Environmental Impacts Statements; Notice of Availability, 58699-58700 [05-20208]
Download as PDF
Federal Register / Vol. 70, No. 194 / Friday, October 7, 2005 / Notices
Washington, Windham and Windsor
Counties, VT.
Summary: EPA has no objections to
the proposed project, but supports
alternatives C, D or E as those that best
address resource protection.
Rating LO
EIS No. 20050226, ERP No. D–FHW–
B40095–RI, U.S. Route 6/Route 10
Interchange Improvement Project, To
Identify Transportation Alternative,
Funding, City of Providence,
Providence County, RI.
Summary: EPA has environmental
concerns about the impacts to water and
air quality as well as environmental
justice issues.
Rating EC2
EIS No. 20050247, ERP No. D–SFW–
K64025–AZ, Cabeza Prieta National
Wildlife Refuge, Comprehensive
Conservation Plan, Wilderness
Stewardship Plan, Implementation,
Ajo, AZ.
Summary: EPA has no objection to the
proposed project.
Rating LO
EIS No. 20050256, ERP No. D–AFS–
J65446–MT, Beaverhead-Deerlodge
National Forest Draft Revised Land
and Resource Management Plan,
Implementation, Beaverhead, ButteSilver Bow, Deerlodge, Granite,
Jefferson, Madison Counties, MT.
Summary: EPA generally supports the
forestwide aquatic strategy, watershed
restoration and revised management
practices. However, EPA expressed
environmental concerns about
continued impacts to water quality, the
level of watershed protection and
restoration, management direction for
roads and other resources, and
environmental protection management
measures.
Rating EC2
EIS No. 20050301, ERP No. D–FAA–
A12043–00, PROGRAMMATIC—
Horizontal Launch and Reentry of
Reentry Vehicles, Facilitate the
Issuance of Licenses in United States.
Summary: EPA has no objection to the
proposed action.
Rating LO
EIS No. 20050315, ERP No. D–AFS–
J65449–UT, Fishlake National Forest
Off-Highway Vehicle Route
Designation Project, Proposes to
Designate a System of Motorized
Road, Trails, and Areas to Revise and
Update the Existing Motorized Travel
Plan, UT.
Summary: EPA expressed
environmental concerns about the
VerDate Aug<31>2005
18:27 Oct 06, 2005
Jkt 208001
preferred alternative because of
potential adverse impacts to source
water, streams and water quality,
wetlands and aquatic resources. EPA
supports the transition from unmanaged
motorized recreation to restricted travel
and suggests the final EIS include
specific analyses of the direct, indirect
and cumulative impacts of this
proposed plan.
Rating EC2
EIS No. 20050240, ERP No. DS–FTA–
B54007–WA, Silver Line Phase III
(previously known as South Boston
Pier) Project, Updated Information to
Physically Integrate Silver Line Phase
I and II, Massachusetts Bay
Transportation Authority’s, Funding,
MA.
Summary: EPA has no objections to
the proposed project.
Rating LO
Final EISs
EIS No. 20050341, ERP No. F–COE–
G32058–00, Arkansas River
Navigation Study, To Maintain and
Improve the Navigation Channel in
Order to Enhance Commercial
Navigation on the McCellan Kerr
Arkansa River Navigation System
(MKARNS), Several Counties, AR and
Several Counties, OK.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: October 4, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–20207 Filed 10–6–05; 8:45 am]
BILLING CODE 6560–50–U
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6668–1]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/26/2005 Through 09/30/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050401, Draft Supplement,
SFW, CA, Southern Sea Otters
(Enhydra lutris nereis) Translocation
Program, New and Updated
Information, San Nicolas Island,
Southern California Bight, CA,
Comment Period Ends: 01/05/2006,
Contact: Greg Sander 805–644–1766
Ext. 315.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
58699
EIS No. 20050402, Final EIS, FHW, UT,
Iron County Transportation Corridors,
Construction from Station Road 56 to
Exit 51 on Interstate 15, Funding and
Right-of-Way Grant, Southwest of the
Cedar City Limits, Iron County, UT,
Wait Period Ends: 11/07/2005,
Contact: Gregory S. Punske 801–963–
0182.
EIS No. 20050403, Final EIS, AFS, CA,
Watdog Project, Proposes to Reduce
Fire Hazards, Harvest Trees, Using
Group Selection Methods, Feather
River Ranger District, Plumas
National Forest, Butte and Plumas
Counties, CA, Wait Period Ends: 11/
07/2005, Contact: Susan Joyce 530–
532–6500.
EIS No. 20050404, Draft EIS, DOI, OH,
First Ladies National Historic Site
General Management Plan,
Implementation, Canton, OH,
Comment Period Ends: 11/30/2005,
Contact: Nick Chevance 402–661–
1844.
EIS No. 20050405, Draft EIS, NPS, NV,
Clean Water Coalition Systems
Conveyance and Operations Program,
Construction, Operation and
Maintenance, City of Las Vegas, City
County, NV, Comment Period Ends:
12/06/2005, Contact: Michael Boyles
702–293–8978.
EIS No. 20050406, Draft EIS, FHW, WA,
South Park Bridge Project, Proposes to
Rehabilitate or Replace the Historic
South Park Ridge over the Duwamish
Waterway at 14th/16 Avenue S, U.S.
Coast Guard Permit and U.S. Army
COE Section 10 and 404 Permits, King
County, WA, Comment Period Ends: ,
11/21/2005, Contact: Jim Leonard
360–753–9408.
EIS No. 20050407, Final EIS, NPS, AZ,
Saguaro National Park Fire
Management Plan, Implementation,
Tucson, AZ, Wait Period Ends: 11/07/
2005, Contact: Sarah Craighead 520–
733–5101.
EIS No. 20050408, Final EIS, FHW, WI,
US 41 Highway Corridor Project,
Transportation Improvement between
the Cities of Oconto and Perhtigo,
Funding, Marinette and Oconto
Counties, WI, Wait Period Ends: 11/
07/2005, Contact: Johhny Gerbitz
608–829–7500.
EIS No. 20050409, Final EIS, AFS, OR,
Joseph Creek Rangeland Analysis
Project, Proposal to Allocate Forage
for Commercial Livestock Grazing on
Eleven Allotment, Wallowa-Whitman
National Forests, Wallowa Valley
Ranger District, Wallowa County, OR,
Wait Period Ends: 11/07/2005,
Contact: Alicia Glassford 541–426–
5689.
EIS No. 20050411, Draft EIS, IBR, CA,
Central Valley Project, West San
E:\FR\FM\07OCN1.SGM
07OCN1
58700
Federal Register / Vol. 70, No. 194 / Friday, October 7, 2005 / Notices
Joaquin Division, Long-Term Water
Service Contract Renewal, Cities of
Avenal, Coalinga and Huron, Fresno,
King and Merced Counties, CA,
Comment Period Ends: 11/25/2005,
Contact: Joe Thompson 559–487–
5179.
EIS No. 20050412, Final EIS, FHW, UT,
US 6 Highway Project, Improvements
from Interstate 15 (I–15) in Spanish
Fork to Interstate (I–70) near Green
River, Funding, Right-of-Way Permit
and U.S. Army COE Section 404
Permit, Utah, Wasatch, Carbon, Emery
Counties, UT, Wait Period Ends: 11/
07/2005, Contact: Jeff Berna 801–963–
0182.
EIS No. 20050413, Draft Supplement,
FHW, NC, NC 12 Replacement of
Herbert C. Bonner Bridge (Bridge No.
11 ) New and Updated Information,
over Oregon Inlet Construction,
Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way
Permit, U.S. Army COE Section 10
and 404 Permit, Dare County, NC ,
Comment Period Ends: 11/23/2005,
Contact: John F. Sullivan 919–856–
4346.
EIS No. 20050414, Draft EIS, NRC, NY,
Generic—License Renewal of Nuclear
Plants for Nine Mile Point Nuclear
Station, Units 1 and 2, Supplement 24
to NUREG 1437, Implementation,
Lake Ontario, Oswego County, NY,
Comment Period Ends: 12/22/2005,
Contact: Leslie C. Fields 301–415–
1186.
EIS No. 20050415, Draft EIS, FRA, PA,
Pennsylvania High-Speed Maglev
Project, Construction between
Pittsburgh International Airport (PIA)
and Greensburg Area, The
Pennsylvania Project of Magnetic
Levitation Transportation Technology
Deployment Program, Allegheny and
Westmoreland Counties, PA,
Comment Period Ends: 12/06/2005,
Contact: David Valenstein 202–493–
6368.
EIS No. 20050416, Draft EIS, NOA, TX,
PROGRAMMATIC—Texas National
Estuarine Research Reserve and
Management Plan, Mission-Aransas
Estuary, Site Designation, Federal
Approval, TX, Comment Period
Ends:11/23/2005, Contact: Laurie
McGilvray 301–563–1158.
EIS No. 20050417, Final Supplement,
COE, MD, Poplar Island
Environmental Restoration Project,
Habitat Restoration and Dredged
Material Capacity, Chesapeake Bay,
Talbot County, MD, Wait Period Ends:
11/07/2005, Contact: Mark
Mendelsohn 410–962–9466.
VerDate Aug<31>2005
18:27 Oct 06, 2005
Jkt 208001
Dated: October 4, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–20208 Filed 10–6–05; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION
[Report No. AUC–05–64–A (Auction No. 64);
DA 05–2423]
Television Station Construction
Permits
Federal Communications
Commission.
ACTION: Notice.
AGENCY:
Printing, Inc. (BCPI), Portals II, 445 12th
Street, SW., Room CY–B402,
Washington, DC, 20554, telephone 202–
488–5300, facsimile 202–488–5563, or
BCPI Web site: https://
www.BCPIWEB.com. When ordering
documents from BCPI, please provide
the appropriate FCC document number,
for example, DA 05–2423 for the
Auction No. 64 Comment Public Notice.
The Auction No. 64 Comment Public
Notice and related documents are also
available on the Internet at the
Commission’s Web site: https://
wireless.fcc.gov/auctions/64/.
I. Television Construction Permits in
Auction No. 64
A. Open Construction Permits
1. By the Auction No. 64 Comment
SUMMARY: This document announces the Public Notice, the Wireless
auction of 11 full power television
Telecommunications Bureau and the
station construction permits scheduled
Media Bureau (collectively referred to as
to commence on March 15, 2006
the Bureaus) announce that the ten
(Auction No. 64). This document also
construction permits listed in
seeks comments on reserve prices or
Attachment A of the Auction No. 64
minimum opening bids and other
Comment Public Notice as open are
procedures for Auction No. 64.
available to any interested party. Longform applications (FCC Forms 301) were
DATES: Comments are due on or before
filed previously for some of these
October 14, 2005, and reply comments
stations. The pending applications for
are due on or before October 21, 2005.
these stations are listed in Attachment
ADDRESSES: Comments and reply
A of the Auction No. 64 Comment
comments must be sent by electronic
Public Notice. Any party filing for a
mail to the following address:
auction64@fcc.gov. Parties who file also station with a pending application
should understand that it is likely that
by paper must file an original and four
copies of each filing. U.S. Postal Service its application will be mutually
first class, express or priority mail must exclusive with the previously-filed
application. Even if there is no pending
be addressed to the Office of the
long-form application for a station listed
Secretary, 445 12th Street, SW.,
in Attachment A of the Auction No. 64
Washington, DC 20054.
Comment Public Notice, applicants
FOR FURTHER INFORMATION CONTACT: For
specifying the same construction permit
legal questions: Lynne Milne at (202)
will be considered mutually exclusive
418–0660. For general auction
for auction purposes. Once mutual
questions: Debbie Smith or Lisa Stover
exclusivity exists for auction purposes,
at (717) 338–2888. For service rule
even if only one applicant for the same
questions: Shaun Maher at (202) 418–
construction permit in Auction No. 64
2324 or Shaleim Henry at (202) 418–
submits an upfront payment, that
1600.
applicant is required to submit a bid in
SUPPLEMENTARY INFORMATION: This is a
order to obtain the construction permit.
summary of the Auction No. 64
Any applicant that submits a short-form
Comment Public Notice released on
application that is accepted for filing
September 23, 2005. The complete text
but fails to timely submit an upfront
of the Auction No. 64 Comment Public
payment will retain its status as an
Notice, including attachments and any
applicant in Auction No. 64 and will
related Commission documents, is
remain subject to the Commission’s
available for public inspection and
anti-collusion rule, 47 CFR 1.2105(c),
copying from 8 a.m. to 4:30 p.m.
but, having purchased no bidding
Monday through Thursday or from 8
eligibility, will not be eligible to bid.
2. The Commission’s competitive
a.m. to 11:30 a.m. on Friday at the FCC
Reference Information Center, Portals II, bidding rules will be used to select
among mutually exclusive applicants
445 12th Street, SW., Room CY–A257,
Washington, DC 20554. The Auction No. for these 10 construction permits in
Auction No. 64. Those wishing to
64 Comment Public Notice and related
participate in the auction, including
Commission documents may also be
those entities listed in Attachment A of
purchased from the Commission’s
the Auction No. 64 Comment Public
duplicating contractor, Best Copy and
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 70, Number 194 (Friday, October 7, 2005)]
[Notices]
[Pages 58699-58700]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-20208]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6668-1]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/26/2005 Through 09/30/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050401, Draft Supplement, SFW, CA, Southern Sea Otters
(Enhydra lutris nereis) Translocation Program, New and Updated
Information, San Nicolas Island, Southern California Bight, CA, Comment
Period Ends: 01/05/2006, Contact: Greg Sander 805-644-1766 Ext. 315.
EIS No. 20050402, Final EIS, FHW, UT, Iron County Transportation
Corridors, Construction from Station Road 56 to Exit 51 on Interstate
15, Funding and Right-of-Way Grant, Southwest of the Cedar City Limits,
Iron County, UT, Wait Period Ends: 11/07/2005, Contact: Gregory S.
Punske 801-963-0182.
EIS No. 20050403, Final EIS, AFS, CA, Watdog Project, Proposes to
Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods,
Feather River Ranger District, Plumas National Forest, Butte and Plumas
Counties, CA, Wait Period Ends: 11/07/2005, Contact: Susan Joyce 530-
532-6500.
EIS No. 20050404, Draft EIS, DOI, OH, First Ladies National Historic
Site General Management Plan, Implementation, Canton, OH, Comment
Period Ends: 11/30/2005, Contact: Nick Chevance 402-661-1844.
EIS No. 20050405, Draft EIS, NPS, NV, Clean Water Coalition Systems
Conveyance and Operations Program, Construction, Operation and
Maintenance, City of Las Vegas, City County, NV, Comment Period Ends:
12/06/2005, Contact: Michael Boyles 702-293-8978.
EIS No. 20050406, Draft EIS, FHW, WA, South Park Bridge Project,
Proposes to Rehabilitate or Replace the Historic South Park Ridge over
the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard Permit and
U.S. Army COE Section 10 and 404 Permits, King County, WA, Comment
Period Ends: , 11/21/2005, Contact: Jim Leonard 360-753-9408.
EIS No. 20050407, Final EIS, NPS, AZ, Saguaro National Park Fire
Management Plan, Implementation, Tucson, AZ, Wait Period Ends: 11/07/
2005, Contact: Sarah Craighead 520-733-5101.
EIS No. 20050408, Final EIS, FHW, WI, US 41 Highway Corridor Project,
Transportation Improvement between the Cities of Oconto and Perhtigo,
Funding, Marinette and Oconto Counties, WI, Wait Period Ends: 11/07/
2005, Contact: Johhny Gerbitz 608-829-7500.
EIS No. 20050409, Final EIS, AFS, OR, Joseph Creek Rangeland Analysis
Project, Proposal to Allocate Forage for Commercial Livestock Grazing
on Eleven Allotment, Wallowa-Whitman National Forests, Wallowa Valley
Ranger District, Wallowa County, OR, Wait Period Ends: 11/07/2005,
Contact: Alicia Glassford 541-426-5689.
EIS No. 20050411, Draft EIS, IBR, CA, Central Valley Project, West San
[[Page 58700]]
Joaquin Division, Long-Term Water Service Contract Renewal, Cities of
Avenal, Coalinga and Huron, Fresno, King and Merced Counties, CA,
Comment Period Ends: 11/25/2005, Contact: Joe Thompson 559-487-5179.
EIS No. 20050412, Final EIS, FHW, UT, US 6 Highway Project,
Improvements from Interstate 15 (I-15) in Spanish Fork to Interstate
(I-70) near Green River, Funding, Right-of-Way Permit and U.S. Army COE
Section 404 Permit, Utah, Wasatch, Carbon, Emery Counties, UT, Wait
Period Ends: 11/07/2005, Contact: Jeff Berna 801-963-0182.
EIS No. 20050413, Draft Supplement, FHW, NC, NC 12 Replacement of
Herbert C. Bonner Bridge (Bridge No. 11 ) New and Updated Information,
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and
404 Permit, Dare County, NC , Comment Period Ends: 11/23/2005, Contact:
John F. Sullivan 919-856-4346.
EIS No. 20050414, Draft EIS, NRC, NY, Generic--License Renewal of
Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2,
Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego
County, NY, Comment Period Ends: 12/22/2005, Contact: Leslie C. Fields
301-415-1186.
EIS No. 20050415, Draft EIS, FRA, PA, Pennsylvania High-Speed Maglev
Project, Construction between Pittsburgh International Airport (PIA)
and Greensburg Area, The Pennsylvania Project of Magnetic Levitation
Transportation Technology Deployment Program, Allegheny and
Westmoreland Counties, PA, Comment Period Ends: 12/06/2005, Contact:
David Valenstein 202-493-6368.
EIS No. 20050416, Draft EIS, NOA, TX, PROGRAMMATIC--Texas National
Estuarine Research Reserve and Management Plan, Mission-Aransas
Estuary, Site Designation, Federal Approval, TX, Comment Period
Ends:11/23/2005, Contact: Laurie McGilvray 301-563-1158.
EIS No. 20050417, Final Supplement, COE, MD, Poplar Island
Environmental Restoration Project, Habitat Restoration and Dredged
Material Capacity, Chesapeake Bay, Talbot County, MD, Wait Period Ends:
11/07/2005, Contact: Mark Mendelsohn 410-962-9466.
Dated: October 4, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-20208 Filed 10-6-05; 8:45 am]
BILLING CODE 6560-50-P