351.221(c)(5)(ii)).
*
*
*
*
*
Reporting and recordkeeping
requirements.
Dated: October 20, 2005.
Joseph A. Spetrini,
Acting Assistant Secretary for Import
Administration.
For the reasons stated, 19 CFR part
351 is amended as follows:
I
PART 351—ANTIDUMPING AND
COUNTERVAILING DUTIES
Subpart C—Information and Argument
Subpart B—Antidumping and
Countervailing Duty Procedures
2. Section 351.309 is amended by
revising paragraph (c)(1)(iii) to read as
follows:
I
1. Section 351.218 is amended by
revising paragraphs (d)(2)(ii)
introductory text, (d)(2)(iv)(C),
(e)(1)(ii)(B) introductory text,
(e)(1)(ii)(B)(3), and (e)(1)(ii)(C)(2), and
removing and reserving paragraph
(d)(2)(iii), as follows:
I
§ 351.309
§ 351.218 Sunset reviews under section
751(c) of the Act.
*
*
*
*
*
(d) * * *
(2) * * *
(ii) Contents of statement of waiver.
Every statement of waiver must include
a statement indicating that the
respondent interested party waives
participation in the sunset review before
the Department; a statement that the
respondent interested party is likely to
dump or benefit from a countervailable
subsidy (as the case may be) if the order
is revoked or the investigation is
terminated; in the case of a foreign
government in a CVD sunset review, a
statement that the government is likely
to provide a countervailable subsidy if
the order is revoked or the investigation
is terminated; and the following
information:
*
*
*
*
*
(iv) * * *
(C) Base the final results of review on
the facts available in accordance with
351.308(f).
*
*
*
*
*
(e) Conduct of sunset review—(1)
* * *
(ii) * * *
(B) Failure of a foreign government to
file a substantive response to a notice of
initiation in a CVD sunset review. If a
foreign government fails to file a
complete substantive response to a
notice of initiation in a CVD sunset
review under paragraph (d)(3)(v) of this
section or waives participation in a CVD
sunset review under paragraph (d)(2)(i)
of this section, the Secretary will: * * *
(3) Base the final results of review on
the facts available in accordance with
351.308(f).
(C) * * *
VerDate Aug<31>2005
14:35 Oct 27, 2005
Jkt 208001
Written argument.
*
*
*
*
*
(c) Case brief. (1) * * *
(iii) For the final results of an
expedited sunset review, expedited
antidumping review, Article 8 violation
review, Article 4/Article 7 review, or
section 753 review, a date specified by
the Secretary.
*
*
*
*
*
[FR Doc. 05–21468 Filed 10–28–05; 8:45 am]
BILLING CODE 3510–DS–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD05–05–127]
RIN 1625–AA–09
Drawbridge Operation Regulations;
Shark River (South Channel), NJ
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, Fifth Coast
Guard District, has approved a
temporary deviation from the
regulations governing the operation of
the Route 71 Bridge, at mile 0.8, across
Shark River (South Channel), at Belmar,
New Jersey. This deviation allows the
drawbridge to provide vessel openings
upon two hours advance notice each
day from 8 a.m. to 3 p.m. and from 6
p.m. to 10 p.m. beginning on Monday,
October 31 until Thursday, November 3,
2005, to facilitate emergency
mechanical repairs.
DATES: The deviation is effective from 8
a.m. to 3 a.m. and from 6 p.m. to 10 p.m.
from October 31 until November 3,
2005.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at Commander (obr), Fifth Coast
PO 00000
Frm 00010
Fmt 4700
Sfmt 4700
Guard District, Federal Building, 1st
Floor, 431 Crawford Street, Portsmouth,
VA 23704–5004 between 8 a.m. and 4
p.m., Monday through Friday, except
Federal holidays. The telephone number
is (757) 398–6222. Commander (obr),
Fifth Coast Guard District maintains the
public docket for this temporary
deviation.
FOR FURTHER INFORMATION CONTACT:
Waverly W. Gregory, Jr., Bridge
Administrator, Fifth Coast Guard
District, at (757) 398–6222.
The Route
71 Bridge, at mile 0.8 across Shark River
(South Channel), a bascule-type
drawbridge, has a vertical clearance in
the closed position to vessels of 13 feet,
at mean high water.
The New Jersey Department of
Transportation, the bridge owner,
requested a temporary deviation from
the operating regulations for the Route
71 Bridge, set out in 33 CFR 117.751, to
effect emergency repair and replacement
of the span lock motor and gear box of
the draw span.
To facilitate the work, the Route 71
Bridge will provide vessel openings of
the draw span upon two hours advance
notice each day from 8 a.m. to 3 p.m.
and from 6 p.m. to 10 p.m. beginning on
Monday, October 31, 2005 until and
including Thursday, November 3, 2005.
At all other times, the bridge will
operate in accordance with 33 CFR
117.751.
The Coast Guard has informed the
known users of the waterway of the
closure periods for the bridge so that
these vessels can arrange their transits
to minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
SUPPLEMENTARY INFORMATION:
Dated: October 20, 2005.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth
Coast Guard District.
[FR Doc. 05–21501 Filed 10–27–05; 8:45 am]
BILLING CODE 4910–15–P
E:\FR\FM\28OCR1.SGM
28OCR1
Agencies
[Federal Register Volume 70, Number 208 (Friday, October 28, 2005)]
[Rules and Regulations]
[Page 62064]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-21501]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD05-05-127]
RIN 1625-AA-09
Drawbridge Operation Regulations; Shark River (South Channel), NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has approved a
temporary deviation from the regulations governing the operation of the
Route 71 Bridge, at mile 0.8, across Shark River (South Channel), at
Belmar, New Jersey. This deviation allows the drawbridge to provide
vessel openings upon two hours advance notice each day from 8 a.m. to 3
p.m. and from 6 p.m. to 10 p.m. beginning on Monday, October 31 until
Thursday, November 3, 2005, to facilitate emergency mechanical repairs.
DATES: The deviation is effective from 8 a.m. to 3 a.m. and from 6 p.m.
to 10 p.m. from October 31 until November 3, 2005.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at Commander (obr), Fifth Coast Guard District,
Federal Building, 1st Floor, 431 Crawford Street, Portsmouth, VA 23704-
5004 between 8 a.m. and 4 p.m., Monday through Friday, except Federal
holidays. The telephone number is (757) 398-6222. Commander (obr),
Fifth Coast Guard District maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT: Waverly W. Gregory, Jr., Bridge
Administrator, Fifth Coast Guard District, at (757) 398-6222.
SUPPLEMENTARY INFORMATION: The Route 71 Bridge, at mile 0.8 across
Shark River (South Channel), a bascule-type drawbridge, has a vertical
clearance in the closed position to vessels of 13 feet, at mean high
water.
The New Jersey Department of Transportation, the bridge owner,
requested a temporary deviation from the operating regulations for the
Route 71 Bridge, set out in 33 CFR 117.751, to effect emergency repair
and replacement of the span lock motor and gear box of the draw span.
To facilitate the work, the Route 71 Bridge will provide vessel
openings of the draw span upon two hours advance notice each day from 8
a.m. to 3 p.m. and from 6 p.m. to 10 p.m. beginning on Monday, October
31, 2005 until and including Thursday, November 3, 2005. At all other
times, the bridge will operate in accordance with 33 CFR 117.751.
The Coast Guard has informed the known users of the waterway of the
closure periods for the bridge so that these vessels can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 20, 2005.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.
[FR Doc. 05-21501 Filed 10-27-05; 8:45 am]
BILLING CODE 4910-15-P