Port Arthur LNG, L.P. Port Arthur Pipeline, L.P.; Notice of Public Meeting Cancellation and Extension of Comment Period for the Draft Environmental Impact Statement for Port Arthur LNG Project, 57592 [E5-5412]

Download as PDF 57592 Federal Register / Vol. 70, No. 190 / Monday, October 3, 2005 / Notices eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–5389 Filed 9–30–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2586–024] Alabama Electric Cooperative, Inc.; Notice of Availability of Environmental Assessment September 23, 2005. In accordance with the National Environmental Policy Act of 1969 and part 380 of the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380; FERC Order No. 486 and 52 FR 47,897, the Office of Energy Projects has reviewed the application for a new license for the Conecuh River Project, located on the Conecuh River, in Covington County, Alabama, and has prepared a single environmental assessment (EA) for the project. The project does not use or occupy any Federal facilities or lands. In the EA, Commission staff analyzes the potential environmental effects of the existing project and concludes that licensing the project, with staff’s recommended measures, would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on VerDate Aug<31>2005 17:26 Sep 30, 2005 Jkt 205001 the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Please file any comments (an original and 8 copies) within 30 days from the date of this letter. The comments should be addressed to Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please affix ‘‘Conecuh River Project No. 2586–024’’ to all comments. Comments may be filed electronically via the Internet in lieu of paper. See (18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-filing’’ link. The Commission strongly encourages electronic filings. Please contact Carolyn Holsopple at (202) 502–6407, or by e-mail at carolyn.holsopple@ferc.gov if you have any questions. Magalie R. Salas, Secretary. [FR Doc. E5–5378 Filed 9–30–05; 8:45 am] BILLING CODE 6717–01–P Magalie R. Salas, Secretary. [FR Doc. E5–5412 Filed 9–30–05; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket Nos. CP05–83–000, CP05–84–000, CP05–85–000 and CP05–86–000] Port Arthur LNG, L.P. Port Arthur Pipeline, L.P.; Notice of Public Meeting Cancellation and Extension of Comment Period for the Draft Environmental Impact Statement for Port Arthur LNG Project September 27, 2005. Because of damage in the area due to Hurricane Rita, the staff of the Federal Energy Regulatory Commission (Commission) is canceling its planned public comment meetings in Vinton, Louisiana and Port Arthur, Texas for the Draft Environmental Impact Statement (EIS) for the Port Arthur LNG Project until further notice. However, we are extending the period for public PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 comment by 60 days. Comments are now due on December 16, 2005. As a reminder, any person wishing to comment on the draft EIS may do so. To ensure consideration prior to a Commission decision on the proposal, it is important that we receive your comments before the date specified below. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your comments to: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. • Reference Docket No. CP05–83–000 et al.; • Label one copy of the comments for the attention of Gas Branch 2, PJ11.2; and • Mail your comments so that they will be received in Washington, DC on or before December 16, 2005. Please note that we will include all comments that we receive within a reasonable time frame in our environmental analysis of this Project. However, the Commission strongly encourages electronic filing of any comments or interventions to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s Guide. Before you can file comments you will need to create a free account, which can be created by clicking on ‘‘Login to File’’ and then ‘‘New User Account.’’ DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 382–026 and 178–017] Southern California Edison Company, Pacific Gas & Electric Company; Notice of Availability of Final Environmental Assessment September 27, 2005. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the applications for license for the Borel Hydroelectric E:\FR\FM\03OCN1.SGM 03OCN1

Agencies

[Federal Register Volume 70, Number 190 (Monday, October 3, 2005)]
[Notices]
[Page 57592]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5412]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP05-83-000, CP05-84-000, CP05-85-000 and CP05-86-000]


Port Arthur LNG, L.P. Port Arthur Pipeline, L.P.; Notice of 
Public Meeting Cancellation and Extension of Comment Period for the 
Draft Environmental Impact Statement for Port Arthur LNG Project

September 27, 2005.
    Because of damage in the area due to Hurricane Rita, the staff of 
the Federal Energy Regulatory Commission (Commission) is canceling its 
planned public comment meetings in Vinton, Louisiana and Port Arthur, 
Texas for the Draft Environmental Impact Statement (EIS) for the Port 
Arthur LNG Project until further notice. However, we are extending the 
period for public comment by 60 days. Comments are now due on December 
16, 2005.
    As a reminder, any person wishing to comment on the draft EIS may 
do so. To ensure consideration prior to a Commission decision on the 
proposal, it is important that we receive your comments before the date 
specified below. Please carefully follow these instructions to ensure 
that your comments are received in time and properly recorded:
     Send an original and two copies of your comments to: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Room 1A, Washington, DC 20426.
     Reference Docket No. CP05-83-000 et al.;
     Label one copy of the comments for the attention of Gas 
Branch 2, PJ11.2; and
     Mail your comments so that they will be received in 
Washington, DC on or before December 16, 2005.
    Please note that we will include all comments that we receive 
within a reasonable time frame in our environmental analysis of this 
Project. However, the Commission strongly encourages electronic filing 
of any comments or interventions to this proceeding. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
at https://www.ferc.gov under the ``e-Filing'' link and the link to the 
User's Guide. Before you can file comments you will need to create a 
free account, which can be created by clicking on ``Login to File'' and 
then ``New User Account.''

Magalie R. Salas,
Secretary.
[FR Doc. E5-5412 Filed 9-30-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.