New York Power Authority; Notice of Application Tendered for Filing With the Commission, Notice of Offer of Settlement, and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 52379-52380 [E5-4818]
Download as PDF
Federal Register / Vol. 70, No. 170 / Friday, September 2, 2005 / Notices
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4817 Filed 9–1–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2216–066]
New York Power Authority; Notice of
Application Tendered for Filing With
the Commission, Notice of Offer of
Settlement, and Establishing
Procedural Schedule for Relicensing
and a Deadline for Submission of Final
Amendments
August 26, 2005.
Take notice that the following
hydroelectric application and offer of
settlement have been filed with the
VerDate Aug<18>2005
18:00 Sep 01, 2005
Jkt 205001
Commission and are available for public
inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2216–066.
c. Date Filed: August 18, 2005 for
application; August 19, 2005 for offer of
settlement.
d. Applicant: New York Power
Authority.
e. Name of Project: Niagara Power
Project, which consists of the Lewiston
Pump Generating Plant and the Robert
Moses Niagara Power Plant.
f. Location: The Niagara Power Project
is located on the Niagara River in the
City of Niagara Falls and the Towns of
Niagara and Lewiston, in Niagara
County, New York.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Frederick E.
Chase, Executive Director of
Hydropower Relicensing, Power
Authority of the State of New York, 30
South Pearl Street, Albany, NY 12207–
3425, (518) 433–6738 or
chase.f@nypa.gov.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or stephen.kartalia@ferc.gov.
j. Cooperating agencies: We are asking
Federal, state, local, and tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues to cooperate with us in the
preparation of the environmental
document. Agencies who would like to
request cooperating status should follow
the instructions for filing such requests
described in item k below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Deadline to request cooperating
agency status: September 19, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
l. This application has not been
accepted for filing. We are not soliciting
motions to intervene, protests, or final
terms and conditions at this time.
However, a number of entities filed
motion to intervene prior to the
application being filed in this case.
Although these motions must be
rejected because there was no
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
52379
proceeding in which to intervene when
they were filed, once an application has
been filed, the Commission does accept
motions to intervene filed before public
notice of the application being accepted
is issued (see 75 FERC ¶ 61,318).
m. Description of Project: The existing
project has a conventional development
and a pumped storage development for
a total current installed capacity of
2,538 megawatts consisting of: (a) Two
700-foot-long intake structures located
on the upper Niagara River about 2.6
miles upstream from the American
Falls; (b) two 4.3-mile-long, 46-footwide by 66.5-foot-high concrete
underground water supply conduits; (c)
a forebay; (d) the 974-foot-long by 240foot-wide by 160-feet-high Lewiston
Pump-Generating Plant; (e) the 1,900acre Lewiston Reservoir at a maximum
water surface elevation of 658 feet
United States Lake Survey Datum; (f)
the Robert Moses Niagara power plant,
including an 1,100-foot-long by 190foot-wide by 100-foot-high intake
structure; (g) a switch yard; and (h)
appurtenant facilities.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Procedural schedule and final
amendments: At this time we anticipate
preparing a draft environmental impact
statement (DEIS). Recipients will have
45 days to provide the Commission with
any written comments on the DEIS. All
comments filed with the Commission
will be considered in the final
environmental impact statement (FEIS).
The application will be processed
according to the following schedule.
Revisions to the schedule will be made
as appropriate.
Notice of Acceptance of Application:
October 2005.
Notice of Application Ready for
Environmental Analysis: December
2005.
E:\FR\FM\02SEN1.SGM
02SEN1
52380
Federal Register / Vol. 70, No. 170 / Friday, September 2, 2005 / Notices
Notice of the Availability of the DEIS:
May 2006.
Notice of the Availability of the FEIS:
November 2006.
Ready for Commission’s decision on the
application: February 2007.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4818 Filed 9–1–05; 8:45 am]
of $9,016,929, (a 7.3 percent increase),
including the increase in the purchased
power adder, beginning January 1, 2006,
are needed to satisfy repayment criteria.
Page 48122, under SUPPLEMENTARY
INFORMATION, correct the second
sentence of the fourth paragraph to read:
The proposed new rates would
increase estimated annual revenues
from $124,325,100 to $133,342,029 and
would satisfy the present financial
criteria for repayment of the project and
transmission * * *.
BILLING CODE 6717–01–P
Dated: August 29, 2005.
Jon Worthington,
Assistant Administrator.
[FR Doc. 05–17501 Filed 9–1–05; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6450–01–P
Southwestern Power Administration
Integrated System Power Rates:
Correction
ENVIRONMENTAL PROTECTION
AGENCY
Southwestern Power
Administration, DOE.
ACTION: Correction to notice of proposed
rate increase.
[ER–FRL–6666–9]
AGENCY:
Southwestern Area Power
Administration published a document
in the Federal Register (70 FR 48121) on
August 16, 2005, announcing the public
review and comment period on
proposed rates. This rate proposal will
increase annual system revenues
approximately 7.3 percent from
$124,325,100 to $133,342,029.
Inadvertently, the amount of the
proposed increase for the purchased
power adder rate component ($227,100
or 0.2 percent) was not included in the
initial notice.
FOR FURTHER INFORMATION CONTACT: Mr.
Forrest E. Reeves, Assistant
Administrator, Office of Corporate
Operations, Southwestern Power
Administration, U.S. Department of
Energy, One West Third Street, Tulsa,
Oklahoma 74103, (918) 595–6696,
gene.reeves@swpa.gov.
SUMMARY:
Corrections
In the Federal Register on August 16,
2005, in FR Doc. 05–16190:
Page 48121, under SUMMARY, correct
the last sentence to read:
Beginning January 1, 2006, and
thereafter, the proposed rates would
increase annual system revenues
approximately 7.3 percent from
$124,325,100 to $133,342,029, which
includes an increase in the purchased
power adder.
Page 48122, under SUPPLEMENTARY
INFORMATION, correct the last sentence of
the third paragraph to read:
The Revised Power Repayment Study
shows that additional annual revenues
VerDate Aug<18>2005
18:00 Sep 01, 2005
Jkt 205001
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 08/22/2005 Through
08/26/2005. Pursuant to 40 CFR
1506.9.
EIS No. 20050351, Draft EIS, SFW, CA,
East Contra Costa County Habitat
Conservation Plan and Natural
Community Conservation Plan,
Implementation, Incidental Take
Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa
County, CA, Comment Period Ends:
10/17/2005, Contact: Sheila Larsen
916–444–6600.
EIS No. 20050352, Final Supplement,
NPS, WA, Elwha River Ecosystem
Restoration Implementation Project,
Update Information, Olympic
Peninsula, Challam County, WA, Wait
Period Ends: 10/03/2005, Contact:
Brian Winter 360–565–1320.
EIS No. 20050353, Draft EIS, FHW, NY,
Willis Avenue Bridge Reconstruction,
Proposing Reconstruction of 100-year
old Willis Avenue Bridge over the
Harem River between Manhattan and
the Bronx, New York and Bronx
Counties, NY, Comment Period Ends:
10/28/2005, Contact: Robert Arnold
518–431–4125.
EIS No. 20050354, Draft EIS, UAF, 00,
Shaw Air Base Airspace Training
Initiative (ATI), 20th Fighter Wing
Proposal to Modify the Training
Airspace Overlying Parts, South
Carolina and Georgia, Comment
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Period Ends: 10/17/2005, Contact:
Linda A. DeVine 757–764–9434.
EIS No. 20050355, Draft EIS, COE, LA,
Port of Iberia Project, To Determine
the Feasibility of Deepening the
Existing Navigation Channels between
the POI and the Gulf of Mexico,
Portions of the Gulf Intracoastal
Waterway (GIWW) and Freshwater
Bayou (FWB), LA, Comment Period
Ends: 10/17/2005, Contact: Michael
Salyer 504–862–2037.
EIS No. 20050356, Draft EIS, FRC, TX,
Port Arthur Liquefield Natural Gas
(LNG) Project, Construction and
Operation, U.S. Army COE Section 10
and 404 Permits, (FERC/EIS–0182D),
Jefferson and Orange Counties TX and
Cameron, Calcasieu and Beauregard
Parishes, LA, Comment Period Ends:
10/17/2005, Contact: Thomas Russo
1–866–208–FERC.
Amended Notices
EIS No. 20050342, Draft EIS, NOA,
00, Consolidated Atlantic Highly
Migratory Species Fishery Management
Plan for Atlantic Tunas, Swordfish, and
Shark and the Atlantic Billfish Fishery
Management Plan, Implementation,
Atlantic Coast, Caribbean and Gulf of
Mexico, Comment Period Ends: 10/18/
2005, Contact: Karyl Brewster Geisz
301–713–2347 Revision of Notice
Published in FR: 08/19/2005. Correction
to Comment Period from 10/03/2005 to
10/18/2005.
Dated: August 30, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–17541 Filed 9–1–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6667–1]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (EDP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050168, ERP No. D–BLM–
L65484–AK, East Alaska Draft Resource
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 70, Number 170 (Friday, September 2, 2005)]
[Notices]
[Pages 52379-52380]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4818]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2216-066]
New York Power Authority; Notice of Application Tendered for
Filing With the Commission, Notice of Offer of Settlement, and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
August 26, 2005.
Take notice that the following hydroelectric application and offer
of settlement have been filed with the Commission and are available for
public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2216-066.
c. Date Filed: August 18, 2005 for application; August 19, 2005 for
offer of settlement.
d. Applicant: New York Power Authority.
e. Name of Project: Niagara Power Project, which consists of the
Lewiston Pump Generating Plant and the Robert Moses Niagara Power
Plant.
f. Location: The Niagara Power Project is located on the Niagara
River in the City of Niagara Falls and the Towns of Niagara and
Lewiston, in Niagara County, New York.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Frederick E. Chase, Executive Director of
Hydropower Relicensing, Power Authority of the State of New York, 30
South Pearl Street, Albany, NY 12207-3425, (518) 433-6738 or
chase.f@nypa.gov.
i. FERC Contact: Steve Kartalia, (202) 502-6131 or
stephen.kartalia@ferc.gov.
j. Cooperating agencies: We are asking Federal, state, local, and
tribal agencies with jurisdiction and/or special expertise with respect
to environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing such requests
described in item k below. Cooperating agencies should note the
Commission's policy that agencies that cooperate in the preparation of
the environmental document cannot also intervene. See, 94 FERC ] 61,076
(2001).
k. Deadline to request cooperating agency status: September 19,
2005.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Requests for cooperating agency status may be filed electronically
via the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
l. This application has not been accepted for filing. We are not
soliciting motions to intervene, protests, or final terms and
conditions at this time. However, a number of entities filed motion to
intervene prior to the application being filed in this case. Although
these motions must be rejected because there was no proceeding in which
to intervene when they were filed, once an application has been filed,
the Commission does accept motions to intervene filed before public
notice of the application being accepted is issued (see 75 FERC ]
61,318).
m. Description of Project: The existing project has a conventional
development and a pumped storage development for a total current
installed capacity of 2,538 megawatts consisting of: (a) Two 700-foot-
long intake structures located on the upper Niagara River about 2.6
miles upstream from the American Falls; (b) two 4.3-mile-long, 46-foot-
wide by 66.5-foot-high concrete underground water supply conduits; (c)
a forebay; (d) the 974-foot-long by 240-foot-wide by 160-feet-high
Lewiston Pump-Generating Plant; (e) the 1,900-acre Lewiston Reservoir
at a maximum water surface elevation of 658 feet United States Lake
Survey Datum; (f) the Robert Moses Niagara power plant, including an
1,100-foot-long by 190-foot-wide by 100-foot-high intake structure; (g)
a switch yard; and (h) appurtenant facilities.
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
o. Procedural schedule and final amendments: At this time we
anticipate preparing a draft environmental impact statement (DEIS).
Recipients will have 45 days to provide the Commission with any written
comments on the DEIS. All comments filed with the Commission will be
considered in the final environmental impact statement (FEIS). The
application will be processed according to the following schedule.
Revisions to the schedule will be made as appropriate.
Notice of Acceptance of Application: October 2005.
Notice of Application Ready for Environmental Analysis: December 2005.
[[Page 52380]]
Notice of the Availability of the DEIS: May 2006.
Notice of the Availability of the FEIS: November 2006.
Ready for Commission's decision on the application: February 2007.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E5-4818 Filed 9-1-05; 8:45 am]
BILLING CODE 6717-01-P