Drawbridge Operation Regulations: Chelsea River, MA, 58057 [05-19947]
Download as PDF
Federal Register / Vol. 70, No. 192 / Wednesday, October 5, 2005 / Rules and Regulations
ACTION:
Notice of temporary deviation
from regulations.
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the drawbridge operation
regulations for the Metropolitan Avenue
Bridge, mile 3.4, across English Kills at
New York City, New York. Under this
temporary deviation the bridge may
remain in the closed position from 11
p.m. on October 21, 2005 through 6 a.m.
on October 24, 2005. This temporary
deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This deviation is effective from
October 21, 2005 through October 24,
2005.
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the drawbridge operation
regulations for the P.J. McArdle Bridge,
mile 0.3, across the Chelsea River
between East Boston and Chelsea,
Massachusetts. Under this temporary
deviation the bridge may remain closed
from 7 a.m. to 3 p.m., on October 24,
2005 and October 27, 2005. This
temporary deviation is necessary to
facilitate scheduled bridge maintenance.
DATES: This deviation is effective from
October 24, 2005 through October 27,
2005.
FOR FURTHER INFORMATION CONTACT: John
McDonald, Project Officer, First Coast
Guard District, at (617) 223–8364.
SUPPLEMENTARY INFORMATION: The P.J.
McArdle Bridge has a vertical clearance
in the closed position of 21 feet at mean
high water and 30 feet at mean low
water. The existing drawbridge
operation regulations are listed at 33
CFR 117.593.
The owner of the bridge, the City of
Boston, requested a temporary deviation
from the drawbridge operation
regulations to facilitate scheduled
bridge maintenance, bearing
replacement.
Under this temporary deviation the
P.J. McArdle Bridge may remain closed
from 7 a.m. to 3 p.m., on October 24,
2005 and October 27, 2005.
This deviation from the operating
regulations is authorized under 33 CFR
117.35, and will be performed with all
due speed in order to return the bridge
to normal operation as soon as possible.
Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION: The
Metropolitan Avenue Bridge has a
vertical clearance in the closed position
of 10 feet at mean high water and 15 feet
at mean low water. The existing
drawbridge operation regulations are
listed at 33 CFR 117.801(e).
The owner of the bridge, New York
City Department of Transportation
(NYCDOT), requested a temporary
deviation from the drawbridge operation
regulations to facilitate scheduled
bridge repairs, counterweight
replacement. The bridge must remain in
the closed position in order to perform
this work.
Under this temporary deviation the
NYCDOT Metropolitan Avenue Bridge
may remain in the closed position from
11 p.m. on October 21, 2005 through 6
a.m. on October 24, 2005.
This deviation from the operating
regulations is authorized under 33 CFR
117.35, and will be performed with all
due speed in order to return the bridge
to normal operation as soon as possible.
FOR FURTHER INFORMATION CONTACT:
Dated: September 23, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 05–19948 Filed 10–4–05; 8:45 am]
Notice of temporary deviation
from regulations.
Dated: September 23, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 05–19947 Filed 10–4–05; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
BILLING CODE 4910–15–P
Coast Guard
DEPARTMENT OF HOMELAND
SECURITY
33 CFR Part 117
Coast Guard
RIN 1625–AA09
33 CFR Part 117
Drawbridge Operation Regulations:
Hackensack River, NJ
[CGD01–05–092]
Coast Guard, DHS.
VerDate Aug<31>2005
14:00 Oct 04, 2005
Coast Guard, DHS.
Final rule.
AGENCY:
Drawbridge Operation Regulations:
Chelsea River, MA
AGENCY:
[CGD01–05–061]
Jkt 208001
ACTION:
SUMMARY: The Coast Guard has changed
the drawbridge operation regulations
PO 00000
Frm 00065
Fmt 4700
Sfmt 4700
58057
that govern the Amtrak Portal Bridge at
mile 5.0, across the Hackensack River at
Little Snake Hill, New Jersey. This final
rule allows the bridge owner to expand
the two time periods in the morning and
in the afternoon, Monday through
Friday, when the bridge may remain
closed to vessel traffic.
DATES: This rule is effective November
4, 2005.
ADDRESSES: Comments and material
received from the public, as well as
documents indicated in this preamble as
being available in the docket, are part of
docket (CGD01–05–061) and are
available for inspection or copying at
the First Coast Guard District, Bridge
Branch Office, 408 Atlantic Avenue,
Boston, Massachusetts 02110, between 7
a.m. and 3 p.m., Monday through
Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Mr.
Gary Kassof, Bridge Administrator, First
Coast Guard District, (212) 668–7165.
SUPPLEMENTARY INFORMATION:
Regulatory Information
On July 29, 2005, we published a
notice of proposed rulemaking (NPRM)
entitled Drawbridge Operation
Regulations; Hackensack River, New
Jersey, in the Federal Register (70 FR
43812). We received 30 comment letters
in response to the notice of proposed
rulemaking. All 30 comment letters
were in favor of the proposed
rulemaking. No public hearing was
requested and none was held.
Background and Purpose
The Amtrak Portal Bridge has a
vertical clearance of 23 feet at mean
high water and 28 feet at mean low
water in the closed position. The
existing operating regulations are listed
at 33 CFR 117.723(c).
The owner of the bridge, National
Railroad Passenger Corporation
(AMTRAK), requested a change to the
drawbridge operation regulations that
would expand the two time periods in
the morning and afternoon, Monday
through Friday, when the bridge may
remain closed to vessel traffic.
Rail traffic during the morning and
afternoon commuter periods has
increased over the past several years.
Bridge openings during the two
commuter time periods have caused
delays to rail traffic prompting the
bridge owner to request the expansion
of the two bridge closure periods in the
morning and afternoon Monday through
Friday.
The Coast Guard conducted two 90day test deviations to help determine if
the proposed drawbridge operation
schedule changes would help facilitate
E:\FR\FM\05OCR1.SGM
05OCR1
Agencies
[Federal Register Volume 70, Number 192 (Wednesday, October 5, 2005)]
[Rules and Regulations]
[Page 58057]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-19947]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-05-092]
Drawbridge Operation Regulations: Chelsea River, MA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the drawbridge operation regulations for the
P.J. McArdle Bridge, mile 0.3, across the Chelsea River between East
Boston and Chelsea, Massachusetts. Under this temporary deviation the
bridge may remain closed from 7 a.m. to 3 p.m., on October 24, 2005 and
October 27, 2005. This temporary deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This deviation is effective from October 24, 2005 through
October 27, 2005.
FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First
Coast Guard District, at (617) 223-8364.
SUPPLEMENTARY INFORMATION: The P.J. McArdle Bridge has a vertical
clearance in the closed position of 21 feet at mean high water and 30
feet at mean low water. The existing drawbridge operation regulations
are listed at 33 CFR 117.593.
The owner of the bridge, the City of Boston, requested a temporary
deviation from the drawbridge operation regulations to facilitate
scheduled bridge maintenance, bearing replacement.
Under this temporary deviation the P.J. McArdle Bridge may remain
closed from 7 a.m. to 3 p.m., on October 24, 2005 and October 27, 2005.
This deviation from the operating regulations is authorized under
33 CFR 117.35, and will be performed with all due speed in order to
return the bridge to normal operation as soon as possible.
Dated: September 23, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 05-19947 Filed 10-4-05; 8:45 am]
BILLING CODE 4910-15-P