Environmental Impacts Statements; Notice of Availability, 54740 [05-18429]
Download as PDF
54740
Federal Register / Vol. 70, No. 179 / Friday, September 16, 2005 / Notices
Genetic Purity of the Westslope
Cutthroat Trout Population, Flathead
National Forest, Flathead River,
Flathead, Powell and Missoula
Counties, MT.
Summary: EPA expressed
environmental concerns about potential
impacts to aquatic ecosystem integrity,
particularly effects to non-target species,
and ecological impacts of restocking
historically fishless lakes. EPA
emphasizes the need to follow strict
pesticide application protocols with
appropriate management and mitigation
measures, and establishment of a
comprehensive monitoring and adaptive
management program to minimize
ecological and public health risks
during project implementation.
EIS No. 20050335, ERP No. FS–AFS–
J65419–MT, Gallatin National Forest,
Updated Information, Replaces the
Effects Analysis for the Northern
Goshawk in the Main Boulder Fuels
Reduction Project (FEIS),
Implementation, Gallatin National
Forest, Big Timber Ranger District,
Sweetgrass and Park Counties, MT.
Summary: EPA has no objections to
the proposed action and supports the
proposed ecological effects monitoring.
Dated: September 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–18428 Filed 9–15–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6667–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/06/2005 Through 09/09/2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050372, Final EIS, AFS, AZ,
Pickett Lake and Padre Canyon
Allotments Cattle Grazing
Management, Authorization and
Implementation, Coconino National
Forest, Mormon Lake Ranger District,
Coconino County, AZ, Wait Period
Ends: 10/17/2005, Contact: Katherine
Sanchez Meador 928–526–0866.
EIS No. 20050373, Final EIS, COE, MO,
Howard Bend Floodplain Area Study,
Improvements for Future Land,
Future Road, and Stormwater
VerDate Aug<31>2005
15:04 Sep 15, 2005
Jkt 205001
Management, Missouri River Flood
Developments, U.S. Army COE
Section 10 and 404 Permits, St. Louis
County, MO, Wait Period Ends: 10/
17/2005, Contact: Danny McClendon
314–331–8574.
EIS No. 20050374, Draft EIS, BLM, CA,
Ukiah Resource Management Plan,
Implementation, Several Counties,
CA, Comment Period Ends: 12/15/
2005, Contact: Eli Ilano 916–978–
4427.
EIS No. 20050375, Draft Supplement,
FHW, TN, TN–397 (Mack Hatcher
Parkway Extension) Construction
from US–31 (TN–6, Columbia
Avenue) South of Franklin to US–341
(TN–106, Hillsboro Road) North of
Franklin, Additional Information on
the Build Alternative (Alternative G),
Williamson County and City of
Franklin, TN , Comment Period Ends:
10/31/2005, Contact: Walter Boyd
615–781–5774.
EIS No. 20050376, Final EIS, COE, TX,
Cedar Bayou Navigation Chanel
(CBNC.) Improvement Project,
Implementation, Near Baytown in
Harris and Chambers Counties, TX,
Wait Period Ends: 10/17/2005,
Contact: Dr. Terry Roberts 409–766–
3035.
EIS No. 20050377, Draft EIS, COE, NY,
Montuak Point Storm Damage
Reduction Project, Proposed
Reinforcement of an Existing Stone
Revetment Wall, Suffolk County, NY,
Comment Period Ends: 10/31/2005
Contact: Dr. Christopher Ricciardi
917–790–8630.
EIS No. 20050378, Draft EIS, COE, NJ,
Liberty State Park Ecosystem
Restoration Project, Hudson Raritan
Estuary Study, To Address the
Adverse Impacts Associated with Past
Filling Activities, Port Authority of
New York and New Jersey, Jersey
City, Hudson County, NJ , Comment
Period Ends: 10/24/2005, Contact:
Robert Will 917–790–8635. Revision
to FR Notice Published on 9/16/2005:
Due to an Administrative Error by the
U.S. Army COE the above Draft EIS
was not properly filed with the U.S.
EPA. COE has confirmed that
distribution of the Draft EIS was made
available to all Federal Agencies and
interested parties for the 45-day
review period that will end on 10/24/
2005.
Amended Notices
EIS No. 20050291, Final EIS, AFS, CO,
Gold Camp Road Plan, Develop a
Feasible Plan to Manage the
Operation of Tunnel #3 and the 8.5
mile Road Segment, Pike National
Forest, Pikes Peak Ranger District,
Colorado Springs, El Paso County,
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
CO, Wait Period Ends: 11/07/2005,
Contact: Frank Landis 719–477–4203.
Revision to FR Notice Published on
7/22/2005. Refiling of Final EIS Per
Agencies Request, the Wait Period
will End on 11/07/2005.
EIS No. 20050292, Draft EIS, USA, HI,
Makua Military Reservation (MMR)
Project, Proposed Military Training
Activities, 25th Infantry Division
(Light) and U.S. Army, HI, Comment
Period Ends: 10/06/2005, Contact:
Gary Shirakata 808–438–0772.
Revision to FR Notice Published on
7/22/2005. Extending the Comment
Period from 9/21/2005 to 10/06/2005.
EIS No. 20050298, Draft EIS, AFS, UT,
West Bear Vegetation Management
Project, Timber Harvesting, Prescribed
Burning, Roads Construction,
Township 1 North, Range 9 East, Salt
Lake Principle Meridian, Evanston
Ranger District, Wasatch-Cache
National Forest, Summit County, UT,
Comment Period Ends: 09/30/2005,
Contact: Larry Johnson 307–789–
3194. Revision of FR Notice Published
on 7/22/2005. Extending the
Comment Period from 9/06/2005 to
9/30/2005.
EIS No. 20050351, Draft EIS, SFW, CA,
East Contra Costa County Habitat
Conservation Plan and Natural
Community Conservation Plan,
Implementation, Incidental Take
Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa
County, CA, Comment Period Ends:
12/01/2005, Contact: Sheila Larsen
916–444–6600. Revision to FR Notice
Published on 9/2/2005. Comment
Period Extended from 10/17/2005 to
12/01/2005.
Dated: September 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–18429 Filed 9–15–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[OPPT–2002–0001; FRL–7738–5]
National Pollution Prevention and
Toxics Advisory Committee (NPPTAC);
Interim Ad Hoc Nanotechnology Work
Group; Notice of Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: Under the Federal Advisory
Committee Act (FACA), 5 U.S. App. 2
(Public Law 92–463), EPA gives notice
of an all day meeting of the National
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 70, Number 179 (Friday, September 16, 2005)]
[Notices]
[Page 54740]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-18429]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6667-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/06/2005 Through 09/09/2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050372, Final EIS, AFS, AZ, Pickett Lake and Padre Canyon
Allotments Cattle Grazing Management, Authorization and Implementation,
Coconino National Forest, Mormon Lake Ranger District, Coconino County,
AZ, Wait Period Ends: 10/17/2005, Contact: Katherine Sanchez Meador
928-526-0866.
EIS No. 20050373, Final EIS, COE, MO, Howard Bend Floodplain Area
Study, Improvements for Future Land, Future Road, and Stormwater
Management, Missouri River Flood Developments, U.S. Army COE Section 10
and 404 Permits, St. Louis County, MO, Wait Period Ends: 10/17/2005,
Contact: Danny McClendon 314-331-8574.
EIS No. 20050374, Draft EIS, BLM, CA, Ukiah Resource Management Plan,
Implementation, Several Counties, CA, Comment Period Ends: 12/15/2005,
Contact: Eli Ilano 916-978-4427.
EIS No. 20050375, Draft Supplement, FHW, TN, TN-397 (Mack Hatcher
Parkway Extension) Construction from US-31 (TN-6, Columbia Avenue)
South of Franklin to US-341 (TN-106, Hillsboro Road) North of Franklin,
Additional Information on the Build Alternative (Alternative G),
Williamson County and City of Franklin, TN , Comment Period Ends: 10/
31/2005, Contact: Walter Boyd 615-781-5774.
EIS No. 20050376, Final EIS, COE, TX, Cedar Bayou Navigation Chanel
(CBNC.) Improvement Project, Implementation, Near Baytown in Harris and
Chambers Counties, TX, Wait Period Ends: 10/17/2005, Contact: Dr. Terry
Roberts 409-766-3035.
EIS No. 20050377, Draft EIS, COE, NY, Montuak Point Storm Damage
Reduction Project, Proposed Reinforcement of an Existing Stone
Revetment Wall, Suffolk County, NY, Comment Period Ends: 10/31/2005
Contact: Dr. Christopher Ricciardi 917-790-8630.
EIS No. 20050378, Draft EIS, COE, NJ, Liberty State Park Ecosystem
Restoration Project, Hudson Raritan Estuary Study, To Address the
Adverse Impacts Associated with Past Filling Activities, Port Authority
of New York and New Jersey, Jersey City, Hudson County, NJ , Comment
Period Ends: 10/24/2005, Contact: Robert Will 917-790-8635. Revision to
FR Notice Published on 9/16/2005: Due to an Administrative Error by the
U.S. Army COE the above Draft EIS was not properly filed with the U.S.
EPA. COE has confirmed that distribution of the Draft EIS was made
available to all Federal Agencies and interested parties for the 45-day
review period that will end on 10/24/2005.
Amended Notices
EIS No. 20050291, Final EIS, AFS, CO, Gold Camp Road Plan, Develop a
Feasible Plan to Manage the Operation of Tunnel 3 and the 8.5
mile Road Segment, Pike National Forest, Pikes Peak Ranger District,
Colorado Springs, El Paso County, CO, Wait Period Ends: 11/07/2005,
Contact: Frank Landis 719-477-4203. Revision to FR Notice Published on
7/22/2005. Refiling of Final EIS Per Agencies Request, the Wait Period
will End on 11/07/2005.
EIS No. 20050292, Draft EIS, USA, HI, Makua Military Reservation (MMR)
Project, Proposed Military Training Activities, 25th Infantry Division
(Light) and U.S. Army, HI, Comment Period Ends: 10/06/2005, Contact:
Gary Shirakata 808-438-0772. Revision to FR Notice Published on 7/22/
2005. Extending the Comment Period from 9/21/2005 to 10/06/2005.
EIS No. 20050298, Draft EIS, AFS, UT, West Bear Vegetation Management
Project, Timber Harvesting, Prescribed Burning, Roads Construction,
Township 1 North, Range 9 East, Salt Lake Principle Meridian, Evanston
Ranger District, Wasatch-Cache National Forest, Summit County, UT,
Comment Period Ends: 09/30/2005, Contact: Larry Johnson 307-789-3194.
Revision of FR Notice Published on 7/22/2005. Extending the Comment
Period from 9/06/2005 to 9/30/2005.
EIS No. 20050351, Draft EIS, SFW, CA, East Contra Costa County Habitat
Conservation Plan and Natural Community Conservation Plan,
Implementation, Incidental Take Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa County, CA, Comment Period Ends: 12/
01/2005, Contact: Sheila Larsen 916-444-6600. Revision to FR Notice
Published on 9/2/2005. Comment Period Extended from 10/17/2005 to 12/
01/2005.
Dated: September 13, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-18429 Filed 9-15-05; 8:45 am]
BILLING CODE 6560-50-P