Environmental Impacts Statements; Notice of Availability, 58699-58700 [05-20208]

Download as PDF Federal Register / Vol. 70, No. 194 / Friday, October 7, 2005 / Notices Washington, Windham and Windsor Counties, VT. Summary: EPA has no objections to the proposed project, but supports alternatives C, D or E as those that best address resource protection. Rating LO EIS No. 20050226, ERP No. D–FHW– B40095–RI, U.S. Route 6/Route 10 Interchange Improvement Project, To Identify Transportation Alternative, Funding, City of Providence, Providence County, RI. Summary: EPA has environmental concerns about the impacts to water and air quality as well as environmental justice issues. Rating EC2 EIS No. 20050247, ERP No. D–SFW– K64025–AZ, Cabeza Prieta National Wildlife Refuge, Comprehensive Conservation Plan, Wilderness Stewardship Plan, Implementation, Ajo, AZ. Summary: EPA has no objection to the proposed project. Rating LO EIS No. 20050256, ERP No. D–AFS– J65446–MT, Beaverhead-Deerlodge National Forest Draft Revised Land and Resource Management Plan, Implementation, Beaverhead, ButteSilver Bow, Deerlodge, Granite, Jefferson, Madison Counties, MT. Summary: EPA generally supports the forestwide aquatic strategy, watershed restoration and revised management practices. However, EPA expressed environmental concerns about continued impacts to water quality, the level of watershed protection and restoration, management direction for roads and other resources, and environmental protection management measures. Rating EC2 EIS No. 20050301, ERP No. D–FAA– A12043–00, PROGRAMMATIC— Horizontal Launch and Reentry of Reentry Vehicles, Facilitate the Issuance of Licenses in United States. Summary: EPA has no objection to the proposed action. Rating LO EIS No. 20050315, ERP No. D–AFS– J65449–UT, Fishlake National Forest Off-Highway Vehicle Route Designation Project, Proposes to Designate a System of Motorized Road, Trails, and Areas to Revise and Update the Existing Motorized Travel Plan, UT. Summary: EPA expressed environmental concerns about the VerDate Aug<31>2005 18:27 Oct 06, 2005 Jkt 208001 preferred alternative because of potential adverse impacts to source water, streams and water quality, wetlands and aquatic resources. EPA supports the transition from unmanaged motorized recreation to restricted travel and suggests the final EIS include specific analyses of the direct, indirect and cumulative impacts of this proposed plan. Rating EC2 EIS No. 20050240, ERP No. DS–FTA– B54007–WA, Silver Line Phase III (previously known as South Boston Pier) Project, Updated Information to Physically Integrate Silver Line Phase I and II, Massachusetts Bay Transportation Authority’s, Funding, MA. Summary: EPA has no objections to the proposed project. Rating LO Final EISs EIS No. 20050341, ERP No. F–COE– G32058–00, Arkansas River Navigation Study, To Maintain and Improve the Navigation Channel in Order to Enhance Commercial Navigation on the McCellan Kerr Arkansa River Navigation System (MKARNS), Several Counties, AR and Several Counties, OK. Summary: No formal comment letter was sent to the preparing agency. Dated: October 4, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–20207 Filed 10–6–05; 8:45 am] BILLING CODE 6560–50–U ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6668–1] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 09/26/2005 Through 09/30/2005 Pursuant to 40 CFR 1506.9. EIS No. 20050401, Draft Supplement, SFW, CA, Southern Sea Otters (Enhydra lutris nereis) Translocation Program, New and Updated Information, San Nicolas Island, Southern California Bight, CA, Comment Period Ends: 01/05/2006, Contact: Greg Sander 805–644–1766 Ext. 315. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 58699 EIS No. 20050402, Final EIS, FHW, UT, Iron County Transportation Corridors, Construction from Station Road 56 to Exit 51 on Interstate 15, Funding and Right-of-Way Grant, Southwest of the Cedar City Limits, Iron County, UT, Wait Period Ends: 11/07/2005, Contact: Gregory S. Punske 801–963– 0182. EIS No. 20050403, Final EIS, AFS, CA, Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Feather River Ranger District, Plumas National Forest, Butte and Plumas Counties, CA, Wait Period Ends: 11/ 07/2005, Contact: Susan Joyce 530– 532–6500. EIS No. 20050404, Draft EIS, DOI, OH, First Ladies National Historic Site General Management Plan, Implementation, Canton, OH, Comment Period Ends: 11/30/2005, Contact: Nick Chevance 402–661– 1844. EIS No. 20050405, Draft EIS, NPS, NV, Clean Water Coalition Systems Conveyance and Operations Program, Construction, Operation and Maintenance, City of Las Vegas, City County, NV, Comment Period Ends: 12/06/2005, Contact: Michael Boyles 702–293–8978. EIS No. 20050406, Draft EIS, FHW, WA, South Park Bridge Project, Proposes to Rehabilitate or Replace the Historic South Park Ridge over the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard Permit and U.S. Army COE Section 10 and 404 Permits, King County, WA, Comment Period Ends: , 11/21/2005, Contact: Jim Leonard 360–753–9408. EIS No. 20050407, Final EIS, NPS, AZ, Saguaro National Park Fire Management Plan, Implementation, Tucson, AZ, Wait Period Ends: 11/07/ 2005, Contact: Sarah Craighead 520– 733–5101. EIS No. 20050408, Final EIS, FHW, WI, US 41 Highway Corridor Project, Transportation Improvement between the Cities of Oconto and Perhtigo, Funding, Marinette and Oconto Counties, WI, Wait Period Ends: 11/ 07/2005, Contact: Johhny Gerbitz 608–829–7500. EIS No. 20050409, Final EIS, AFS, OR, Joseph Creek Rangeland Analysis Project, Proposal to Allocate Forage for Commercial Livestock Grazing on Eleven Allotment, Wallowa-Whitman National Forests, Wallowa Valley Ranger District, Wallowa County, OR, Wait Period Ends: 11/07/2005, Contact: Alicia Glassford 541–426– 5689. EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San E:\FR\FM\07OCN1.SGM 07OCN1 58700 Federal Register / Vol. 70, No. 194 / Friday, October 7, 2005 / Notices Joaquin Division, Long-Term Water Service Contract Renewal, Cities of Avenal, Coalinga and Huron, Fresno, King and Merced Counties, CA, Comment Period Ends: 11/25/2005, Contact: Joe Thompson 559–487– 5179. EIS No. 20050412, Final EIS, FHW, UT, US 6 Highway Project, Improvements from Interstate 15 (I–15) in Spanish Fork to Interstate (I–70) near Green River, Funding, Right-of-Way Permit and U.S. Army COE Section 404 Permit, Utah, Wasatch, Carbon, Emery Counties, UT, Wait Period Ends: 11/ 07/2005, Contact: Jeff Berna 801–963– 0182. EIS No. 20050413, Draft Supplement, FHW, NC, NC 12 Replacement of Herbert C. Bonner Bridge (Bridge No. 11 ) New and Updated Information, over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit, Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and 404 Permit, Dare County, NC , Comment Period Ends: 11/23/2005, Contact: John F. Sullivan 919–856– 4346. EIS No. 20050414, Draft EIS, NRC, NY, Generic—License Renewal of Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2, Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego County, NY, Comment Period Ends: 12/22/2005, Contact: Leslie C. Fields 301–415– 1186. EIS No. 20050415, Draft EIS, FRA, PA, Pennsylvania High-Speed Maglev Project, Construction between Pittsburgh International Airport (PIA) and Greensburg Area, The Pennsylvania Project of Magnetic Levitation Transportation Technology Deployment Program, Allegheny and Westmoreland Counties, PA, Comment Period Ends: 12/06/2005, Contact: David Valenstein 202–493– 6368. EIS No. 20050416, Draft EIS, NOA, TX, PROGRAMMATIC—Texas National Estuarine Research Reserve and Management Plan, Mission-Aransas Estuary, Site Designation, Federal Approval, TX, Comment Period Ends:11/23/2005, Contact: Laurie McGilvray 301–563–1158. EIS No. 20050417, Final Supplement, COE, MD, Poplar Island Environmental Restoration Project, Habitat Restoration and Dredged Material Capacity, Chesapeake Bay, Talbot County, MD, Wait Period Ends: 11/07/2005, Contact: Mark Mendelsohn 410–962–9466. VerDate Aug<31>2005 18:27 Oct 06, 2005 Jkt 208001 Dated: October 4, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–20208 Filed 10–6–05; 8:45 am] BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION [Report No. AUC–05–64–A (Auction No. 64); DA 05–2423] Television Station Construction Permits Federal Communications Commission. ACTION: Notice. AGENCY: Printing, Inc. (BCPI), Portals II, 445 12th Street, SW., Room CY–B402, Washington, DC, 20554, telephone 202– 488–5300, facsimile 202–488–5563, or BCPI Web site: https:// www.BCPIWEB.com. When ordering documents from BCPI, please provide the appropriate FCC document number, for example, DA 05–2423 for the Auction No. 64 Comment Public Notice. The Auction No. 64 Comment Public Notice and related documents are also available on the Internet at the Commission’s Web site: https:// wireless.fcc.gov/auctions/64/. I. Television Construction Permits in Auction No. 64 A. Open Construction Permits 1. By the Auction No. 64 Comment SUMMARY: This document announces the Public Notice, the Wireless auction of 11 full power television Telecommunications Bureau and the station construction permits scheduled Media Bureau (collectively referred to as to commence on March 15, 2006 the Bureaus) announce that the ten (Auction No. 64). This document also construction permits listed in seeks comments on reserve prices or Attachment A of the Auction No. 64 minimum opening bids and other Comment Public Notice as open are procedures for Auction No. 64. available to any interested party. Longform applications (FCC Forms 301) were DATES: Comments are due on or before filed previously for some of these October 14, 2005, and reply comments stations. The pending applications for are due on or before October 21, 2005. these stations are listed in Attachment ADDRESSES: Comments and reply A of the Auction No. 64 Comment comments must be sent by electronic Public Notice. Any party filing for a mail to the following address: auction64@fcc.gov. Parties who file also station with a pending application should understand that it is likely that by paper must file an original and four copies of each filing. U.S. Postal Service its application will be mutually first class, express or priority mail must exclusive with the previously-filed application. Even if there is no pending be addressed to the Office of the long-form application for a station listed Secretary, 445 12th Street, SW., in Attachment A of the Auction No. 64 Washington, DC 20054. Comment Public Notice, applicants FOR FURTHER INFORMATION CONTACT: For specifying the same construction permit legal questions: Lynne Milne at (202) will be considered mutually exclusive 418–0660. For general auction for auction purposes. Once mutual questions: Debbie Smith or Lisa Stover exclusivity exists for auction purposes, at (717) 338–2888. For service rule even if only one applicant for the same questions: Shaun Maher at (202) 418– construction permit in Auction No. 64 2324 or Shaleim Henry at (202) 418– submits an upfront payment, that 1600. applicant is required to submit a bid in SUPPLEMENTARY INFORMATION: This is a order to obtain the construction permit. summary of the Auction No. 64 Any applicant that submits a short-form Comment Public Notice released on application that is accepted for filing September 23, 2005. The complete text but fails to timely submit an upfront of the Auction No. 64 Comment Public payment will retain its status as an Notice, including attachments and any applicant in Auction No. 64 and will related Commission documents, is remain subject to the Commission’s available for public inspection and anti-collusion rule, 47 CFR 1.2105(c), copying from 8 a.m. to 4:30 p.m. but, having purchased no bidding Monday through Thursday or from 8 eligibility, will not be eligible to bid. 2. The Commission’s competitive a.m. to 11:30 a.m. on Friday at the FCC Reference Information Center, Portals II, bidding rules will be used to select among mutually exclusive applicants 445 12th Street, SW., Room CY–A257, Washington, DC 20554. The Auction No. for these 10 construction permits in Auction No. 64. Those wishing to 64 Comment Public Notice and related participate in the auction, including Commission documents may also be those entities listed in Attachment A of purchased from the Commission’s the Auction No. 64 Comment Public duplicating contractor, Best Copy and PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\07OCN1.SGM 07OCN1

Agencies

[Federal Register Volume 70, Number 194 (Friday, October 7, 2005)]
[Notices]
[Pages 58699-58700]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-20208]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6668-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/26/2005 Through 09/30/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050401, Draft Supplement, SFW, CA, Southern Sea Otters 
(Enhydra lutris nereis) Translocation Program, New and Updated 
Information, San Nicolas Island, Southern California Bight, CA, Comment 
Period Ends: 01/05/2006, Contact: Greg Sander 805-644-1766 Ext. 315.
EIS No. 20050402, Final EIS, FHW, UT, Iron County Transportation 
Corridors, Construction from Station Road 56 to Exit 51 on Interstate 
15, Funding and Right-of-Way Grant, Southwest of the Cedar City Limits, 
Iron County, UT, Wait Period Ends: 11/07/2005, Contact: Gregory S. 
Punske 801-963-0182.
EIS No. 20050403, Final EIS, AFS, CA, Watdog Project, Proposes to 
Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, 
Feather River Ranger District, Plumas National Forest, Butte and Plumas 
Counties, CA, Wait Period Ends: 11/07/2005, Contact: Susan Joyce 530-
532-6500.
EIS No. 20050404, Draft EIS, DOI, OH, First Ladies National Historic 
Site General Management Plan, Implementation, Canton, OH, Comment 
Period Ends: 11/30/2005, Contact: Nick Chevance 402-661-1844.
EIS No. 20050405, Draft EIS, NPS, NV, Clean Water Coalition Systems 
Conveyance and Operations Program, Construction, Operation and 
Maintenance, City of Las Vegas, City County, NV, Comment Period Ends: 
12/06/2005, Contact: Michael Boyles 702-293-8978.
EIS No. 20050406, Draft EIS, FHW, WA, South Park Bridge Project, 
Proposes to Rehabilitate or Replace the Historic South Park Ridge over 
the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard Permit and 
U.S. Army COE Section 10 and 404 Permits, King County, WA, Comment 
Period Ends: , 11/21/2005, Contact: Jim Leonard 360-753-9408.
EIS No. 20050407, Final EIS, NPS, AZ, Saguaro National Park Fire 
Management Plan, Implementation, Tucson, AZ, Wait Period Ends: 11/07/
2005, Contact: Sarah Craighead 520-733-5101.
EIS No. 20050408, Final EIS, FHW, WI, US 41 Highway Corridor Project, 
Transportation Improvement between the Cities of Oconto and Perhtigo, 
Funding, Marinette and Oconto Counties, WI, Wait Period Ends: 11/07/
2005, Contact: Johhny Gerbitz 608-829-7500.
EIS No. 20050409, Final EIS, AFS, OR, Joseph Creek Rangeland Analysis 
Project, Proposal to Allocate Forage for Commercial Livestock Grazing 
on Eleven Allotment, Wallowa-Whitman National Forests, Wallowa Valley 
Ranger District, Wallowa County, OR, Wait Period Ends: 11/07/2005, 
Contact: Alicia Glassford 541-426-5689.
EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San

[[Page 58700]]

Joaquin Division, Long-Term Water Service Contract Renewal, Cities of 
Avenal, Coalinga and Huron, Fresno, King and Merced Counties, CA, 
Comment Period Ends: 11/25/2005, Contact: Joe Thompson 559-487-5179.
EIS No. 20050412, Final EIS, FHW, UT, US 6 Highway Project, 
Improvements from Interstate 15 (I-15) in Spanish Fork to Interstate 
(I-70) near Green River, Funding, Right-of-Way Permit and U.S. Army COE 
Section 404 Permit, Utah, Wasatch, Carbon, Emery Counties, UT, Wait 
Period Ends: 11/07/2005, Contact: Jeff Berna 801-963-0182.
EIS No. 20050413, Draft Supplement, FHW, NC, NC 12 Replacement of 
Herbert C. Bonner Bridge (Bridge No. 11 ) New and Updated Information, 
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit, 
Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and 
404 Permit, Dare County, NC , Comment Period Ends: 11/23/2005, Contact: 
John F. Sullivan 919-856-4346.
EIS No. 20050414, Draft EIS, NRC, NY, Generic--License Renewal of 
Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2, 
Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego 
County, NY, Comment Period Ends: 12/22/2005, Contact: Leslie C. Fields 
301-415-1186.
EIS No. 20050415, Draft EIS, FRA, PA, Pennsylvania High-Speed Maglev 
Project, Construction between Pittsburgh International Airport (PIA) 
and Greensburg Area, The Pennsylvania Project of Magnetic Levitation 
Transportation Technology Deployment Program, Allegheny and 
Westmoreland Counties, PA, Comment Period Ends: 12/06/2005, Contact: 
David Valenstein 202-493-6368.
EIS No. 20050416, Draft EIS, NOA, TX, PROGRAMMATIC--Texas National 
Estuarine Research Reserve and Management Plan, Mission-Aransas 
Estuary, Site Designation, Federal Approval, TX, Comment Period 
Ends:11/23/2005, Contact: Laurie McGilvray 301-563-1158.
EIS No. 20050417, Final Supplement, COE, MD, Poplar Island 
Environmental Restoration Project, Habitat Restoration and Dredged 
Material Capacity, Chesapeake Bay, Talbot County, MD, Wait Period Ends: 
11/07/2005, Contact: Mark Mendelsohn 410-962-9466.

    Dated: October 4, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-20208 Filed 10-6-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.