Energy Transfer Fuel LP; Notice of Petition for Rate Approval, 57578 [E5-5379]

Download as PDF 57578 Federal Register / Vol. 70, No. 190 / Monday, October 3, 2005 / Notices This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on October 5, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–5365 Filed 9–30–05; 8:45 am] petition for rate approval is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the FERRIS link. Enter the docket number excluding the last three digits I the docket number field to access the document. For Assistant, call (202) 502–8222 or for TTY, (202) 502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See, 18 CFR 385.2001(1)(iii) and the instructions on the Commission’s Web site under the e-Filing link. Comment Date: 5 p.m. eastern time on October 14, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–5379 Filed 9–30–05; 8:45 am] BILLING CODE 6717–01–P interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on October 7, 2005. DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E5–5369 Filed 9–30–05; 8:45 am] BILLING CODE 6717–01–P [Docket No. PR05–21–000] Energy Transfer Fuel LP; Notice of Petition for Rate Approval [Docket Nos. EL95–33–007, ER00–2854–006 and EL00–66–005] September 23, 2005. Take notice that on September 8, 2005, Energy Transfer Fuel LP (ET Fuel), filed with the Federal Energy Regulatory Commission an application pursuant to sections 284.123(b)(2) of the Commission’s regulations to justify the system-wide rate it proposes to charge for transporting natural gas pursuant to section 311(a)(2) of the Natural Gas Policy Act of 1978. ET Fuel states that it seeks to initiate firm transportation service with a maximum monthly reservation fee of $4.5625 per MMBtu and a usage fee of $0.065 per MMBtu, plus authority to retain from its shippers 1.30 percent of the quantity of gas delivered to ET Fuel for compressor fuel, company use and lost unaccounted for gas. Any person desiring to participate in this rate proceeding must file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Sections 385.214 or 385.211 of the Commission’s Rules and Regulations. All such motions or protests must be filed with the Secretary of the Commission on or before the date as indicated below. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceedings. Any person wishing to become a party must file a motion to intervene. This VerDate Aug<31>2005 17:26 Sep 30, 2005 Jkt 205001 DEPARTMENT OF ENERGY Entergy Services, Inc.; Notice of Filing Federal Energy Regulatory Commission September 23, 2005. Take notice that on September 16, 2005, Entergy Services, Inc., on behalf of the Entergy Operating Companies, Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans, Inc., tendered for filing, work papers in compliance with the Commission’s Order in Louisiana Public Service Commission and the Council of the City of New Orleans v. Entergy Corporation, et al. 112 FERC ¶ 61,192 (2005). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 [Docket No. EL05–49–000] Exelon Corporation v. PPL Electric Utilities Corporation and PJM Interconnection, L.L.C.; Notice of Filing September 26, 2005. Take notice that on September 14, 2005, Exelon Corporation, on behalf of itself and its wholly-owned subsidiary, PECO Energy Company (PECO) and PPL Electric Utilities Corporation (PPL) filed an Offer of Settlement and Settlement Agreement (Settlement) in the abovecaptioned proceeding to resolve all issues set for settlement proceeding and hearing on April 18, 2005, in connection with overcharges assessed by PJM Interconnection, L.L.C. (PJM) to PECO., Exelon Corp. v. PPL Elec. Utils. Corp. and PJM Interconnection, L.L.C. 111 FERC ¶ 61,065 (2005). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as E:\FR\FM\03OCN1.SGM 03OCN1

Agencies

[Federal Register Volume 70, Number 190 (Monday, October 3, 2005)]
[Notices]
[Page 57578]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5379]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PR05-21-000]


Energy Transfer Fuel LP; Notice of Petition for Rate Approval

September 23, 2005.
    Take notice that on September 8, 2005, Energy Transfer Fuel LP (ET 
Fuel), filed with the Federal Energy Regulatory Commission an 
application pursuant to sections 284.123(b)(2) of the Commission's 
regulations to justify the system-wide rate it proposes to charge for 
transporting natural gas pursuant to section 311(a)(2) of the Natural 
Gas Policy Act of 1978. ET Fuel states that it seeks to initiate firm 
transportation service with a maximum monthly reservation fee of 
$4.5625 per MMBtu and a usage fee of $0.065 per MMBtu, plus authority 
to retain from its shippers 1.30 percent of the quantity of gas 
delivered to ET Fuel for compressor fuel, company use and lost 
unaccounted for gas.
    Any person desiring to participate in this rate proceeding must 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
accordance with Sections 385.214 or 385.211 of the Commission's Rules 
and Regulations. All such motions or protests must be filed with the 
Secretary of the Commission on or before the date as indicated below. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceedings. Any person wishing to become a party must 
file a motion to intervene. This petition for rate approval is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at https://www.ferc.gov using 
the FERRIS link. Enter the docket number excluding the last three 
digits I the docket number field to access the document. For Assistant, 
call (202) 502-8222 or for TTY, (202) 502-8659. Comments, protests and 
interventions may be filed electronically via the Internet in lieu of 
paper. The Commission strongly encourages electronic filings. See, 18 
CFR 385.2001(1)(iii) and the instructions on the Commission's Web site 
under the e-Filing link.
    Comment Date: 5 p.m. eastern time on October 14, 2005.

Magalie R. Salas,
Secretary.
[FR Doc. E5-5379 Filed 9-30-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.