Georgia Power Company; Notice of Availability of Environment Assessment, 58398 [E5-5511]

Download as PDF 58398 Federal Register / Vol. 70, No. 193 / Thursday, October 6, 2005 / Notices submits a Large Generator Interconnection Agreement among Power Partners Midwest LLC, Midwest ISO, and Interstate Power and Light Co. Filed Date: 09/26/2005. Accession Number: 20050927–0023. Comment Date: 5 p.m. Eastern Time on Monday, October 17, 2005. Docket Numbers: ER05–1509–000. Applicants: Arizona Public Service Company. Description: Arizona Public Service Co. submits a compliance filing to its Open Access Transmission Tariff in response to FERC Order 2006. Filed Date: 09/26/2005. Accession Number: 20050928–0211. Comment Date: 5 p.m. Eastern Time on Monday, October 17, 2005. Docket Numbers: ER05–926–001 Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits the Large Generator Interconnection Agreement among Okoboji Wind Farm, LLC, Midwest ISO, and Interstate Power & Light Co. Filed Date: 08/30/2005. Accession Number: 20050831–0052. Comment Date: 5 p.m. Eastern Time on Tuesday, October 11, 2005. Docket Numbers: ER05–949–001. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits its Large Generator Interconnection Agreement with Power Partners Midwest, LLC, Midwest ISO, and Northern Indiana Public Service Co. Filed Date: 08/30/2005. Accession Number: 20050831–0051. Comment Date: 5 p.m. Eastern Time on Tuesday, October 11, 2005. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern Time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other and the Applicant. VerDate Aug<31>2005 19:52 Oct 05, 2005 Jkt 208001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–5503 Filed 10–5–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [Project No. 2354–087 Georgia] Georgia Power Company; Notice of Availability of Environment Assessment September 28, 2005. An environmental assessment (EA) is available for public review. The EA was prepared for an application filed by Georgia Power Company on June 2, 2005, requesting the Commission’s authorization to permit the ClaytonRabun County Water and Sewer Authority (Authority) to increase its water withdrawal from Lake Rabun, a reservoir of the North Georgia Project, from 2.0 million gallons per day to 3.5 million gallons per day for municipal water supply. The EA evaluates the environmental impacts that would result from permitting the Authority to increase its Frm 00029 Fmt 4703 Sfmt 4703 Magalie R. Salas, Secretary. [FR Doc. E5–5511 Filed 10–5–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12514–000] Northern Indiana Public Service Company; Notice of Application READY For Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions September 30, 2005. Federal Energy Regulatory Commission PO 00000 water withdrawal from Lake Rabun, as stated above. The existing 10-inch piping from the intake pumps to the distribution main would be replaced with 16-inch piping. No significant construction activity would be required within the project boundary. The EA finds that approval of the application would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is attached to a Commission order titled ‘‘Order Approving Non-Project Use of Project Lands and Waters’’, issued September 27, 2005, and is available at the Commission’s Public Reference Room. A copy of the EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘elibrary’’ link. Enter the docket number (P–2354) in the docket number field to access the document. For assistance, call (202) 502–8222 or (202) 502–8659 (for TTY). Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: 12514–000. c. Date Filed: June 28, 2004. d. Applicant: Northern Indiana Public Service Company. e. Name of Project: Norway and Oakdale Hydroelectric Project. f. Location: On the Tippecanoe River in Carroll and White Counties, Indiana. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Jerome B. Weeden, Vice President Generation; Northern Indiana Public Service Company; 801 East 86th Avenue; Merrillville, IN 46410; (219) 647–5730. i. FERC Contact: Sergiu Serban at (202) 502–6211, or sergiu.serban@ferc.gov. E:\FR\FM\06OCN1.SGM 06OCN1

Agencies

[Federal Register Volume 70, Number 193 (Thursday, October 6, 2005)]
[Notices]
[Page 58398]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5511]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2354-087 Georgia]


Georgia Power Company; Notice of Availability of Environment 
Assessment

September 28, 2005.
    An environmental assessment (EA) is available for public review. 
The EA was prepared for an application filed by Georgia Power Company 
on June 2, 2005, requesting the Commission's authorization to permit 
the Clayton-Rabun County Water and Sewer Authority (Authority) to 
increase its water withdrawal from Lake Rabun, a reservoir of the North 
Georgia Project, from 2.0 million gallons per day to 3.5 million 
gallons per day for municipal water supply.
    The EA evaluates the environmental impacts that would result from 
permitting the Authority to increase its water withdrawal from Lake 
Rabun, as stated above. The existing 10-inch piping from the intake 
pumps to the distribution main would be replaced with 16-inch piping. 
No significant construction activity would be required within the 
project boundary. The EA finds that approval of the application would 
not constitute a major Federal action significantly affecting the 
quality of the human environment.
    A copy of the EA is attached to a Commission order titled ``Order 
Approving Non-Project Use of Project Lands and Waters'', issued 
September 27, 2005, and is available at the Commission's Public 
Reference Room. A copy of the EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``elibrary'' link. Enter the 
docket number (P-2354) in the docket number field to access the 
document. For assistance, call (202) 502-8222 or (202) 502-8659 (for 
TTY).

Magalie R. Salas,
Secretary.
 [FR Doc. E5-5511 Filed 10-5-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.