Colorado Interstate Gas Company; Notice of Operational Purchases/Sales; Annual Report, 60806 [E5-5754]

Download as PDF 60806 Federal Register / Vol. 70, No. 201 / Wednesday, October 19, 2005 / Notices [Docket No. RP06–13–000] The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on October 20, 2005. CenterPoint Energy Gas Transmission Company; Notice of Request for Waiver of Tariff Provision Magalie R. Salas, Secretary. [FR Doc. E5–5770 Filed 10–18–05; 8:45 am] October 12, 2005. BILLING CODE 6717–01–P review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on October 25, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–5759 Filed 10–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Take notice that on October 7, 2005, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing with the Commission a Request for Waiver seeking the permission of the Commission to allow CEGT to waive section 14.2 of the general terms and conditions of its FERC Gas Tariff which requires CEGT to provide prior notice of termination to non-creditworthy Shippers. CEGT states that the Shipper in question is no longer doing business, and to provide such notice would be futile. CEGT requested expedited treatment of its request for waiver. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. VerDate Aug<31>2005 14:50 Oct 18, 2005 Jkt 208001 Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on October 19, 2005. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E5–5754 Filed 10–18–05; 8:45 am] BILLING CODE 6717–01–P [Docket No. RP06–9–000] DEPARTMENT OF ENERGY Colorado Interstate Gas Company; Notice of Operational Purchases/Sales; Annual Report Federal Energy Regulatory Commission October 12, 2005. [Docket No. EC06–1–000] Take notice that on October 6, 2005, Colorado Interstate Gas Company tendered for filing its annual report of operational purchases and sales in accordance with section 37.3 of the general terms and conditions of its FERC Gas Tariff, First Revised Volume No. 1. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Coral Power, L.L.C; Constellation Energy Commodities Group, Inc.; Notice of Filing PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 October 12, 2005. Take notice that on October 3, 2005, Coral Power, L.L.C. (Coral Power) and Constellation Energy Commodities Group, Inc. (CCG) (collectively, Applicants) filed an application under section 203 of the Federal Power Act requesting Commission authorization for the transfer of a full requirements service contract with Baltimore Gas and Electric Company from Coral Power to CCG. Applicants state that they are power marketers with market-based rate tariffs on file with the Commission. Applicants have requested confidential treatment of the contents of Exhibit G and Exhibit I to the section 203 application. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of E:\FR\FM\19OCN1.SGM 19OCN1

Agencies

[Federal Register Volume 70, Number 201 (Wednesday, October 19, 2005)]
[Notices]
[Page 60806]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5754]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-9-000]


Colorado Interstate Gas Company; Notice of Operational Purchases/
Sales; Annual Report

October 12, 2005.
    Take notice that on October 6, 2005, Colorado Interstate Gas 
Company tendered for filing its annual report of operational purchases 
and sales in accordance with section 37.3 of the general terms and 
conditions of its FERC Gas Tariff, First Revised Volume No. 1.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the date as indicated 
below. Anyone filing an intervention or protest must serve a copy of 
that document on the Applicant. Anyone filing an intervention or 
protest on or before the intervention or protest date need not serve 
motions to intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. eastern time on October 19, 2005.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-5754 Filed 10-18-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.