Williston Basin Interstate Pipeline Company; Notice of Negotiated Rate, 60323 [E5-5665]

Download as PDF Federal Register / Vol. 70, No. 199 / Monday, October 17, 2005 / Notices (Trunkline LNG), P.O. Box 4967, Houston, Texas 77210–4967, filed an abbreviated application, pursuant to section 7(c) of the Natural Gas Act (NGA) and part 157 of the Commission’s Rules and Regulations, for a Certificate of Public Convenience and Necessity requesting authorization to acquire an undivided 50% interest in a gas turbine power generator and appurtenant facilities located at Trunkline LNG’s liquefied natural gas (LNG) terminal near Lake Charles, Louisiana. The application is on file with the Commission and open for public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Trunkline LNG proposes to acquire an undivided 50% ownership interest in an existing gas turbine/generator, Unit 2204—JA, and appurtenant facilities from PLCG, formerly CMS Panhandle Lake Charles Generation, LLC, formerly PanEnergy Lake Charles Generation, Inc. Trunkline LNG will continue to use Unit 2204—JA with its 16 megawatts of generating capability as a back-up power source for ship unloading and emergency back-up power needs. The acquisition of the facilities will be in place and will not result in any ground disturbance. Any questions regarding the application are to be directed to William W. Grygar, Vice President of Rates and Regulatory Affairs, 5444 Westheimer Road, Houston, Texas 77056–5306; phone number (713) 989–7000. Any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant VerDate Aug<31>2005 15:43 Oct 14, 2005 Jkt 208001 and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper, see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: November 1, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–5701 Filed 10–14–05; 8:45 am] 60323 Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. BILLING CODE 6717–01–P Magalie R. Salas, Secretary. [FR Doc. E5–5665 Filed 10–14–05; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. RP03–323–007] DEPARTMENT OF ENERGY Williston Basin Interstate Pipeline Company; Notice of Negotiated Rate Federal Energy Regulatory Commission October 6, 2005. [Docket No. QF88–61–004] Take notice that on September 30, 2005, Williston Basin Interstate Pipeline Company (Williston Basin), tendered for filing with the Commission a revised negotiated Rate Schedule FT–1 Service Agreement. The proposed effective date of the service agreement is October 1, 2005. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Woodland Biomass Power, Ltd.; Notice of Filing PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 October 6, 2005. Take notice that on October 3, 2005, Woodland Biomass Power, Ltd. (Woodland) and DTE Woodland, LLC (DTE) filed with the Commission a joint application for certification of a 28 MW small power production facility located in Woodland, California as a qualifying small power production facility pursuant to 18 CFR 292.207(b) of the Commission’s regulations. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the E:\FR\FM\17OCN1.SGM 17OCN1

Agencies

[Federal Register Volume 70, Number 199 (Monday, October 17, 2005)]
[Notices]
[Page 60323]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5665]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP03-323-007]


Williston Basin Interstate Pipeline Company; Notice of Negotiated 
Rate

October 6, 2005.
    Take notice that on September 30, 2005, Williston Basin Interstate 
Pipeline Company (Williston Basin), tendered for filing with the 
Commission a revised negotiated Rate Schedule FT-1 Service Agreement. 
The proposed effective date of the service agreement is October 1, 
2005.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-5665 Filed 10-14-05; 8:45 am]
BILLING CODE 6717-01-P