Environmental Impacts Statements; Notice of Availability, 61286-61287 [05-21100]

Download as PDF 61286 Federal Register / Vol. 70, No. 203 / Friday, October 21, 2005 / Notices 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 1, 2005 (70 FR 16815). Draft EISs EIS No. 20050198, ERP No. D–AFS– L65485–WA, Growden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA. Summary: EPA had concerns about potential impacts to wetlands and recommended that additional mitigation be developed. Rating EC2. EIS No. 20050292, ERP No. D–USA– K11038–HI, Makua Military Reservation (MMR) Project, Proposed Military Training Activities, 25th Infantry Division (Light) and U.S. Army, HI. Summary: EPA expressed environmental concerns regarding the introduction of additional weaponsrelated contaminants to soil and water, existing pollutant migration. EPA recommended the Army take advantage of pollution prevention opportunities and preventing further contaminant migration by removing priority sources of contamination and controlling runon/runoff from contaminated areas. Rating EC1. EIS No. 20050295, ERP No. D–AFS– K65288–CA, Bald Mountain Project, Proposes to Harvest Trees Using Group and Individual Trees Selection Methods, Feather River Ranger District, Plumas National Forest, Plumas and Butte Counties, CA. Summary: EPA expressed concerns with the limited scope of the cumulative impacts analysis and the lack of specific information on monitoring, project actions, funding, and existing conditions. EPA recommended rapid implementation of road improvements, staggered scheduling of projects and additional information on the above informational issues. Rating EC2. EIS No. 20050339, ERP No. D–AFS– J65450–SD, Deerfield Project Area, Proposes to Implement Multiple Resource Management Actions, Mystic Ranger District, Black Hills National Forest, Pennington County, South Dakota. Summary: EPA expressed concern about (1) unmitigated and nonquantified soil erosion, runoff, and sediment losses; (2) potential water quality impacts from timber harvest and roads; (3) wildlife impacts to sensitive species; and (4) targeted harvest of older VerDate Aug<31>2005 15:13 Oct 20, 2005 Jkt 208001 ponderosa pines important to sensitive wildlife. Rating EC2. EIS No. 20050346, ERP No. D–AFS– K02012–NV, White Pine & GrantQuinn Oil and Gas Leasing Project, Exploration and Development, Humboldt-Toiyabe National Forest, Ely Ranger District, White Pine, Nye and Lincoln Counties, NV. Summary: EPA expressed concern about impacts to water quality and habitat. EPA requested appropriate lease stipulations to protect these resources be included in the ROD. Rating EC2. EIS No. 20050349, ERP No. DB–COE– E36167–FL, Central and Southern Florida Project, Tamiami Trail Modifications, Modified Water Deliveries to Everglades National Park, Authorized Flow of Water from WCA–3B and the L–29 Canal North of the Tamiami Trail, Dade County, FL. Summary: EPA had no objections to the proposed project. Rating LO. Final EISs EIS No. 20050261, ERP No. F–IBR– K39090–CA, Cental Valley Project Long-Term Water Service Contract Renewals—American River Division, Proposes to Renew Long-Term Water Service Contracts, Sacramento, Placer and El Dorado Counties, CA. Summary: EPA continued to have concerns regarding the environmental impacts of potential increased water diversions from the American River on water quality, fisheries, aquatic ecosystems, and overall CVP operations and cumulative impacts. EIS No. 20050343, ERP No. F–BLM– J67031–ND, West Mine Area, Freedom Mine, Federal Coal Lease Application, Mercer County, ND. Summary: EPA expressed continued concern about the need to provide additional mitigation to compensate for the loss of fens and peatland wetlands. EIS No. 20050363, ERP No. F–NPS– E61076–00, Low Country Gullah Culture Special Resource Study, Gullah Culture Preservation and Protection Analysis to Consider the Suitability and Feasibility for Inclusion in the National Park Service System, SC, NC, GA, and FL. Summary: EPA has no objections to the proposed action. Dated: October 18, 2005. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 05–21102 Filed 10–20–05; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6668–5] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements. Filed October 10, 2005 through October 14, 2005. Pursuant to 40 CFR 1506.9. EIS No. 20050429, Final EIS, BLM, UT, Castle Peak and Eightmile Flat Oil and Gas Expansion Project, Expansion of Crude Oil and Natural Gas Development and Production Programs, Right-of-Way Grant, Duchesne and Uintah Counties, UT, Wait Period Ends: 11/21/2005, Contact: Jean Nitschke-Sinclear 435– 781–4437. EIS No. 20050430, Final EIS, COE, PA, The Town of Bloomsburg, Columbia County, Pennsylvania Flood Damage Reduction Project, Implementation, Integrated Feasibility Report, Susquhanna River and Fishing Creek, Town of Bloomsburg, Columbia County, PA, Wait Period Ends: 11/21/ 2005, Contact: Jeff Trulick 410–962– 6715. EIS No. 20050431, Final EIS, FHW, NE, South Omaha Veterans Memorial Bridge Improvements, Across the Missouri River for Highway US–275 between the Cities of Omaha, Nebraska and Council Bluffs, Iowa, NPDES and U.S. Army COE Section 404 Permit, NE and IA, Wait Period Ends: 11/21/2005, Contact: Edward Kosola 402–437–5973. EIS No. 20050432, Draft Supplement, FHW, GA, U.S. 411 Connector, From U.S. 411/GA–20 Interchange with U.S. 41 to U.S. 11 Interchange with I– 75, Updated Information, Funding and U.S. Army COE Section 404 Permit, Bartow County, GA, Comment Period Ends: 12/05/2005, Contact: Robert Callan 404–562–3630. EIS No. 20050433, Draft EIS, FHW, WI, U.S. Highway 12, Improvement from U.S. 12/WI–26 North Fort Atkinson Interchange to Whitewater Bypass, Funding, Rock and Jefferson Counties, WI, Comment Period Ends: 12/14/ 2005, Contact: Johnny Gerbitz 608– 829–7500. EIS No. 20050434, Final EIS, FHW, AR, Springdale Northern Bypass Project, U.S. Highway 412 Construction, Additional Information, Designation of a Preferred Alternative, Funding E:\FR\FM\21OCN1.SGM 21OCN1 Federal Register / Vol. 70, No. 203 / Friday, October 21, 2005 / Notices and NPDES Permit Issuance, Benton and Washington Counties, AR, Wait Period Ends: 11/23/2005, Contact: Randal Looney 501–324–5625. EIS No. 20050435, Draft EIS, NOA, 00, Snapper Grouper Fishery, Amendment 13C to the Fishery Management Plan, Phase Out Overfishing of Snowy Grouper, Golden Tilefish, Vermilion Snapper and Sea Bass, Implementation, South Atlantic Region, Comment Period Ends: 12/05/2005, Contact: Dr. Roy E. Crabtree 727–824–5301. EIS No. 20050436, Draft EIS, NPS, MI, Isle Royale National Park Wilderness and Backcounty Management Plan, Implementation, MI, Comment Period Ends: 12/20/2005, Contact: Phyllis Green 906–482–0986. EIS No. 20050437, Final EIS, AFS, NM, Tadjik Watershed Restoration Project, Proposes Fuel Reduction and Restore Forest Health, Cabala National Forest, Terrine County, NM, Wait Period Ends: 11/21/2005, Contact: Vicky Astride 505–847–2990. EIS No. 20050438, Draft EIS, COE, SC, Charleston Naval Complex (CAC), Proposed Construction of a Marine Container Terminal, Cooper River in Charleston Harbor, City of North Charleston, Charleston County, SC, Comment Period Ends: 12/20/2005, Contact: Nathaniel I. Ball 843–329– 8044. Amended Notices EIS No. 20050342, Draft EIS, NOA, 00, Consolidated Atlantic Highly Migratory Species Fishery Management Plan for Atlantic Tunas, Swordfish, and Shark and the Atlantic Billfish Fishery Management Plan, Implementation, Atlantic Coast, Caribbean and Gulf of Mexico, Comment Period Ends: 03/01/2006, Contact: Karyl Breasted Gauss 301– 713–2347, Revision of Notice Published in FR: 08/19/2005, Comment Period Extended from 10/18/2005 to 03/01/2006. EIS No. 20050369, Final EIS, FHW, MD, MD–32 Planning Study, Transportation Improvements from MD–108 to Interstate 70, Funding, Howard County, MD, Wait Period Ends: 11/11/2005, Contact: Caron Brookman 410–962–4440, Revision to FR Notice Published on 9/9/2005, Comment Period Extended from 10/11/2005 to 11/11/2005. EIS No. 20050394, Draft EIS, FHW, IA, Council Bluffs Interstate System Improvements Project (Tier 1), Transportation Improvements from the Missouri River on I–80 east of the I–480 Interchange in Omaha, Podium County, IA and Douglas County, NE, VerDate Aug<31>2005 15:13 Oct 20, 2005 Jkt 208001 Comment Period Ends: 02/28/2006, Contact: Philip Barnes 515–233–7300. This EIS was inadvertently refiled and published in 9/30/2005 FR. The Correct Notice was published in 12/ 23/2004 FR. EIS No. 20050417, Final Supplement, COE, MD, Poplar Island Environmental Restoration Project, Habitat Restoration and Dredged Material Capacity, Chesapeake Bay, Talbot County, MD, Wait Period Ends: 11/07/2005, Contact: Mark Mendelsohn 410–962–9499. Revision of Notice Published FR: 10/07/2005. Correction to Contact Telephone Number. Dated: October 18, 2005. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 05–21100 Filed 10–20–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–7987–3] Clean Air Act Advisory Committee (CAAAC): Notice of Meeting Environmental Protection Agency. ACTION: Notice of meeting. AGENCY: SUMMARY: The Environmental Protection Agency (EPA) established the Clean Air Act Advisory Committee (CAAAC) on November 19, 1990, to provide independent advice and counsel to EPA on policy issues associated with implementation of the Clean Air Act of 1990. The Committee advises on economic, environmental, technical scientific, and enforcement policy issues. Open meeting notice; Pursuant to 5 U.S.C. App. 2 Section 10(a)(2), notice is hereby given that the Clean Air Act Advisory Committee will hold its next open meeting on Thursday, November 17, 2005, from approximately 8:30 a.m. to 4:30 p.m. at the Camino Real Hotel in El Paso, Texas. Seating will be available on a first come, first served basis. Subcommittee meetings will be held on November 16, 2005 from approximately 8:30 a.m to 12 p.m. at the same location as the full Committee. The Mobile Source Technical Review subcommittee and the Air Quality Management subcommittee will not meet at this time. The agenda for the full committee meeting will be posted on the CAAAC Web site: https:// www.epa.gov/oar/caaac/. DATES: PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 61287 Inspection of Committee Documents: The Committee agenda and any documents prepared for the meeting will be publicly available at the meeting. Thereafter, these documents, together with CAAAC meeting minutes, will be available by contacting the Office of Air and Radiation Docket and requesting information under docket OAR–2004–0075. The Docket office can be reached by telephoning 202–260– 7548; FAX 202–260–4400. FOR FURTHER INFORMATION CONTACT: Concerning the CAAAC, please contact Pat Childers, Office of Air and Radiation, U.S. EPA (202) 564–1082, FAX (202) 564–1352 or by mail at U.S. EPA, Office of Air and Radiation (Mail code 6102 A), 1200 Pennsylvania Avenue, NW., Washington, DC 20004. For information on the Subcommittees, please contact the following individuals: (1) Permits/NSR/Toxics Integration—Debbie Stackhouse, (919) 541–5354; and (2) Air Quality Management—Jeff Whitlow, (919) 541– 5523 (3) Economic Incentives and Regulatory Innovations—Carey Fitzmaurice, (202)564–1667 (4) Mobile Source Technical Review—Joseph Bachman, (202) 343–9373. Additional Information on these meetings, CAAAC and its Subcommittees can be found on the CAAAC Web site: https:// www.epa.gov/oar/caaac/. For information on access or services for individuals with disabilities, please contact Mr. Pat Childers at (202) 564– 1082 or childers.pat@epa.gov. To request accommodation of a disability, please contact Mr. Childers, preferably at least 10 days prior to the meeting, to give EPA as much time as possible to process your request. Dated October 14, 2005. Rob Brenner, Director, Office of Policy, Analysis and Review, Office of Air and Radiation. [FR Doc. 05–21097 Filed 10–20–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [OPP–2004–0347 FRL–7726–2] Fluazifop-P-butyl; Tolerance Reassessment Decision; Notice of Availability Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: This notice announces the availability of EPA’s Tolerance Reassessment Decision (TRED) for the pesticide fluazifop-P-butyl. The E:\FR\FM\21OCN1.SGM 21OCN1

Agencies

[Federal Register Volume 70, Number 203 (Friday, October 21, 2005)]
[Notices]
[Pages 61286-61287]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-21100]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6668-5]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/ nepa/.

Weekly receipt of Environmental Impact Statements.
Filed October 10, 2005 through October 14, 2005.
Pursuant to 40 CFR 1506.9.

EIS No. 20050429, Final EIS, BLM, UT, Castle Peak and Eightmile Flat 
Oil and Gas Expansion Project, Expansion of Crude Oil and Natural Gas 
Development and Production Programs, Right-of-Way Grant, Duchesne and 
Uintah Counties, UT, Wait Period Ends: 11/21/2005, Contact: Jean 
Nitschke-Sinclear 435-781-4437.
EIS No. 20050430, Final EIS, COE, PA, The Town of Bloomsburg, Columbia 
County, Pennsylvania Flood Damage Reduction Project, Implementation, 
Integrated Feasibility Report, Susquhanna River and Fishing Creek, Town 
of Bloomsburg, Columbia County, PA, Wait Period Ends: 11/21/2005, 
Contact: Jeff Trulick 410-962-6715.
EIS No. 20050431, Final EIS, FHW, NE, South Omaha Veterans Memorial 
Bridge Improvements, Across the Missouri River for Highway US-275 
between the Cities of Omaha, Nebraska and Council Bluffs, Iowa, NPDES 
and U.S. Army COE Section 404 Permit, NE and IA, Wait Period Ends: 11/
21/2005, Contact: Edward Kosola 402-437-5973.
EIS No. 20050432, Draft Supplement, FHW, GA, U.S. 411 Connector, From 
U.S. 411/GA-20 Interchange with U.S. 41 to U.S. 11 Interchange with I-
75, Updated Information, Funding and U.S. Army COE Section 404 Permit, 
Bartow County, GA, Comment Period Ends: 12/05/2005, Contact: Robert 
Callan 404-562-3630.
EIS No. 20050433, Draft EIS, FHW, WI, U.S. Highway 12, Improvement from 
U.S. 12/WI-26 North Fort Atkinson Interchange to Whitewater Bypass, 
Funding, Rock and Jefferson Counties, WI, Comment Period Ends: 12/14/
2005, Contact: Johnny Gerbitz 608-829-7500.
EIS No. 20050434, Final EIS, FHW, AR, Springdale Northern Bypass 
Project, U.S. Highway 412 Construction, Additional Information, 
Designation of a Preferred Alternative, Funding

[[Page 61287]]

and NPDES Permit Issuance, Benton and Washington Counties, AR, Wait 
Period Ends: 11/23/2005, Contact: Randal Looney 501-324-5625.
EIS No. 20050435, Draft EIS, NOA, 00, Snapper Grouper Fishery, 
Amendment 13C to the Fishery Management Plan, Phase Out Overfishing of 
Snowy Grouper, Golden Tilefish, Vermilion Snapper and Sea Bass, 
Implementation, South Atlantic Region, Comment Period Ends: 12/05/2005, 
Contact: Dr. Roy E. Crabtree 727-824-5301.
EIS No. 20050436, Draft EIS, NPS, MI, Isle Royale National Park 
Wilderness and Backcounty Management Plan, Implementation, MI, Comment 
Period Ends: 12/20/2005, Contact: Phyllis Green 906-482-0986.
EIS No. 20050437, Final EIS, AFS, NM, Tadjik Watershed Restoration 
Project, Proposes Fuel Reduction and Restore Forest Health, Cabala 
National Forest, Terrine County, NM, Wait Period Ends: 11/21/2005, 
Contact: Vicky Astride 505-847-2990.
EIS No. 20050438, Draft EIS, COE, SC, Charleston Naval Complex (CAC), 
Proposed Construction of a Marine Container Terminal, Cooper River in 
Charleston Harbor, City of North Charleston, Charleston County, SC, 
Comment Period Ends: 12/20/2005, Contact: Nathaniel I. Ball 843-329-
8044.

Amended Notices

EIS No. 20050342, Draft EIS, NOA, 00, Consolidated Atlantic Highly 
Migratory Species Fishery Management Plan for Atlantic Tunas, 
Swordfish, and Shark and the Atlantic Billfish Fishery Management Plan, 
Implementation, Atlantic Coast, Caribbean and Gulf of Mexico, Comment 
Period Ends: 03/01/2006, Contact: Karyl Breasted Gauss 301-713-2347, 
Revision of Notice Published in FR: 08/19/2005, Comment Period Extended 
from 10/18/2005 to 03/01/2006.
EIS No. 20050369, Final EIS, FHW, MD, MD-32 Planning Study, 
Transportation Improvements from MD-108 to Interstate 70, Funding, 
Howard County, MD, Wait Period Ends: 11/11/2005, Contact: Caron 
Brookman 410-962-4440, Revision to FR Notice Published on 9/9/2005, 
Comment Period Extended from 10/11/2005 to 11/11/2005.
EIS No. 20050394, Draft EIS, FHW, IA, Council Bluffs Interstate System 
Improvements Project (Tier 1), Transportation Improvements from the 
Missouri River on I-80 east of the I-480 Interchange in Omaha, Podium 
County, IA and Douglas County, NE, Comment Period Ends: 02/28/2006, 
Contact: Philip Barnes 515-233-7300. This EIS was inadvertently refiled 
and published in 9/30/2005 FR. The Correct Notice was published in 12/
23/2004 FR.
EIS No. 20050417, Final Supplement, COE, MD, Poplar Island 
Environmental Restoration Project, Habitat Restoration and Dredged 
Material Capacity, Chesapeake Bay, Talbot County, MD, Wait Period Ends: 
11/07/2005, Contact: Mark Mendelsohn 410-962-9499. Revision of Notice 
Published FR: 10/07/2005. Correction to Contact Telephone Number.

    Dated: October 18, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-21100 Filed 10-20-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.