Federal Register / Vol. 70, No. 190 / Monday, October 3, 2005 / Notices
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5410 Filed 9–30–05; 8:45 am]
Magalie R. Salas,
Secretary.
[FR Doc. E5–5404 Filed 9–30–05; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RP02–361–055]
[Docket No. ER05–1232–000]
Gulfstream Natural Gas System, L.L.C.;
Notice of Compliance Filing
J. P. Morgan Ventures Energy
Corporation; Notice of Issuance of
Order
September 27, 2005.
Take notice that on September 21,
2005, Gulfstream Natural Gas System,
L.L.C. (Gulfstream) submitted a
compliance filing pursuant to the
Commission’s September 7, 2005 Letter
Order in the above-referenced
proceeding.
Gulfstream states that copies of the
filing were served on parties on the
official service list in the abovecaptioned proceeding, as well as all
affected customers and interested state
commissions.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
VerDate Aug<31>2005
17:26 Sep 30, 2005
Jkt 205001
September 23, 2005.
J. P. Morgan Ventures Energy
Corporation (Ventures Energy) filed an
application for market-based rate
authority, with an accompanying rate
tariff. The proposed rate tariff provides
for wholesale sales of energy, capacity
and ancillary services at market-based
rates. Ventures Energy also requested
waiver of various Commission
regulations. In particular, Ventures
Energy requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by Ventures Energy.
On September 20, 2005, the
Commission granted the request for
blanket approval under part 34, subject
to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by Ventures Energy should file
a motion to intervene or protest with the
Federal Energy Regulatory Commission,
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protests, is October 20, 2005.
Absent a request to be heard in
opposition by the deadline above,
Ventures Energy is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Ventures Energy,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of Ventures Energy’s issuances
of securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426. The Order may
also be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number filed to access the
document. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–5358 Filed 9–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–667–003]
Midwest Independent Transmission
System Operator, Inc.; Notice of Filing
September 27, 2005.
Take notice that on September 23,
2005, the Midwest Independent
Transmission System Operator, Inc.
(Midwest ISO) tendered for filing, a
redline version of a March 2, 2005,
unexecuted Large Generator
Interconnection Agreement among
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 70, Number 190 (Monday, October 3, 2005)]
[Notices]
[Page 57580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-5358]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER05-1232-000]
J. P. Morgan Ventures Energy Corporation; Notice of Issuance of
Order
September 23, 2005.
J. P. Morgan Ventures Energy Corporation (Ventures Energy) filed an
application for market-based rate authority, with an accompanying rate
tariff. The proposed rate tariff provides for wholesale sales of
energy, capacity and ancillary services at market-based rates. Ventures
Energy also requested waiver of various Commission regulations. In
particular, Ventures Energy requested that the Commission grant blanket
approval under 18 CFR part 34 of all future issuances of securities and
assumptions of liability by Ventures Energy.
On September 20, 2005, the Commission granted the request for
blanket approval under part 34, subject to the following:
Any person desiring to be heard or to protest the blanket approval
of issuances of securities or assumptions of liability by Ventures
Energy should file a motion to intervene or protest with the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protests, is October 20, 2005.
Absent a request to be heard in opposition by the deadline above,
Ventures Energy is authorized to issue securities and assume
obligations or liabilities as a guarantor, indorser, surety, or
otherwise in respect of any security of another person; provided that
such issuance or assumption is for some lawful object within the
corporate purposes of Ventures Energy, compatible with the public
interest, and is reasonably necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approval of Ventures Energy's issuances of securities or
assumptions of liability.
Copies of the full text of the Commission's Order are available
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5-5358 Filed 9-30-05; 8:45 am]
BILLING CODE 6717-01-P