Virginia Hydrogeneration and Historical Society, L.C.; Notice of Availability of Environmental Assessment, 54042 [E5-4990]
Download as PDF
54042
Federal Register / Vol. 70, No. 176 / Tuesday, September 13, 2005 / Notices
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other and the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Magalie R. Salas,
Secretary.
[FR Doc. E5–4981 Filed 9–12–05; 8:45 am]
September 8, 2005.
BILLING CODE 6717–01–P
VerDate Aug<18>2005
16:06 Sep 12, 2005
Jkt 205001
STATUS:
Federal Energy Regulatory
Commission
[Project No. 8535–039]
Virginia Hydrogeneration and
Historical Society, L.C.; Notice of
Availability of Environmental
Assessment
September 7, 2005.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR part 380),
Commission staff have reviewed an
application to surrender the license for
the Battersea Project, filed December 20,
2004. The project is located on The
Appomattox River, in the City of
Petersburg, Virginia.
Commission staff prepared an
environmental assessment (EA),
analyzing the probable environmental
effects of the proposed surrender, and
has concluded that approval of the
surrender request would not constitute
a major federal action significantly
affecting the quality of the human
environment.
A copy of the EA is attached to the
Commission order titled ‘‘Order
Conditionally Accepting Surrender of
License,’’ issued September 6, 2005, and
is available for review at the
Commission’s Public Reference Room.
A copy of the EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the ‘‘elibrary’’
link. Enter the docket number (P–8535)
in the docket number field to access the
document. For assistance, call (202)
502–8222, or (202) 502–8659 (for TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E5–4990 Filed 9–12–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: September 15, 2005, 10
a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Open.
Agenda
(*Note—Items listed on the agenda may
be deleted without further notice.)
CONTACT PERSON FOR MORE INFORMATION:
Magalie R. Salas, Secretary, Telephone
(202) 502–8400. (For a recording listing
items stricken from or added to the
meeting, call (202) 502–8627.)
This is a list of matters to be
considered by the Commission. It does
not include a listing of all papers
relevant to the items on the agenda;
however, all public documents may be
examined in the Public Reference Room.
MATTERS TO BE CONSIDERED:
896th—Meeting
Regular Meeting, September 15, 2005,
10 a.m.
Administrative Agenda
A–1
Docket# AD02–1–000, Agency
Administrative Matters
A–2
Docket# AD02–7–000, Customer Matters,
Reliability, Security and Market
Operations
Markets, Tariffs, and Rates—Electric
E–1
Docket# RM05–25–000, Preventing Undue
Discrimination and Preference in
Transmission Service
E–2
Docket# RM05–6–000, Commission
Authorization to Hold Interlocking
Positions
E–3
Docket# ER05–1118–000, Southwest Power
Pool, Inc.
E–4
Docket# ER05–1228–000, ER05–1228–001,
Sea Breeze Pacific Juan de Fuca Cable,
LP
E–5
Docket# ER05–1047–000, ER05–1047–001,
ER05–1048–000, ER05–1048–001,
Midwest Independent Transmission
System Operator, Inc.
E–6
Docket# ER05–1230–000, Midwest
Independent Transmission System
Operator, Inc.
E–7
Omitted
E–8
Docket# EL05–68–000, TECO–PANDA
Generating Company, L.P.
ER05–1164–000, ER05–1164–001, TPGC,
LP
ER05–1239–000, TPS Dell, LLC
ER05–1240–000, TPS McAdams, LLC
E–9
Docket# ER05–1217–000, ER05–1217–001,
Black Hills Power, Inc.
E–10
Omitted
E–11
Docket# EL05–134–000, Indiana Municipal
Power Agency
E–12
Docket# EL02–123–007, Boston Edison
Company
E:\FR\FM\13SEN1.SGM
13SEN1
Agencies
[Federal Register Volume 70, Number 176 (Tuesday, September 13, 2005)]
[Notices]
[Page 54042]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4990]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8535-039]
Virginia Hydrogeneration and Historical Society, L.C.; Notice of
Availability of Environmental Assessment
September 7, 2005.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's (Commission)
regulations (18 CFR part 380), Commission staff have reviewed an
application to surrender the license for the Battersea Project, filed
December 20, 2004. The project is located on The Appomattox River, in
the City of Petersburg, Virginia.
Commission staff prepared an environmental assessment (EA),
analyzing the probable environmental effects of the proposed surrender,
and has concluded that approval of the surrender request would not
constitute a major federal action significantly affecting the quality
of the human environment.
A copy of the EA is attached to the Commission order titled ``Order
Conditionally Accepting Surrender of License,'' issued September 6,
2005, and is available for review at the Commission's Public Reference
Room. A copy of the EA may also be viewed on the Commission's Web site
at https://www.ferc.gov using the ``elibrary'' link. Enter the docket
number (P-8535) in the docket number field to access the document. For
assistance, call (202) 502-8222, or (202) 502-8659 (for TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E5-4990 Filed 9-12-05; 8:45 am]
BILLING CODE 6717-01-P