CenterPoint Energy-Mississippi River Transmission Corporation et al.; Notice of Proposed Changes in FERC Gas Tariff, 53787 [E5-4956]
Download as PDF
Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices
the Draft EIS: the Consolidated
Corridors Route, and the MEPCO South
Route. DOE also analyzed a rescission
alternative under which the existing
permit would be rescinded and no
international transmission line could be
constructed. As indicated in the Draft
EIS, DOE has designated the Modified
Consolidated Corridors Route as its
preferred alternative.
Availability of the Draft EIS
DOE has distributed copies of the
Draft EIS to appropriate members of
Congress, state and local government
officials in Maine, American Indian
tribal governments, and other Federal
agencies, groups, and interested parties.
Copies of the document may be
obtained by contacting DOE as provided
in the ADDRESSES section of this notice.
Copies of the Draft EIS are also available
for inspection at the locations identified
below:
1. Bangor Public Library, 145 Harlow
St., Bangor, ME 04401.
2. Brewer Public Library, 24 Union
St., Brewer, ME 04412.
3. Calais Free Library, 9 Union St.,
Calais, ME 04619.
4. Orrington Public Library, 15 School
St., Orrington, ME 04474.
5. Princeton Public Library, Main
Street, Princeton, ME 04668.
6. Baileyville Public Library, 169
Main Street, Baileyville, ME 04694.
Issued in Washington, DC, on September 6,
2005.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 05–18023 Filed 9–9–05; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[RP05–544–000, et al.]
CenterPoint Energy—Mississippi River
Transmission Corporation et al.;
Notice of Proposed Changes in FERC
Gas Tariff
September 2, 2005.
In the matter of: RP05–570–000, RP05–
570–000, RP05–575–000, RP05–548–000,
RP05–576–000, RP05–541–000, RP05–539–
000, RP05–540–000, RP05–542–000, RP05–
563–000, RP05–400–001, RP05–547–000,
RP05–554–000, RP05–568–000, RP05–562–
000, RP05–538–000, RP05–577–000, RP05–
545–000, RP05–558–000, RP05–569–000,
RP05–557–000, RP05–551–000, RP05–555–
000, RP05–455–001, RP05–571–000, RP05–
592–000, RP05–572–000, RP05–543–000,
RP05–556–000, RP05–561–000, RP05–578–
000, RP05–579–000: Chandeleur Pipe Line
VerDate Aug<18>2005
17:17 Sep 09, 2005
Jkt 205001
Company, Chandeuleur Pipe Line Company,
Colorado Interstate Gas Company, Eastern
Shore Natural Gas Company, El Paso Natural
Gas Company, Enbridge Pipelines (AlaTenn)
L.L.C., Enbridge Pipelines (KPC), Enbridge
Pipelines (Midla) L.L.C., Garden Banks Gas
Pipeline, L.L.C., Guardian Pipeline, L.L.C.,
Gulf South Pipeline Company, LP, Kern
River Gas Transmission Company, Kinder
Morgan Interstate Gas Transmission LLC, KO
Transmission Company, Midwestern Gas
Transmission Company, Mississippi Canyon
Gas Pipeline, LLC, Mojave Pipeline
Company, Nautilus Pipeline Company,
L.L.C., Northeast Pipeline Corporation, Ozark
Gas Transmission, L.L.C., Panther Interstate
Pipeline Energy, LLC., Questar Pipeline
Company, Questar Southern Trails Pipeline
Company, Sabine Pipe Line LLC, Sabine Pipe
Line LLC, SCG Pipeline, Inc., Southern Star
Central Gas Pipeline, Inc., Stingray Pipeline
Company, L.L.C., TransColorado Gas
Transmission Company, Viking Gas
Transmission Company, Wyoming Interstate
Company, Ltd., Young Gas Storage Company,
Ltd.
Take notice that the above-referenced
pipelines tendered for filing their tariff
sheets respectively, pursuant to Section
154.402 of the Commission’s
regulations, to reflect the Commission’s
change in the unit rate for the Annual
Charge Adjustment (ACA) surcharge to
be applied to rates for recovery of 2005
Annual Charges. The proposed effective
date of the tariff sheets is October 1,
2005.
The above-referenced pipelines state
that the purpose of their filings is to
reflect the revised ACA effective for the
twelve-month period beginning October
1, 2005. The pipelines further state that
their tariff sheets reflect a decrease of
$0.0001 per Dth in the ACA adjustment
surcharge, resulting in a new ACA rate
of $0.0018 Dth as specified by the
Commission in its invoice dated June
30, 2005, for the Annual Charge
Billing—Fiscal year 2005.
Due to the large number of pipelines
that have filed to comply with the
Annual Charge Adjustment Billing, the
Commission is issuing this single notice
of the filings included in the caption.
Any person desiring to become part in
any of the listed dockets must file a
separate motion to intervene in each
docket for which they wish party status.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
53787
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Intervention, Protest Date: 5 p.m.
eastern time on September 13, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4956 Filed 9–9–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2602]
Duke Power, a Division of Duke Energy
Corporation, Nantahala Area; Notice of
Authorization or Continued Project
Operation
September 6, 2005.
On July 22, 2003, Duke Power, a
division of Duke Energy Corporation,
Nantahala Area, licensee for the
Dillsboro Project No. 2602, filed an
application for subsequent license
pursuant to the Federal Power Act
(FPA) and the Commission’s
regulations. The application for
subsequent license will be held in
abeyance pending Commission
processing of a surrender application
filed on June 1, 2004. Project No. 2602
is located on the Tuckasegee River in
Jackson County, North Carolina.
E:\FR\FM\12SEN1.SGM
12SEN1
Agencies
[Federal Register Volume 70, Number 175 (Monday, September 12, 2005)]
[Notices]
[Page 53787]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4956]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[RP05-544-000, et al.]
CenterPoint Energy--Mississippi River Transmission Corporation et
al.; Notice of Proposed Changes in FERC Gas Tariff
September 2, 2005.
In the matter of: RP05-570-000, RP05-570-000, RP05-575-000,
RP05-548-000, RP05-576-000, RP05-541-000, RP05-539-000, RP05-540-
000, RP05-542-000, RP05-563-000, RP05-400-001, RP05-547-000, RP05-
554-000, RP05-568-000, RP05-562-000, RP05-538-000, RP05-577-000,
RP05-545-000, RP05-558-000, RP05-569-000, RP05-557-000, RP05-551-
000, RP05-555-000, RP05-455-001, RP05-571-000, RP05-592-000, RP05-
572-000, RP05-543-000, RP05-556-000, RP05-561-000, RP05-578-000,
RP05-579-000: Chandeleur Pipe Line Company, Chandeuleur Pipe Line
Company, Colorado Interstate Gas Company, Eastern Shore Natural Gas
Company, El Paso Natural Gas Company, Enbridge Pipelines (AlaTenn)
L.L.C., Enbridge Pipelines (KPC), Enbridge Pipelines (Midla) L.L.C.,
Garden Banks Gas Pipeline, L.L.C., Guardian Pipeline, L.L.C., Gulf
South Pipeline Company, LP, Kern River Gas Transmission Company,
Kinder Morgan Interstate Gas Transmission LLC, KO Transmission
Company, Midwestern Gas Transmission Company, Mississippi Canyon Gas
Pipeline, LLC, Mojave Pipeline Company, Nautilus Pipeline Company,
L.L.C., Northeast Pipeline Corporation, Ozark Gas Transmission,
L.L.C., Panther Interstate Pipeline Energy, LLC., Questar Pipeline
Company, Questar Southern Trails Pipeline Company, Sabine Pipe Line
LLC, Sabine Pipe Line LLC, SCG Pipeline, Inc., Southern Star Central
Gas Pipeline, Inc., Stingray Pipeline Company, L.L.C., TransColorado
Gas Transmission Company, Viking Gas Transmission Company, Wyoming
Interstate Company, Ltd., Young Gas Storage Company, Ltd.
Take notice that the above-referenced pipelines tendered for filing
their tariff sheets respectively, pursuant to Section 154.402 of the
Commission's regulations, to reflect the Commission's change in the
unit rate for the Annual Charge Adjustment (ACA) surcharge to be
applied to rates for recovery of 2005 Annual Charges. The proposed
effective date of the tariff sheets is October 1, 2005.
The above-referenced pipelines state that the purpose of their
filings is to reflect the revised ACA effective for the twelve-month
period beginning October 1, 2005. The pipelines further state that
their tariff sheets reflect a decrease of $0.0001 per Dth in the ACA
adjustment surcharge, resulting in a new ACA rate of $0.0018 Dth as
specified by the Commission in its invoice dated June 30, 2005, for the
Annual Charge Billing--Fiscal year 2005.
Due to the large number of pipelines that have filed to comply with
the Annual Charge Adjustment Billing, the Commission is issuing this
single notice of the filings included in the caption.
Any person desiring to become part in any of the listed dockets
must file a separate motion to intervene in each docket for which they
wish party status.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the date as indicated
below. Anyone filing an intervention or protest must serve a copy of
that document on the Applicant. Anyone filing an intervention or
protest on or before the intervention or protest date need not serve
motions to intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Intervention, Protest Date: 5 p.m. eastern time on September 13,
2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5-4956 Filed 9-9-05; 8:45 am]
BILLING CODE 6717-01-P