Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 57593-57594 [E5-5375]
Download as PDF
Federal Register / Vol. 70, No. 190 / Monday, October 3, 2005 / Notices
Project (P–382–026) and Kern Canyon
Hydroelectric Project (P–178–017) and
has prepared a Final Environmental
Assessment (FEA) for the projects. The
Borel Hydroelectric Project is located on
the Kern River near the town of Bodfish
in Kern County, California. The canal
intake for the project is located on
approximately 188 acres of Sequoia
National Forest Service lands. The Kern
Canyon Hydroelectric Project is located
on the Kern River, near the town of
Bakersfield in Kern County, California.
The project occupies approximately
11.26 acres of public land located
within the Sequoia National Forest.
The FEA contains the Staff’s analysis
of the potential environmental impacts
of the projects and concludes that
licensing the projects, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the FEA is on file with the
Commission and is available for public
inspection. The FEA is available for
review at the Commission or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
For further information, contact Emily
Carter at (202) 502–6512 or
emily.carter@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5402 Filed 9–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, and Terms and
Conditions
September 23, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Conduit
Exemption.
b. Project No.: 12550–001.
c. Date filed: June 24, 2005.
d. Applicant: Wade Jacobson.
VerDate Aug<31>2005
17:26 Sep 30, 2005
Jkt 205001
e. Name of Project: Mary Taylor Drop
Hydroelectric Project.
f. Location: The Mary Taylor Drop
Hydroelectric Project would be located
at the Mary Taylor canal drop between
the Spring Valley Canal and Greenfields
Main Canal, which are part of the
Bureau of Reclamation’s Sun River
Irrigation Project in Teton County,
Montana. The proposed hydroelectric
facilities would be located on private
land, some of which is leased to
Reclamation for the operation and
maintenance of the irrigation canals.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a—825r.
h. Applicant Contact: Mr. Ted
Sorenson, Sorenson Engineering, 5203
South 11th East, Idaho Falls, ID 83404,
(208) 522–8069.
i. FERC Contact: James Hunter, (202)
502–6086.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: The Commission directs,
pursuant to section 4.34(b) of the
Regulations (see Order No. 533 issued
May 8, 1991, 56 FR 23108, May 20,
1991) that all comments, motions to
intervene, protests, recommendations,
terms and conditions, and prescriptions
concerning the application be filed with
the Commission by November 23, 2005.
All reply comments must be filed with
the Commission by December 9, 2005.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of Project: The proposed
small conduit hydroelectric project
would consist of: (1) An intake structure
on the left side of Spring Valley Canal,
with a trash rack and a stop log slot, (2)
a 400-foot-long, 5-foot-diameter
penstock, (3) a metal powerhouse
containing two turbines and one 890-
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
57593
kilowatt generating unit, and (4) draft
tubes and a tailrace discharging into
Greenfields Main Canal. The average
annual energy production would be
1,840 megawatt hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE., Washington, DC
20426. The filing may also be viewed on
the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, here P–12550, in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h. above.
n. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
o. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and eight copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
E:\FR\FM\03OCN1.SGM
03OCN1
57594
Federal Register / Vol. 70, No. 190 / Monday, October 3, 2005 / Notices
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5375 Filed 9–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
September 23, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12581–000.
c. Date filed: March 31, 2005.
d. Applicant: Cambria Somerset
Authority.
e. Name and Location of Project: The
proposed Que Pumped Storage Project
would be located in Quemahoning
Township, Somerset County,
Pennsylvania.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant contact: Mr. Paul C.
Rizzo, Paul C. Rizzo Associates, Inc.,
647 Main Street, Suite 200, Johnstown,
PA 15901, (814) 536–6767.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12581–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
VerDate Aug<31>2005
17:26 Sep 30, 2005
Jkt 205001
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Existing Facilities
and Proposed Project: The proposed
project would consist of the following
facilities: (1) A new upper reservoir
with a maximum storage capacity of
1,549.8 acre-feet and a surface area of 30
acres at maximum normal water surface
elevation of 2088 feet above mean sea
level (msl); (2) a new upper concrete
intake structure with a steel penstock;
(3) a new lower concrete and steel
intake structure; (4) a new powerhouse
with two 50-megawatt pump/turbines;
(5) an existing lower reservoir with a
maximum storage capacity of 36,212.9
acre-feet and an area of 928 acres at
maximum water surface elevation of
1625 feet msl; (6) a new transmission
line between the powerhouse and
switchyard and an existing transmission
line approximately 7300-feet-long to the
southeast; and (7) appurtenant facilities.
The proposed project would have an
annual generation of 156 GWh.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘e-
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 70, Number 190 (Monday, October 3, 2005)]
[Notices]
[Pages 57593-57594]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5375]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Motions To Intervene, Protests, Recommendations, and Terms
and Conditions
September 23, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: 12550-001.
c. Date filed: June 24, 2005.
d. Applicant: Wade Jacobson.
e. Name of Project: Mary Taylor Drop Hydroelectric Project.
f. Location: The Mary Taylor Drop Hydroelectric Project would be
located at the Mary Taylor canal drop between the Spring Valley Canal
and Greenfields Main Canal, which are part of the Bureau of
Reclamation's Sun River Irrigation Project in Teton County, Montana.
The proposed hydroelectric facilities would be located on private land,
some of which is leased to Reclamation for the operation and
maintenance of the irrigation canals.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a--825r.
h. Applicant Contact: Mr. Ted Sorenson, Sorenson Engineering, 5203
South 11th East, Idaho Falls, ID 83404, (208) 522-8069.
i. FERC Contact: James Hunter, (202) 502-6086.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for filing responsive documents: The Commission
directs, pursuant to section 4.34(b) of the Regulations (see Order No.
533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments,
motions to intervene, protests, recommendations, terms and conditions,
and prescriptions concerning the application be filed with the
Commission by November 23, 2005. All reply comments must be filed with
the Commission by December 9, 2005.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link. The Commission strongly encourages electronic filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of Project: The proposed small conduit hydroelectric
project would consist of: (1) An intake structure on the left side of
Spring Valley Canal, with a trash rack and a stop log slot, (2) a 400-
foot-long, 5-foot-diameter penstock, (3) a metal powerhouse containing
two turbines and one 890-kilowatt generating unit, and (4) draft tubes
and a tailrace discharging into Greenfields Main Canal. The average
annual energy production would be 1,840 megawatt hours.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street,
NE., Washington, DC 20426. The filing may also be viewed on the Web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number, here P-12550, in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for review and reproduction at the address in item h.
above.
n. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
o. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. Any of
these documents must be filed by providing the original and eight
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Office of Energy Projects, Federal Energy Regulatory Commission, at the
above address. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified
[[Page 57594]]
in the particular application. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Magalie R. Salas,
Secretary.
[FR Doc. E5-5375 Filed 9-30-05; 8:45 am]