Dominion Transmission, Inc.; Notice of Proposed Changes in FERC Gas Tariff, 59739-59740 [E5-5624]

Download as PDF Federal Register / Vol. 70, No. 197 / Thursday, October 13, 2005 / Notices Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–5641 Filed 10–12–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER05–1326–000 and ER05– 1326–001] CornerStone Energy General Partners, LLC; Notice of Issuance of Order October 5, 2005. CornerStone Energy General Partners, LLC (CornerStone) filed an application for market-based rate authority, with an accompanying rate tariff. The proposed rate tariff provides for the sales of capacity and energy at market-based rates and the re-sale of firm VerDate Aug<31>2005 16:14 Oct 12, 2005 Jkt 208001 transmission rights. CornerStone also requested waiver of various Commission regulations. In particular, CornerStone requested that the Commission grant blanket approval under 18 CFR part 34 of all future issuances of securities and assumptions of liability by CornerStone. On September 30, 2005, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—South, granted the request for blanket approval under Part 34. The Director’s order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard or to protest the blanket approval of issuances of securities or assumptions of liability by CornerStone should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protests is October 31, 2005. Absent a request to be heard in opposition by the deadline above, CornerStone is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of CornerStone, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approval of CornerStone’s issuances of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https:// www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 59739 ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E5–5620 Filed 10–12–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–685–000] Dominion Transmission, Inc.; Notice of Proposed Changes in FERC Gas Tariff October 5, 2005. Take notice that on September 30, 2005, Dominion Transmission Inc. (DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff sheets, to become effective November 1, 2005: Twenty-Seventh Revised Sheet No. 31 Third Revised Sheet No. 31A Thirtieth Revised Sheet No. 32 Third Revised Sheet No. 32A Seventeenth Revised Sheet No. 34 Second Revised Sheet No. 34A Twenty-Third Revised Sheet No. 35 Third Revised Sheet No. 35A Fifteenth Revised Sheet No. 39 Third Revised Sheet No. 39A Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\13OCN1.SGM 13OCN1 59740 Federal Register / Vol. 70, No. 197 / Thursday, October 13, 2005 / Notices This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–5624 Filed 10–12–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–692–000] Dominion Transmission, Inc.; Notice of Proposed Changes in FERC Gas Tariff October 5, 2005. Take notice that on September 30, 2005, Dominion Transmission, Inc. (DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff sheets, to become effective November 1, 2005: Twenty-Sixth Revised Sheet No. 31, Second Revised Sheet No. 31A, Twenty-Ninth Revised Sheet No. 32, Second Revised Sheet No. 32A, Sixteenth Revised Sheet No. 34, First Revised Sheet No. 34A, Twenty-Second Revised Sheet No. 35, Second Revised Sheet No. 35A, Fourteenth Revised Sheet No. 39, Second Revised Sheet No. 39A. 16:14 Oct 12, 2005 Jkt 208001 Magalie R. Salas, Secretary. [FR Doc. E5–5642 Filed 10–12–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER05–1122–000 and ER05– 1122–001] DTI states that the purpose of this filing is to update DTI’s effective Electric Power Cost Adjustment (EPCA), through the mechanism described in section 17 of the general terms and conditions of DTI’s tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR VerDate Aug<31>2005 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. FirstEnergy Nuclear Generation; Notice of Issuance of Order October 5, 2005. FirstEnergy Nuclear Generation (Nuclear Genco) filed an application for market-based rate authority, with an accompanying rate tariff. The proposed rate tariff provides for the sales of energy, capacity and the reassignment of transmission capacity. Nuclear Genco also requested waiver of various Commission regulations. In particular, Nuclear Genco requested that the Commission grant blanket approval under 18 CFR part 34 of all future issuances of securities and assumptions of liability by Nuclear Genco. On September 29, 2005, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—South, granted the request for blanket approval under Part PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 34. The Director’s order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard or to protest the blanket approval of issuances of securities or assumptions of liability by Nuclear Genco should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protests is October 31, 2005. Absent a request to be heard in opposition by the deadline above, Nuclear Genco is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Nuclear Genco, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approval of Nuclear Genco’s issuances of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E5–5630 Filed 10–12–05; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\13OCN1.SGM 13OCN1

Agencies

[Federal Register Volume 70, Number 197 (Thursday, October 13, 2005)]
[Notices]
[Pages 59739-59740]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5624]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP05-685-000]


Dominion Transmission, Inc.; Notice of Proposed Changes in FERC 
Gas Tariff

October 5, 2005.

    Take notice that on September 30, 2005, Dominion Transmission Inc. 
(DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised 
Volume No. 1, the following tariff sheets, to become effective November 
1, 2005:

Twenty-Seventh Revised Sheet No. 31
Third Revised Sheet No. 31A
Thirtieth Revised Sheet No. 32
Third Revised Sheet No. 32A
Seventeenth Revised Sheet No. 34
Second Revised Sheet No. 34A
Twenty-Third Revised Sheet No. 35
Third Revised Sheet No. 35A
Fifteenth Revised Sheet No. 39
Third Revised Sheet No. 39A

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.

[[Page 59740]]

    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-5624 Filed 10-12-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.