Virginia Hydrogeneration and Historical Society, L.C.; Notice of Availability of Environmental Assessment, 54042 [E5-4990]

Download as PDF 54042 Federal Register / Vol. 70, No. 176 / Tuesday, September 13, 2005 / Notices and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other and the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Magalie R. Salas, Secretary. [FR Doc. E5–4981 Filed 9–12–05; 8:45 am] September 8, 2005. BILLING CODE 6717–01–P VerDate Aug<18>2005 16:06 Sep 12, 2005 Jkt 205001 STATUS: Federal Energy Regulatory Commission [Project No. 8535–039] Virginia Hydrogeneration and Historical Society, L.C.; Notice of Availability of Environmental Assessment September 7, 2005. In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Energy Regulatory Commission’s (Commission) regulations (18 CFR part 380), Commission staff have reviewed an application to surrender the license for the Battersea Project, filed December 20, 2004. The project is located on The Appomattox River, in the City of Petersburg, Virginia. Commission staff prepared an environmental assessment (EA), analyzing the probable environmental effects of the proposed surrender, and has concluded that approval of the surrender request would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is attached to the Commission order titled ‘‘Order Conditionally Accepting Surrender of License,’’ issued September 6, 2005, and is available for review at the Commission’s Public Reference Room. A copy of the EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘elibrary’’ link. Enter the docket number (P–8535) in the docket number field to access the document. For assistance, call (202) 502–8222, or (202) 502–8659 (for TTY). Magalie R. Salas, Secretary. [FR Doc. E5–4990 Filed 9–12–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: September 15, 2005, 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Open. Agenda (*Note—Items listed on the agenda may be deleted without further notice.) CONTACT PERSON FOR MORE INFORMATION: Magalie R. Salas, Secretary, Telephone (202) 502–8400. (For a recording listing items stricken from or added to the meeting, call (202) 502–8627.) This is a list of matters to be considered by the Commission. It does not include a listing of all papers relevant to the items on the agenda; however, all public documents may be examined in the Public Reference Room. MATTERS TO BE CONSIDERED: 896th—Meeting Regular Meeting, September 15, 2005, 10 a.m. Administrative Agenda A–1 Docket# AD02–1–000, Agency Administrative Matters A–2 Docket# AD02–7–000, Customer Matters, Reliability, Security and Market Operations Markets, Tariffs, and Rates—Electric E–1 Docket# RM05–25–000, Preventing Undue Discrimination and Preference in Transmission Service E–2 Docket# RM05–6–000, Commission Authorization to Hold Interlocking Positions E–3 Docket# ER05–1118–000, Southwest Power Pool, Inc. E–4 Docket# ER05–1228–000, ER05–1228–001, Sea Breeze Pacific Juan de Fuca Cable, LP E–5 Docket# ER05–1047–000, ER05–1047–001, ER05–1048–000, ER05–1048–001, Midwest Independent Transmission System Operator, Inc. E–6 Docket# ER05–1230–000, Midwest Independent Transmission System Operator, Inc. E–7 Omitted E–8 Docket# EL05–68–000, TECO–PANDA Generating Company, L.P. ER05–1164–000, ER05–1164–001, TPGC, LP ER05–1239–000, TPS Dell, LLC ER05–1240–000, TPS McAdams, LLC E–9 Docket# ER05–1217–000, ER05–1217–001, Black Hills Power, Inc. E–10 Omitted E–11 Docket# EL05–134–000, Indiana Municipal Power Agency E–12 Docket# EL02–123–007, Boston Edison Company E:\FR\FM\13SEN1.SGM 13SEN1

Agencies

[Federal Register Volume 70, Number 176 (Tuesday, September 13, 2005)]
[Notices]
[Page 54042]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4990]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8535-039]


Virginia Hydrogeneration and Historical Society, L.C.; Notice of 
Availability of Environmental Assessment

September 7, 2005.
    In accordance with the National Environmental Policy Act of 1969, 
as amended, and the Federal Energy Regulatory Commission's (Commission) 
regulations (18 CFR part 380), Commission staff have reviewed an 
application to surrender the license for the Battersea Project, filed 
December 20, 2004. The project is located on The Appomattox River, in 
the City of Petersburg, Virginia.
    Commission staff prepared an environmental assessment (EA), 
analyzing the probable environmental effects of the proposed surrender, 
and has concluded that approval of the surrender request would not 
constitute a major federal action significantly affecting the quality 
of the human environment.
    A copy of the EA is attached to the Commission order titled ``Order 
Conditionally Accepting Surrender of License,'' issued September 6, 
2005, and is available for review at the Commission's Public Reference 
Room. A copy of the EA may also be viewed on the Commission's Web site 
at https://www.ferc.gov using the ``elibrary'' link. Enter the docket 
number (P-8535) in the docket number field to access the document. For 
assistance, call (202) 502-8222, or (202) 502-8659 (for TTY).

Magalie R. Salas,
Secretary.
[FR Doc. E5-4990 Filed 9-12-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.