Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Accident Storage Enhancement Project and Request for Comments on Environmental Issues, 60330-60331 [E5-5654]
Download as PDF
60330
Federal Register / Vol. 70, No. 199 / Monday, October 17, 2005 / Notices
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5657 Filed 10–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–392–000]
Texas Eastern Transmission, LP;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Accident Storage
Enhancement Project and Request for
Comments on Environmental Issues
October 6, 2005.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Accident Storage Enhancement
Project involving construction and
operation of facilities by Texas Eastern
Transmission, LP (Texas Eastern) near
the town of Accident in Garrett County,
Maryland.1 The proposed facilities
include new storage wells, field
pipelines and appurtenances, reworking
of wellhead valves, grounding and surge
protection modifications, related
facilities. This EA will be used by the
Commission in its decisionmaking
process to determine whether the
1 Texas Eastern’s application was filed with the
Commission under section 7 of the Natural Gas Act
and part 157 of the Commission’s regulations.
VerDate Aug<31>2005
15:43 Oct 14, 2005
Jkt 208001
project is in the public convenience and
necessity.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with State
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice Texas Eastern provided to
landowners. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is
available for viewing on the FERC
Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
Texas Eastern is proposing to provide
additional working gas capacity and
increase reliability at its Accident
Storage Field in Garrett County,
Maryland by increasing injection
capability, expanding the working gas
capacity by 3.0 billion cubic feet and
enhance withdrawal. Texas Eastern’s
proposed activities include:
• Reworking of 38 existing wells;
• Re-enter and drill-out horizontally,
7 wells;
• Installation of communication and
grounding/surge protection on 54 wells;
• Replacement of wellhead valves on
15 wellheads;
• Installation of new slug catcher
facilities on three field laterals;
• Drilling 2 new horizontal wells;
• Installing approximately 0.8 mile of
gather pipeline; and
• Construction of 4 new access roads
and appurtenant equipment.
The general location of the project
facilities is shown in Appendix 1.2
Land Requirements for Construction
Construction of all project facilities,
including pipelines, well pads, access
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (maps), are
available on the Commission’s Website at the
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
roads, a pipe storage yard and extra
workspaces would impact
approximately 21.43 acres.
Following construction, about 6.32
acres would be maintained as new
aboveground facility sites, access roads,
or permanent pipeline right-of-way. The
remaining 15.11 acres of land would be
restored and allowed to revert to its
former use.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA we 3 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Water resources and wetlands;
• Fisheries, vegetation, and wildlife;
• Endangered and threatened species;
• Land use, recreation, and visual
resources;
• Cultural resources;
• Air quality and noise; and
• Reliability and safety.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to Federal, State,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
1 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
E:\FR\FM\17OCN1.SGM
17OCN1
Federal Register / Vol. 70, No. 199 / Monday, October 17, 2005 / Notices
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the public participation
section beginning on page 4.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
Texas Eastern. This preliminary list of
issues may be changed based on your
comments and our analysis.
• Noise impacts due to well drilling
on local residences.
• Wetland and stream impacts.
• Surface water quality in
Youghiogheny River watershed.
• Construction and Operations Safety.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal (including
alternative locations/routes), and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of OEP/DG2E—Gas Branch
3.
• Reference Docket No. CP05–392–
000.
• Mail your comments so that they
will be received in Washington, DC on
or before November 7, 2005.
Please note that we are continuing to
experience delays in mail deliveries
from the U.S. Postal Service. As a result,
we will include all comments that we
receive within a reasonable time frame
in our environmental analysis of this
project. However, the Commission
strongly encourages electronic filing of
any comments or interventions or
protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
VerDate Aug<31>2005
18:16 Oct 14, 2005
Jkt 208001
on the Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide. Before
you can file comments you will need to
create a free account which can be
created on-line.
We may mail the EA for comment. If
you are interested in receiving it, please
return the Information Request
(Appendix 3). If you do not return the
Information Request, you will be taken
off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at https://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with email addresses may be served
electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities. By this
notice we are also asking governmental
agencies, especially those in Appendix
2, to express their interest in becoming
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
60331
cooperating agencies for the preparation
of the EA.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5654 Filed 10–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Surrender of
License With Dam Removal and
Soliciting Comments, Motions To
Intervene, and Protests
October 11, 2005.
a. Type of Application: Application
for Surrender of License and Dam
Removal.
b. Project Number: P–11433–016.
c. Date Filed: October 3, 2005.
d. Applicant: Madison Electric Works.
e. Name of Project: Sandy River
Project (FERC No. 11433).
f. Location: The project is located on
the Sandy River, near the town of
Starks/Norridgewock, in Somerset
County, Maine.
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 70, Number 199 (Monday, October 17, 2005)]
[Notices]
[Pages 60330-60331]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5654]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP05-392-000]
Texas Eastern Transmission, LP; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Accident Storage Enhancement
Project and Request for Comments on Environmental Issues
October 6, 2005.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Accident Storage Enhancement
Project involving construction and operation of facilities by Texas
Eastern Transmission, LP (Texas Eastern) near the town of Accident in
Garrett County, Maryland.\1\ The proposed facilities include new
storage wells, field pipelines and appurtenances, reworking of wellhead
valves, grounding and surge protection modifications, related
facilities. This EA will be used by the Commission in its
decisionmaking process to determine whether the project is in the
public convenience and necessity.
---------------------------------------------------------------------------
\1\ Texas Eastern's application was filed with the Commission
under section 7 of the Natural Gas Act and part 157 of the
Commission's regulations.
---------------------------------------------------------------------------
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The pipeline company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the pipeline
company could initiate condemnation proceedings in accordance with
State law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice Texas Eastern provided to landowners. This fact sheet
addresses a number of typically asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
It is available for viewing on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
Texas Eastern is proposing to provide additional working gas
capacity and increase reliability at its Accident Storage Field in
Garrett County, Maryland by increasing injection capability, expanding
the working gas capacity by 3.0 billion cubic feet and enhance
withdrawal. Texas Eastern's proposed activities include:
Reworking of 38 existing wells;
Re-enter and drill-out horizontally, 7 wells;
Installation of communication and grounding/surge
protection on 54 wells;
Replacement of wellhead valves on 15 wellheads;
Installation of new slug catcher facilities on three field
laterals;
Drilling 2 new horizontal wells;
Installing approximately 0.8 mile of gather pipeline; and
Construction of 4 new access roads and appurtenant
equipment.
The general location of the project facilities is shown in Appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (maps), are available on the Commission's Website at
the ``eLibrary'' link or from the Commission's Public Reference
Room, 888 First Street, NE., Washington, DC 20426, or call (202)
502-8371. For instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of all project facilities, including pipelines, well
pads, access roads, a pipe storage yard and extra workspaces would
impact approximately 21.43 acres.
Following construction, about 6.32 acres would be maintained as new
aboveground facility sites, access roads, or permanent pipeline right-
of-way. The remaining 15.11 acres of land would be restored and allowed
to revert to its former use.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping''. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \3\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\1\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Geology and soils;
Water resources and wetlands;
Fisheries, vegetation, and wildlife;
Endangered and threatened species;
Land use, recreation, and visual resources;
Cultural resources;
Air quality and noise; and
Reliability and safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, State, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will
[[Page 60331]]
be allotted for review if the EA is published. We will consider all
comments on the EA before we make our recommendations to the
Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section beginning on page 4.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Texas Eastern. This
preliminary list of issues may be changed based on your comments and
our analysis.
Noise impacts due to well drilling on local residences.
Wetland and stream impacts.
Surface water quality in Youghiogheny River watershed.
Construction and Operations Safety.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal (including alternative
locations/routes), and measures to avoid or lessen environmental
impact. The more specific your comments, the more useful they will be.
Please carefully follow these instructions to ensure that your comments
are received in time and properly recorded:
Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of OEP/
DG2E--Gas Branch 3.
Reference Docket No. CP05-392-000.
Mail your comments so that they will be received in
Washington, DC on or before November 7, 2005.
Please note that we are continuing to experience delays in mail
deliveries from the U.S. Postal Service. As a result, we will include
all comments that we receive within a reasonable time frame in our
environmental analysis of this project. However, the Commission
strongly encourages electronic filing of any comments or interventions
or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site at https://www.ferc.gov under
the ``e-Filing'' link and the link to the User's Guide. Before you can
file comments you will need to create a free account which can be
created on-line.
We may mail the EA for comment. If you are interested in receiving
it, please return the Information Request (Appendix 3). If you do not
return the Information Request, you will be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding, or ``intervenor''. To
become an intervenor you must file a motion to intervene according to
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214). Intervenors have the right to seek rehearing of the
Commission's decision. Motions to Intervene should be electronically
submitted using the Commission's eFiling system at https://www.ferc.gov.
Persons without Internet access should send an original and 14 copies
of their motion to the Secretary of the Commission at the address
indicated previously. Persons filing Motions to Intervene on or before
the comment deadline indicated above must send a copy of the motion to
the Applicant. All filings, including late interventions, submitted
after the comment deadline must be served on the Applicant and all
other intervenors identified on the Commission's service list for this
proceeding. Persons on the service list with email addresses may be
served electronically; others must be served a hard copy of the filing.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who are
potential right-of-way grantors, whose property may be used temporarily
for project purposes, or who own homes within distances defined in the
Commission's regulations of certain aboveground facilities. By this
notice we are also asking governmental agencies, especially those in
Appendix 2, to express their interest in becoming cooperating agencies
for the preparation of the EA.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E5-5654 Filed 10-14-05; 8:45 am]