Oklahoma Municipal Power Authority and American Electric Power Service Corporation; Notice of Compliance Filing, 53789 [E5-4958]

Download as PDF Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on September 21, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–4966 Filed 9–9–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL05–38–003] Oklahoma Municipal Power Authority and American Electric Power Service Corporation; Notice of Compliance Filing Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. eastern time on September 23, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–4958 Filed 9–9–05; 8:45 am] BILLING CODE 6717–01–P September 6, 2005. Take notice that on August 24, 2005, American Electric Power Service Corporation (AEP) submitted an unexecuted Network Integration Transmission Service Agreement with Oklahoma Municipal Power Authority pursuant to the Order Denying Rehearing and Conditionally Accepting Compliance Filing, Instituting Investigation, and Establishing Refund Effective Date and Hearing and Settlement Judge Procedures issued in Oklahoma Municipal Power Authority v. American Electric Power Service Corp., 112 FERC ¶ 61,107 (2005). AEP states that copies of the filing were served on parties on the official service list. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and VerDate Aug<18>2005 15:25 Sep 09, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 September 6, 2005. Take notice that the Commission received the following electric rate filings. Docket Numbers: ER02–2227–003, ER02–2229–002, ER03–24–002, ER03– 36–003. Applicants: Creed Energy Center, LLC, Goose Haven Energy Center, LLC; Los Esteros Critical Energy Facility, LLC; Calpine Northbrook Energy Marketing, LLC. Description: The above referenced applicants, together, Calpine Entities, submit a joint updated market power analysis. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 53789 Filed Date: 08/30/2005. Accession Number: 20050902–0009. Comment Date: 5 p.m. eastern time on Tuesday, September 20, 2005. Docket Numbers: ER04–445–012. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corp.,submits its interim Standard Large Generator Interconnection Procedures. Filed Date: 08/30/2005. Accession Number: 20050902–0010. Comment Date: 5 p.m. eastern time on Tuesday, September 20, 2005. Docket Numbers: ER99–230–009, ER03–762–009, ER03–533–002. Applicants: Alliant Energy Corporate Services, Inc., Alliant Energy Neenah, LLC. Description: Alliant Energy Corporate Services, Inc., on behalf of itself and Alliant Energy Neenah, LLC, makes corrections to their June 30, 2005 filing pertaining to the wholesale power sales for AECs’s market based rate. Filed Date: 08/30/2005. Accession Number: 20050902–0011. Comment Date: 5 p.m. eastern time on Tuesday, September 20, 2005. Docket Numbers: ER05–1333–000, ER05–1421–000. Applicants: Southern Company Services, Inc. Description: Southern Company Services, Inc. on behalf of Southern Companies submits revisions to the Large Generator Interconnection Procedures in compliance with Order 2003–C and Order No. 2006, to become effective 8/15/05. Filed Date: 08/15/2005. Accession Number: 20050816–0194. Comment Date: 5 p.m. eastern time on Tuesday, September 06, 2005. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. E:\FR\FM\12SEN1.SGM 12SEN1

Agencies

[Federal Register Volume 70, Number 175 (Monday, September 12, 2005)]
[Notices]
[Page 53789]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4958]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL05-38-003]


Oklahoma Municipal Power Authority and American Electric Power 
Service Corporation; Notice of Compliance Filing

September 6, 2005.
    Take notice that on August 24, 2005, American Electric Power 
Service Corporation (AEP) submitted an unexecuted Network Integration 
Transmission Service Agreement with Oklahoma Municipal Power Authority 
pursuant to the Order Denying Rehearing and Conditionally Accepting 
Compliance Filing, Instituting Investigation, and Establishing Refund 
Effective Date and Hearing and Settlement Judge Procedures issued in 
Oklahoma Municipal Power Authority v. American Electric Power Service 
Corp., 112 FERC ] 61,107 (2005).
    AEP states that copies of the filing were served on parties on the 
official service list.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. eastern time on September 23, 2005.

Magalie R. Salas,
Secretary.
[FR Doc. E5-4958 Filed 9-9-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.