Download as PDF Federal Register / Vol. 70, No. 206 / Wednesday, October 26, 2005 / Notices k. This application has been accepted, but is not ready for environmental analysis at this time. l. Description of Project: The existing project has a conventional development and a pumped storage development for a total current installed capacity of 2,538 megawatts (based on currently completed upgrades). Existing project facilities include: (a) Two 700-foot-long intake structures located on the upper Niagara River about 2.6 miles upstream from the American Falls; (b) two 4.3mile-long concrete underground water supply conduits, each measuring 46 feet wide by 66.5 feet high; (c) a forebay; (d) the Lewiston Pump-Generating Plant, measuring 975 feet long by 240 feet wide by 160 feet high; (e) the 1,900-acre Lewiston Reservoir at a maximum water surface elevation of 658 feet United States Lake Survey Datum; (f) the Robert Moses Niagara power plant, including an intake structure, measuring 1,100 feet long by 190 feet wide by 100 feet high; (g) a switch yard; and (h) appurtenant facilities. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing VerDate Aug<31>2005 16:26 Oct 25, 2005 Jkt 208001 responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule and final amendments: At this time we anticipate preparing a draft environmental impact statement (DEIS). Recipients will have 60 days to provide the Commission with any written comments on the DEIS. All comments filed with the Commission will be considered in the final environmental impact statement (FEIS). The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Notice of application ready for environmental analysis, soliciting final terms and conditions: February 2006. Notice of the Availability of the DEIS: May 2006. Notice of the Availability of the FEIS: November 2006. Ready for Commission’s decision on the application: February 2007. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Magalie R. Salas, Secretary. [FR Doc. E5–5904 Filed 10–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 61799 the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E5–5908 Filed 10–25–05; 8:45 am] [Docket No. RP06–28–000] BILLING CODE 6717–01–P Petal Gas Storage, L.L.C.; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY October 19, 2005. Federal Energy Regulatory Commission Take notice that on October 14, 2005, Petal Gas Storage, L.L.C. (Petal) tendered for filing as part of its FERC Gas Tariff, Original Volume No.1, First Revised Sheet No. 138, to become effective November 14, 2005. Petal states that the purpose of this filing is to remove the CIG/Granite State policy discount provisions in section 26 of the general terms and conditions of Petal’s tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 [Docket No. ES06–1–000] PPL Electric Utilities Corporation; Notice of Application October 18, 2005. Take notice that on October 11, 2005, PPL Electric Utilities Corporation, submitted an application pursuant to section 204 of the Federal Power Act seeking authorization to issue and reissue, and to have outstanding at any one time, short-term indebtedness in an E:\FR\FM\26OCN1.SGM 26OCN1

Agencies

[Federal Register Volume 70, Number 206 (Wednesday, October 26, 2005)]
[Notices]
[Page 61799]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5908]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-28-000]


Petal Gas Storage, L.L.C.; Notice of Proposed Changes in FERC Gas 
Tariff

October 19, 2005.
    Take notice that on October 14, 2005, Petal Gas Storage, L.L.C. 
(Petal) tendered for filing as part of its FERC Gas Tariff, Original 
Volume No.1, First Revised Sheet No. 138, to become effective November 
14, 2005.
    Petal states that the purpose of this filing is to remove the CIG/
Granite State policy discount provisions in section 26 of the general 
terms and conditions of Petal's tariff.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.