Georgia Power Company; Notice of Availability of Environment Assessment, 58398 [E5-5511]
Download as PDF
58398
Federal Register / Vol. 70, No. 193 / Thursday, October 6, 2005 / Notices
submits a Large Generator
Interconnection Agreement among
Power Partners Midwest LLC, Midwest
ISO, and Interstate Power and Light Co.
Filed Date: 09/26/2005.
Accession Number: 20050927–0023.
Comment Date: 5 p.m. Eastern Time
on Monday, October 17, 2005.
Docket Numbers: ER05–1509–000.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Co. submits a compliance filing to its
Open Access Transmission Tariff in
response to FERC Order 2006.
Filed Date: 09/26/2005.
Accession Number: 20050928–0211.
Comment Date: 5 p.m. Eastern Time
on Monday, October 17, 2005.
Docket Numbers: ER05–926–001
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits the Large Generator
Interconnection Agreement among
Okoboji Wind Farm, LLC, Midwest ISO,
and Interstate Power & Light Co.
Filed Date: 08/30/2005.
Accession Number: 20050831–0052.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 11, 2005.
Docket Numbers: ER05–949–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc
submits its Large Generator
Interconnection Agreement with Power
Partners Midwest, LLC, Midwest ISO,
and Northern Indiana Public Service Co.
Filed Date: 08/30/2005.
Accession Number: 20050831–0051.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 11, 2005.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
Time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other and the
Applicant.
VerDate Aug<31>2005
19:52 Oct 05, 2005
Jkt 208001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5503 Filed 10–5–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Project No. 2354–087 Georgia]
Georgia Power Company; Notice of
Availability of Environment
Assessment
September 28, 2005.
An environmental assessment (EA) is
available for public review. The EA was
prepared for an application filed by
Georgia Power Company on June 2,
2005, requesting the Commission’s
authorization to permit the ClaytonRabun County Water and Sewer
Authority (Authority) to increase its
water withdrawal from Lake Rabun, a
reservoir of the North Georgia Project,
from 2.0 million gallons per day to 3.5
million gallons per day for municipal
water supply.
The EA evaluates the environmental
impacts that would result from
permitting the Authority to increase its
Frm 00029
Fmt 4703
Sfmt 4703
Magalie R. Salas,
Secretary.
[FR Doc. E5–5511 Filed 10–5–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12514–000]
Northern Indiana Public Service
Company; Notice of Application
READY For Environmental Analysis
and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
September 30, 2005.
Federal Energy Regulatory
Commission
PO 00000
water withdrawal from Lake Rabun, as
stated above. The existing 10-inch
piping from the intake pumps to the
distribution main would be replaced
with 16-inch piping. No significant
construction activity would be required
within the project boundary. The EA
finds that approval of the application
would not constitute a major Federal
action significantly affecting the quality
of the human environment.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Approving Non-Project Use of Project
Lands and Waters’’, issued September
27, 2005, and is available at the
Commission’s Public Reference Room.
A copy of the EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the ‘‘elibrary’’
link. Enter the docket number (P–2354)
in the docket number field to access the
document. For assistance, call (202)
502–8222 or (202) 502–8659 (for TTY).
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 12514–000.
c. Date Filed: June 28, 2004.
d. Applicant: Northern Indiana Public
Service Company.
e. Name of Project: Norway and
Oakdale Hydroelectric Project.
f. Location: On the Tippecanoe River
in Carroll and White Counties, Indiana.
The project does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Jerome B.
Weeden, Vice President Generation;
Northern Indiana Public Service
Company; 801 East 86th Avenue;
Merrillville, IN 46410; (219) 647–5730.
i. FERC Contact: Sergiu Serban at
(202) 502–6211, or
sergiu.serban@ferc.gov.
E:\FR\FM\06OCN1.SGM
06OCN1
Agencies
[Federal Register Volume 70, Number 193 (Thursday, October 6, 2005)]
[Notices]
[Page 58398]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5511]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2354-087 Georgia]
Georgia Power Company; Notice of Availability of Environment
Assessment
September 28, 2005.
An environmental assessment (EA) is available for public review.
The EA was prepared for an application filed by Georgia Power Company
on June 2, 2005, requesting the Commission's authorization to permit
the Clayton-Rabun County Water and Sewer Authority (Authority) to
increase its water withdrawal from Lake Rabun, a reservoir of the North
Georgia Project, from 2.0 million gallons per day to 3.5 million
gallons per day for municipal water supply.
The EA evaluates the environmental impacts that would result from
permitting the Authority to increase its water withdrawal from Lake
Rabun, as stated above. The existing 10-inch piping from the intake
pumps to the distribution main would be replaced with 16-inch piping.
No significant construction activity would be required within the
project boundary. The EA finds that approval of the application would
not constitute a major Federal action significantly affecting the
quality of the human environment.
A copy of the EA is attached to a Commission order titled ``Order
Approving Non-Project Use of Project Lands and Waters'', issued
September 27, 2005, and is available at the Commission's Public
Reference Room. A copy of the EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``elibrary'' link. Enter the
docket number (P-2354) in the docket number field to access the
document. For assistance, call (202) 502-8222 or (202) 502-8659 (for
TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E5-5511 Filed 10-5-05; 8:45 am]
BILLING CODE 6717-01-P