Notice of Intent To Prepare a Programmatic Environmental Impact Statement, Amend Relevant Agency Land Use Plans, Conduct Public Scoping Meetings, and Notice of Floodplain and Wetlands Involvement, 56647-56649 [05-19375]
Download as PDF
Federal Register / Vol. 70, No. 187 / Wednesday, September 28, 2005 / Notices
SAFEGUARDS:
EXEMPTIONS CLAIMED FOR THE SYSTEM:
Computerized records are maintained
in a controlled area accessible only to
authorized personnel. Entry to these
areas is restricted to those personnel
with a valid requirement and
authorization to enter. Physical entry is
restricted by the use of lock, guards, and
administrative procedures. Access to
any specific record is based on the needto-know and the specific level of
authorization granted to the user.
Physical and electronic access is
restricted to designated individuals
having a need-to-know in the
performance of official duties. Access to
personal information is further
restricted by the use of the Army
Knowledge Online database (AKO)
single sign-on and password
authorization.
RETENTION AND DISPOSAL:
Disposition pending (until the
National Archives and Records
Administration has approved retention
and disposition of these records, treat as
permanent).
SYSTEM MANAGER(S) AND ADDRESS:
Commander, Communication—
Electronics Life Cycle Management
Command, ATTN: CE–LCMC SPO, Fort
Monmouth, NJ 07703–5000.
NOTIFICATION PROCEDURE:
Individuals seeking to determine
whether information about themselves
is contained in this system should
address written inquiries to the
appropriate administrative office of
their employing agency.
For verification purposes, individual
should provide full name, SSN,
sufficient details to permit locating
pertinent records, and signature.
RECORDS ACCESS PROCEDURE:
Individuals seeking access to
information about themselves contained
in this system should address written
inquiries to the appropriate
administrative office of their employing
agency.
For verification purposes, individual
should provide full name, SSN,
sufficient details to permit locating
pertinent records, and signature.
CONTESTING RECORDS PROCEDURES:
The Army’s rules for accessing
records, and for contesting contents and
appealing initial agency determinations
are contained in Army Regulation 340–
21; 32 CFR part 505; or may be obtained
from the system manager.
RECORD SOURCE CATEGORIES:
Individuals, their employers, travel
documentation, and service providers.
VerDate Aug<31>2005
16:02 Sep 27, 2005
Jkt 205001
None.
[FR Doc. 05–19326 Filed 9–27–05; 8:45 am]
BILLING CODE 5001–06–M
DEPARTMENT OF ENERGY
DEPARTMENT OF THE INTERIOR
Notice of Intent To Prepare a
Programmatic Environmental Impact
Statement, Amend Relevant Agency
Land Use Plans, Conduct Public
Scoping Meetings, and Notice of
Floodplain and Wetlands Involvement
AGENCIES: Office of Electricity Delivery
and Energy Reliability, Department of
Energy (DOE) and the Bureau of Land
Management (BLM), Department of the
Interior (DOI).
ACTION: Notice of intent to prepare a
programmatic environmental impact
statement, amend relevant agency land
use plans, conduct public scoping
meetings, and notice of floodplain and
wetlands involvement.
SUMMARY: Section 368 of the Energy
Policy Act of 2005 (the Act), Public Law
109–58 (H.R. 6), enacted August 8, 2005,
directs the Secretaries of Agriculture,
Commerce, Defense, Energy, and the
Interior (the Agencies) to designate
under their respective authorities
corridors on Federal land in the 11
Western States for oil, gas and hydrogen
pipelines and electricity transmission
and distribution facilities (energy
corridors). The Agencies have
determined that designating corridors as
required by Section 368 of the Act
constitutes a major Federal action which
may have a significant impact upon the
environment within the meaning of the
National Environmental Policy Act of
1969 (NEPA). For this reason, the
Agencies intend to prepare a
programmatic environmental impact
statement (PEIS) entitled, ‘‘Designation
of Energy Corridors on Federal Land in
the 11 Western States’’ (DOE/EIS–0386)
to address the environmental impacts
from the proposed action and the range
of reasonable alternatives. DOE and
BLM will be co-lead agencies for this
effort, with the Department of
Agriculture’s Forest Service (FS)
participating as a cooperating agency.
The purpose of this Notice of Intent
is to inform the public about the
proposed action, announce plans to
conduct 11 public scoping meetings,
invite public participation in the
scoping process, and solicit public
comments for consideration in
establishing the scope and content of
the PEIS. Because the proposed action
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
56647
may involve actions in a floodplain or
wetland, the draft PEIS will include a
floodplain and wetlands assessment and
the final PEIS or Record of Decision will
include a floodplain statement of
findings.
The Agencies will prepare the PEIS in
accordance with NEPA, the Council on
Environmental Quality (CEQ)
regulations, 40 CFR 1500–1508, DOE’s
regulations developed pursuant to
NEPA, 10 CFR 1021, BLM’s planning
regulations 43 CFR 1600 and applicable
FS planning regulations to amend land
use plans.
DATES: The Agencies invite interested
agencies, states, organizations, Native
American tribes, and members of the
public to submit comments or
suggestions to assist in identifying
significant environmental issues and in
determining the scope of this PEIS. The
public scoping period starts with the
publication of this notice in the Federal
Register and will continue until
November 28, 2005. Written and oral
comments will be given equal weight,
and the Agencies will consider all
comments received or postmarked by
November 28, 2005 in defining the
scope of this PEIS. Comments received
or postmarked after that date will be
considered to the extent practicable.
Dates for the public scoping meetings
are:
1. October 25, 2005, Denver, Colorado
2. October 26, 2005, Albuquerque, New
Mexico
3. October 26, 2005, Salt Lake City, Utah
4. October 27, 2005, Cheyenne,
Wyoming
5. October 27, 2005, Helena, Montana
6. November 1, 2005, Boise, Idaho
7. November 1, 2005, Sacramento,
California
8. November 2, 2005, Las Vegas, Nevada
9. November 2, 2005, Portland, Oregon
10. November 3, 2005, Phoenix, Arizona
11. November 3, 2005, Seattle,
Washington
The Agencies will announce the times
and locations of the public meetings
through the local media, newsletters,
and the project Web site (https://
corridoreis.anl.gov) at least 15 days
prior to the meeting.
Requests to speak at a public scoping
meeting(s) should be received by Julia
Souder at the addresses indicated below
on or before October 18, 2005. Requests
to speak may also be made at the time
of registration for the scoping
meeting(s). However, persons who
submitted advance requests to speak
will be given priority if time should be
limited during the meetings.
ADDRESSES: Comments or suggestions
on the scope of the PEIS and requests to
E:\FR\FM\28SEN1.SGM
28SEN1
56648
Federal Register / Vol. 70, No. 187 / Wednesday, September 28, 2005 / Notices
speak at the scoping meeting(s) should
be sent to: Julia Souder by mail at U.S.
Department of Energy, Office of
Electricity Delivery and Energy
Reliability, 1000 Independence Avenue,
SW., Washington, DC 20585; by
facsimile at (202) 586–1472 or phone at
(202) 586–9052.
Please note that regular postal mail to
DOE tends to be delayed because of
anthrax screening. In order to avoid
these delays, if you wish to comment or
request to speak at the scoping
meeting(s) by mail, we suggest that your
submission be sent by using overnight
service, or that your letter first be sent
to us by facsimile or electronic mail,
and then followed by regular mailing of
the original documents.
FOR FURTHER INFORMATION CONTACT: For
information on the proposed project or
to receive a copy of the Draft PEIS when
it is issued, contact Julia Souder by any
of the means indicated in the ADDRESSES
section of this notice. A complete
description of the proposed action also
may be found on the project Web site at
https://corridoreis.anl.gov.
For general information on the DOE
NEPA process please contact: Carol M.
Borgstrom, Director, Office of NEPA
Policy and Compliance (EH–42), U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0119, Phone:
202–586–4600; or leave a message at 1–
800–472–2756; Facsimile: 202–586–
7031.
SUPPLEMENTARY INFORMATION:
Background and Need for Agency
Action
Section 368 of the Act, entitled
‘‘Energy Right-of-Way Corridors on
Federal Land,’’ and specifically
subsection 368(d) require the Agencies
to designate energy corridors, taking
into account the ‘‘need for upgraded and
new electricity transmission and
distribution facilities’’ in order to
‘‘improve reliability,’’ ‘‘relieve
congestion,’’ and ‘‘enhance the
capability of the national grid to deliver
electricity.’’ See Electricity
Modernization Act, Pub. L. 109–58 (H.R.
6) section 368(d)(1)–(3). Section 368
applies only to Federal lands.
Specifically, Section 368 requires the
Agencies to cooperate using their
respective authorities to (1) ‘‘designate
corridors for oil, gas, and hydrogen
pipelines and electricity transmission
and distribution facilities on Federal
land in the eleven contiguous Western
States (as defined in Section 103(o) of
the Federal Land Policy and
Management Act of 1976 (43 U.S.C.
1702(o)); (2) perform any environmental
VerDate Aug<31>2005
16:02 Sep 27, 2005
Jkt 205001
reviews that may be required to
complete the designations of such
corridors; and (3) incorporate the
designated corridors into the relevant
agency land use and resource
management plans or equivalent plans’’.
See Pub. L. 109–59 § 368(a)(1)–(3).
Section 368 divides the Agencies’
schedules for designating transmission
corridors on public lands into two
groups: (1) ‘‘Western States’’, consisting
of Arizona, California, Colorado, Idaho,
Montana, Nevada, New Mexico, Oregon,
Utah, Washington, and Wyoming; and
(2) all other states. This PEIS relates
solely to corridors in the Western States.
Proposed Action and Alternatives
The Proposed Action in this PEIS is
to designate corridors on Federal land in
the eleven Western States for oil, gas
and hydrogen pipelines and electricity
transmission and distribution facilities.
Based upon the information and
analyses developed in this PEIS, each
Agency would amend its respective
land use plans by designating a series of
energy corridors effective upon signing
of the Record(s) of Decision.
No Action Alternative
Under the No Action alternative, no
new energy corridors would be
designated through this coordinated
approach. The No Action alternative
will identify the environmental impacts
associated with each of the Agencies
continuing to designate energy corridors
through use of their present practices.
These practices would include the
application of local planning criteria by
each regional land management office.
Increased Utilization Alternative
Under the Increased Utilization
alternative, the Agencies will assess the
environmental impacts associated with
increasing the capacity of existing
energy corridors through the application
of new technologies and/or operational
techniques. This alternative will assesss
the impacts of developing multiple
projects within existing corridors and
rights-of-way and the application of new
technologies to increase the energy
capacities of existing facilities within
those corridors.
New Corridor Alternative
Under the New Corridor alternative,
the Agencies will assess the impacts
associated with designating new energy
corridors on Federal land. A
preliminary set of new corridors will be
identified through information obtained
through scoping as well as information
from the energy transport industry
including, but not limited to: The
Western Utility Group; the Seams
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Steering Group—Western
Interconnection; Colorado Coordinating
Planning Group; the Northwest
Transmission Assessment Committee;
the Southwest Area Transmission
Study; the Southwest Transmission
Expansion Plan; and the Rocky
Mountain Area Transmission Study.
The scoping process will afford other
stakeholders such as environmental
groups, counties, states, Native
American tribes, and interested citizens
an opportunity to propose new
corridors. The Agencies will use this
information to identify new energy
corridors that will be analyzed in the
PEIS.
Optimization Criteria Alternative
Under the Optimization Criteria
alternative, the Agencies will assess the
impacts of new energy corridors that
will be identified through a combination
of new and existing corridors based on
a set of criteria and strategies that
incorporate environmental concerns,
projected supply and demand, network
efficiencies, landscape features, the
availability of new technologies, and
costs.
The Agencies will consider any
additional reasonable alternatives that
result from comments received in
response to the scoping process
described in this notice.
Identification of Environmental Issues
Note that environmental issues
identified should be related to:
Restriction of conflicting uses within
the corridors, adequacy of potential plan
direction within the corridors, any
identifiable environmental concerns
within the potential corridors. Any
corridor designation, and subsequent
incorporation into an agencies land use
plan by this plan amendment process
does not, itself, authorize project
activities. Any new proposed project
activities, such as construction of a new
pipeline or electric transmission line or
retrofitting utilities within an existing
corridor, would be analyzed in
subsequent NEPA analyses which
would also involve public notice and
comment. This PEIS is for corridor
designation only.
The purpose of this notice is to solicit
comments and suggestions for
consideration in the preparation of the
PEIS. As background for public
comment, this notice contains a list of
potential environmental issues that the
Agencies have tentatively identified for
analysis. This list is not intended to be
all-inclusive or to imply any
predetermination of impacts. Following
is a preliminary list of issues that may
be analyzed in the PEIS:
E:\FR\FM\28SEN1.SGM
28SEN1
Federal Register / Vol. 70, No. 187 / Wednesday, September 28, 2005 / Notices
(1) Socioeconomic and recreational
impacts of development of the land
tracts and their subsequent uses;
(2) Impacts on protected, threatened,
endangered, or sensitive species of
animals or plants, or their critical
habitats;
(3) Impacts on floodplains and
wetlands;
(4) Impacts on archaeological,
cultural, or historic resources;
(5) Impacts on human health and
safety;
(6) Impacts on existing and future
land uses;
(7) Visual impacts; and
(8) Disproportionately high and
adverse impacts on minority and lowincome populations, also known as
environmental justice considerations.
Scoping Process
Interested parties are invited to
participate in the scoping process, both
to refine the preliminary alternatives
and environmental issues to be analyzed
in depth and to eliminate from detailed
study those alternatives and
environmental issues that are not
feasible or pertinent. The scoping
process is intended to involve all
interested agencies (Federal, State,
county, and local), public interest
groups, Native American tribes,
businesses, and members of the public.
Public scoping meetings will be held as
indicated above under the DATES and
ADDRESSES sections. These scoping
meetings will be informal. The
presiding officer will establish only
those procedures needed to ensure that
everyone who wishes to speak has a
chance to do so and that the Agencies
understand all issues and comments.
Speakers will be allocated
approximately 5 minutes for their oral
statements. Depending upon the number
of persons wishing to speak, the
presiding officer may allow longer times
for representatives of organizations.
Consequently, persons wishing to speak
on behalf of an organization should
identify that organization in their
request to speak. Persons who have not
submitted a request to speak in advance
may register to speak at the scoping
meeting(s), but advance requests are
encouraged. Meetings will begin at the
times specified and will continue until
all those present who wish to
participate have had an opportunity to
do so. Should any speaker desire to
provide for the record further
information that cannot be presented
within the designated time, such
additional information may be
submitted in writing by the date listed
in the DATES section.
VerDate Aug<31>2005
16:02 Sep 27, 2005
Jkt 205001
Oral, written, and electronic (i.e., by
facsimile or by e-mail) comments will
be impartially considered and given
equal weight by the Agencies.
A complete transcript of the public
scoping meetings will be retained by the
Agencies and made available to the
public for review on the DOE Web site
at https://www.electricity.doe.gov, on the
project Web site at https://
corridoreis.anl.gov, and during business
hours at the Department of Energy,
Freedom of Information Reading Room,
Forrestal Building, 1000 Independence
Avenue, SW., Washington, DC.
Draft PEIS Schedule and Availability
The Draft PEIS is scheduled to be
issued in early spring 2006. The
availability of the Draft PEIS and dates
for public hearings soliciting comments
on it will be announced in the Federal
Register and local media. Comments on
the Draft PEIS will be considered in
preparing the Final PEIS.
Those interested parties who do not
wish to submit comments at this time,
but who would like to receive a copy of
the Draft PEIS and other project
materials, please contact Julia Souder as
provided in the ADDRESSES section of
this notice.
Tom Lonnie,
Assistant Director, Minerals, Realty and
Resource Protection, Bureau of Land
Management.
John Spitaleri Shaw,
Assistant Secretary for Environment, Safety
and Health, Department of Energy.
[FR Doc. 05–19375 Filed 9–27–05; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Impact Statement: Site
Selection for the Expansion of the
Strategic Petroleum Reserve
Department of Energy (DOE).
Notice to extend the public
scoping period and reschedule public
scoping meetings.
AGENCY:
ACTION:
SUMMARY: Due to the extraordinary
circumstances created by Hurricane
Katrina in the region where the
proposed action and public scoping
meetings will take place, DOE has
extended the public scoping period and
revised the dates and locations of the
public scoping meetings originally
announced in the Notice of Intent to
Prepare an Environmental Impact
Statement (70 FR 52088; September 1,
2005).
DATES:
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
56649
Extended: The public scoping period
is extended by 2 weeks to October 28,
2005.
Cancelled: The public scoping
meeting at Hattiesburg, Mississippi,
originally scheduled on October 4, 2005,
is cancelled.
Cancelled: The public scoping
meeting at Pascagoula, Mississippi,
originally scheduled on October 5, 2005,
is cancelled.
Rescheduled: The public scoping
meeting at Houma, Louisiana, originally
scheduled on October 6, 2005 has been
rescheduled to October 19, 2005, at the
Ramada Inn, 1400 West Tunnel
Boulevard, from 7 p.m. to 9 p.m.
Telephone: (985) 879–4871.
No Change to Original Schedule: The
public scoping meeting at Lake Jackson,
Texas, will take place as originally
scheduled on October 11, 2005, 7 p.m.
to 9 p.m. at the Cherotel Brazosport
Hotel and Conference Center, 925 Hwy
332. Telephone: (979) 297–1161.
New Public Scoping Meeting: A public
scoping meeting will be held at Jackson,
Mississippi, on October 18, 2005, 7 p.m.
to 9 p.m. at the Jackson Marriott
Downtown, 200 East Amite Street.
Telephone: (601) 969–5100.
FOR FURTHER INFORMATION CONTACT:
Comments or suggestions on the scope
and content of the EIS and requests to
speak at the scoping meetings should be
directed to Donald Silawsky, Office of
Petroleum Reserves (FE–47), U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0301; telephone:
(202) 586–1892; fax: (202) 586–4446; or
electronic mail at
Donald.Silawsky@hq.doe.gov.
Envelopes and the subject line of emails or faxes should be labeled
‘‘Scoping for the SPR EIS.’’ Please note
that conventional mail to DOE may be
delayed by anthrax screening.
For information on the proposed
project or to receive a copy of the Draft
EIS when it is issued, contact Donald
Silawsky by any of the means listed
above. Additional information may also
be found on the DOE Fossil Energy
Strategic Petroleum Reserve proposed
expansion Web site at https://
fossil.energy.gov/news/techlines/2005/
tl_spr_noi.html.
For information on the DOE NEPA
process, contact Carol M. Borgstrom,
Director, Office of NEPA Policy and
Compliance (EH–42), U.S. Department
of Energy, 1000 Independence Avenue,
SW., Washington, DC 20585–0119;
telephone: (202) 586–4600; fax: (202)
586–7031; or leave a toll-free message
at: (800) 472–2756.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 70, Number 187 (Wednesday, September 28, 2005)]
[Notices]
[Pages 56647-56649]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-19375]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
DEPARTMENT OF THE INTERIOR
Notice of Intent To Prepare a Programmatic Environmental Impact
Statement, Amend Relevant Agency Land Use Plans, Conduct Public Scoping
Meetings, and Notice of Floodplain and Wetlands Involvement
AGENCIES: Office of Electricity Delivery and Energy Reliability,
Department of Energy (DOE) and the Bureau of Land Management (BLM),
Department of the Interior (DOI).
ACTION: Notice of intent to prepare a programmatic environmental impact
statement, amend relevant agency land use plans, conduct public scoping
meetings, and notice of floodplain and wetlands involvement.
-----------------------------------------------------------------------
SUMMARY: Section 368 of the Energy Policy Act of 2005 (the Act), Public
Law 109-58 (H.R. 6), enacted August 8, 2005, directs the Secretaries of
Agriculture, Commerce, Defense, Energy, and the Interior (the Agencies)
to designate under their respective authorities corridors on Federal
land in the 11 Western States for oil, gas and hydrogen pipelines and
electricity transmission and distribution facilities (energy
corridors). The Agencies have determined that designating corridors as
required by Section 368 of the Act constitutes a major Federal action
which may have a significant impact upon the environment within the
meaning of the National Environmental Policy Act of 1969 (NEPA). For
this reason, the Agencies intend to prepare a programmatic
environmental impact statement (PEIS) entitled, ``Designation of Energy
Corridors on Federal Land in the 11 Western States'' (DOE/EIS-0386) to
address the environmental impacts from the proposed action and the
range of reasonable alternatives. DOE and BLM will be co-lead agencies
for this effort, with the Department of Agriculture's Forest Service
(FS) participating as a cooperating agency.
The purpose of this Notice of Intent is to inform the public about
the proposed action, announce plans to conduct 11 public scoping
meetings, invite public participation in the scoping process, and
solicit public comments for consideration in establishing the scope and
content of the PEIS. Because the proposed action may involve actions in
a floodplain or wetland, the draft PEIS will include a floodplain and
wetlands assessment and the final PEIS or Record of Decision will
include a floodplain statement of findings.
The Agencies will prepare the PEIS in accordance with NEPA, the
Council on Environmental Quality (CEQ) regulations, 40 CFR 1500-1508,
DOE's regulations developed pursuant to NEPA, 10 CFR 1021, BLM's
planning regulations 43 CFR 1600 and applicable FS planning regulations
to amend land use plans.
DATES: The Agencies invite interested agencies, states, organizations,
Native American tribes, and members of the public to submit comments or
suggestions to assist in identifying significant environmental issues
and in determining the scope of this PEIS. The public scoping period
starts with the publication of this notice in the Federal Register and
will continue until November 28, 2005. Written and oral comments will
be given equal weight, and the Agencies will consider all comments
received or postmarked by November 28, 2005 in defining the scope of
this PEIS. Comments received or postmarked after that date will be
considered to the extent practicable.
Dates for the public scoping meetings are:
1. October 25, 2005, Denver, Colorado
2. October 26, 2005, Albuquerque, New Mexico
3. October 26, 2005, Salt Lake City, Utah
4. October 27, 2005, Cheyenne, Wyoming
5. October 27, 2005, Helena, Montana
6. November 1, 2005, Boise, Idaho
7. November 1, 2005, Sacramento, California
8. November 2, 2005, Las Vegas, Nevada
9. November 2, 2005, Portland, Oregon
10. November 3, 2005, Phoenix, Arizona
11. November 3, 2005, Seattle, Washington
The Agencies will announce the times and locations of the public
meetings through the local media, newsletters, and the project Web site
(https://corridoreis.anl.gov) at least 15 days prior to the meeting.
Requests to speak at a public scoping meeting(s) should be received
by Julia Souder at the addresses indicated below on or before October
18, 2005. Requests to speak may also be made at the time of
registration for the scoping meeting(s). However, persons who submitted
advance requests to speak will be given priority if time should be
limited during the meetings.
ADDRESSES: Comments or suggestions on the scope of the PEIS and
requests to
[[Page 56648]]
speak at the scoping meeting(s) should be sent to: Julia Souder by mail
at U.S. Department of Energy, Office of Electricity Delivery and Energy
Reliability, 1000 Independence Avenue, SW., Washington, DC 20585; by
facsimile at (202) 586-1472 or phone at (202) 586-9052.
Please note that regular postal mail to DOE tends to be delayed
because of anthrax screening. In order to avoid these delays, if you
wish to comment or request to speak at the scoping meeting(s) by mail,
we suggest that your submission be sent by using overnight service, or
that your letter first be sent to us by facsimile or electronic mail,
and then followed by regular mailing of the original documents.
FOR FURTHER INFORMATION CONTACT: For information on the proposed
project or to receive a copy of the Draft PEIS when it is issued,
contact Julia Souder by any of the means indicated in the ADDRESSES
section of this notice. A complete description of the proposed action
also may be found on the project Web site at https://
corridoreis.anl.gov.
For general information on the DOE NEPA process please contact:
Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance (EH-
42), U.S. Department of Energy, 1000 Independence Avenue, SW.,
Washington, DC 20585-0119, Phone: 202-586-4600; or leave a message at
1-800-472-2756; Facsimile: 202-586-7031.
SUPPLEMENTARY INFORMATION:
Background and Need for Agency Action
Section 368 of the Act, entitled ``Energy Right-of-Way Corridors on
Federal Land,'' and specifically subsection 368(d) require the Agencies
to designate energy corridors, taking into account the ``need for
upgraded and new electricity transmission and distribution facilities''
in order to ``improve reliability,'' ``relieve congestion,'' and
``enhance the capability of the national grid to deliver electricity.''
See Electricity Modernization Act, Pub. L. 109-58 (H.R. 6) section
368(d)(1)-(3). Section 368 applies only to Federal lands.
Specifically, Section 368 requires the Agencies to cooperate using
their respective authorities to (1) ``designate corridors for oil, gas,
and hydrogen pipelines and electricity transmission and distribution
facilities on Federal land in the eleven contiguous Western States (as
defined in Section 103(o) of the Federal Land Policy and Management Act
of 1976 (43 U.S.C. 1702(o)); (2) perform any environmental reviews that
may be required to complete the designations of such corridors; and (3)
incorporate the designated corridors into the relevant agency land use
and resource management plans or equivalent plans''. See Pub. L. 109-59
Sec. 368(a)(1)-(3).
Section 368 divides the Agencies' schedules for designating
transmission corridors on public lands into two groups: (1) ``Western
States'', consisting of Arizona, California, Colorado, Idaho, Montana,
Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming; and (2) all
other states. This PEIS relates solely to corridors in the Western
States.
Proposed Action and Alternatives
The Proposed Action in this PEIS is to designate corridors on
Federal land in the eleven Western States for oil, gas and hydrogen
pipelines and electricity transmission and distribution facilities.
Based upon the information and analyses developed in this PEIS, each
Agency would amend its respective land use plans by designating a
series of energy corridors effective upon signing of the Record(s) of
Decision.
No Action Alternative
Under the No Action alternative, no new energy corridors would be
designated through this coordinated approach. The No Action alternative
will identify the environmental impacts associated with each of the
Agencies continuing to designate energy corridors through use of their
present practices. These practices would include the application of
local planning criteria by each regional land management office.
Increased Utilization Alternative
Under the Increased Utilization alternative, the Agencies will
assess the environmental impacts associated with increasing the
capacity of existing energy corridors through the application of new
technologies and/or operational techniques. This alternative will
assesss the impacts of developing multiple projects within existing
corridors and rights-of-way and the application of new technologies to
increase the energy capacities of existing facilities within those
corridors.
New Corridor Alternative
Under the New Corridor alternative, the Agencies will assess the
impacts associated with designating new energy corridors on Federal
land. A preliminary set of new corridors will be identified through
information obtained through scoping as well as information from the
energy transport industry including, but not limited to: The Western
Utility Group; the Seams Steering Group--Western Interconnection;
Colorado Coordinating Planning Group; the Northwest Transmission
Assessment Committee; the Southwest Area Transmission Study; the
Southwest Transmission Expansion Plan; and the Rocky Mountain Area
Transmission Study. The scoping process will afford other stakeholders
such as environmental groups, counties, states, Native American tribes,
and interested citizens an opportunity to propose new corridors. The
Agencies will use this information to identify new energy corridors
that will be analyzed in the PEIS.
Optimization Criteria Alternative
Under the Optimization Criteria alternative, the Agencies will
assess the impacts of new energy corridors that will be identified
through a combination of new and existing corridors based on a set of
criteria and strategies that incorporate environmental concerns,
projected supply and demand, network efficiencies, landscape features,
the availability of new technologies, and costs.
The Agencies will consider any additional reasonable alternatives
that result from comments received in response to the scoping process
described in this notice.
Identification of Environmental Issues
Note that environmental issues identified should be related to:
Restriction of conflicting uses within the corridors, adequacy of
potential plan direction within the corridors, any identifiable
environmental concerns within the potential corridors. Any corridor
designation, and subsequent incorporation into an agencies land use
plan by this plan amendment process does not, itself, authorize project
activities. Any new proposed project activities, such as construction
of a new pipeline or electric transmission line or retrofitting
utilities within an existing corridor, would be analyzed in subsequent
NEPA analyses which would also involve public notice and comment. This
PEIS is for corridor designation only.
The purpose of this notice is to solicit comments and suggestions
for consideration in the preparation of the PEIS. As background for
public comment, this notice contains a list of potential environmental
issues that the Agencies have tentatively identified for analysis. This
list is not intended to be all-inclusive or to imply any
predetermination of impacts. Following is a preliminary list of issues
that may be analyzed in the PEIS:
[[Page 56649]]
(1) Socioeconomic and recreational impacts of development of the
land tracts and their subsequent uses;
(2) Impacts on protected, threatened, endangered, or sensitive
species of animals or plants, or their critical habitats;
(3) Impacts on floodplains and wetlands;
(4) Impacts on archaeological, cultural, or historic resources;
(5) Impacts on human health and safety;
(6) Impacts on existing and future land uses;
(7) Visual impacts; and
(8) Disproportionately high and adverse impacts on minority and
low-income populations, also known as environmental justice
considerations.
Scoping Process
Interested parties are invited to participate in the scoping
process, both to refine the preliminary alternatives and environmental
issues to be analyzed in depth and to eliminate from detailed study
those alternatives and environmental issues that are not feasible or
pertinent. The scoping process is intended to involve all interested
agencies (Federal, State, county, and local), public interest groups,
Native American tribes, businesses, and members of the public. Public
scoping meetings will be held as indicated above under the DATES and
ADDRESSES sections. These scoping meetings will be informal. The
presiding officer will establish only those procedures needed to ensure
that everyone who wishes to speak has a chance to do so and that the
Agencies understand all issues and comments. Speakers will be allocated
approximately 5 minutes for their oral statements. Depending upon the
number of persons wishing to speak, the presiding officer may allow
longer times for representatives of organizations. Consequently,
persons wishing to speak on behalf of an organization should identify
that organization in their request to speak. Persons who have not
submitted a request to speak in advance may register to speak at the
scoping meeting(s), but advance requests are encouraged. Meetings will
begin at the times specified and will continue until all those present
who wish to participate have had an opportunity to do so. Should any
speaker desire to provide for the record further information that
cannot be presented within the designated time, such additional
information may be submitted in writing by the date listed in the DATES
section.
Oral, written, and electronic (i.e., by facsimile or by e-mail)
comments will be impartially considered and given equal weight by the
Agencies.
A complete transcript of the public scoping meetings will be
retained by the Agencies and made available to the public for review on
the DOE Web site at https://www.electricity.doe.gov, on the project Web
site at https://corridoreis.anl.gov, and during business hours at the
Department of Energy, Freedom of Information Reading Room, Forrestal
Building, 1000 Independence Avenue, SW., Washington, DC.
Draft PEIS Schedule and Availability
The Draft PEIS is scheduled to be issued in early spring 2006. The
availability of the Draft PEIS and dates for public hearings soliciting
comments on it will be announced in the Federal Register and local
media. Comments on the Draft PEIS will be considered in preparing the
Final PEIS.
Those interested parties who do not wish to submit comments at this
time, but who would like to receive a copy of the Draft PEIS and other
project materials, please contact Julia Souder as provided in the
ADDRESSES section of this notice.
Tom Lonnie,
Assistant Director, Minerals, Realty and Resource Protection, Bureau of
Land Management.
John Spitaleri Shaw,
Assistant Secretary for Environment, Safety and Health, Department of
Energy.
[FR Doc. 05-19375 Filed 9-27-05; 8:45 am]
BILLING CODE 6450-01-P