San Diego Gas & Electric Company, Complainant, v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator and the California Power Exchange, Respondents; Investigation of Practices of the California Independent System Operator and the California Power Exchange; Notice Granting Extension of Time, 52373 [E5-4813]
Download as PDF
Federal Register / Vol. 70, No. 170 / Friday, September 2, 2005 / Notices
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4810 Filed 9–1–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL00–95–000 and EL00–98–
000]
San Diego Gas & Electric Company,
Complainant, v. Sellers of Energy and
Ancillary Services Into Markets
Operated by the California
Independent System Operator and the
California Power Exchange,
Respondents; Investigation of
Practices of the California Independent
System Operator and the California
Power Exchange; Notice Granting
Extension of Time
August 26, 2005.
1. On August 25, 2005, IDACORP
Energy L.P. (IDACORP), on behalf of ‘‘a
substantial number’’ of participants
attending the August 25, 2005 Technical
Conference 1 held in the abovecaptioned proceeding, filed a Joint
Motion for Adjustment to Filing Date for
Cost Filings (Motion). The August 8,
2005 Order on Cost Recovery, Revising
Procedural Schedule for Refunds, and
Establishing Technical Conference 2
requires cost filings to be filed ‘‘no later
than September 10, 2005.’’ 3 Movants
request an extension of the cost filing
deadline until September 14, 2005, to
take into account the guidance provided
by Staff at the Technical Conference.
Movants further request action on the
Motion before receipt of any answer to
the motion, given the short time frame
for preparing cost filing submissions,
1 IDACORP states that parties joining in or not
opposing this request include: Avista Energy, Inc.,
BP Energy Company, California PX, Constellation
Energy Commodities Group, Inc., Coral Power,
L.L.C., IDACORP Energy, L.P., NEGT Energy
Trading-Power, L.P., Portland General Electric
Company, Powerex Corp., Public Service Company
of New Mexico, Puget Sound Energy, Inc., Sempra
Energy Trading Corp., TransAlta Energy Marketing
(CA) Inc., TransAlta Energy Marketing (US) Inc.,
Golden Energy Services, APX, and AEPCO
(collectively, ‘‘Movants’’). Motion at 1. IDACORP
states that it makes no representations on behalf of
the California Parties, but is authorized by all other
parties attending the August 25, 2005 Technical
Conference to request this extension.
2 San Diego Gas & Electric Co. v. Sellers of Energy
and Ancillary Services, 112 FERC ¶ 61,176 (2005).
3 Id. at Ordering Paragraph (D).
VerDate Aug<18>2005
18:00 Sep 01, 2005
Jkt 205001
52373
FPL Energy MH 50, LP; FPL Energy New
Mexico Wind, LLC; FPL Energy North
Dakota Wind, LLC; FPL Energy North
Dakota Wind II, LLC; FPL Energy
Oklahoma Wind, LLC; FPL Energy
Power Marketing, Inc.; FPL Energy
Seabrook, LLC; FPL Energy Sooner
Wind, LLC; FPL Energy South Dakota
Magalie R. Salas,
Wind, LLC; FPL Energy Vansycle, LLC;
Secretary.
FPL Energy Wyman, LLC; FPL Energy
[FR Doc. E5–4813 Filed 9–1–05; 8:45 am]
Wyman IV, LLC; FPL Energy Wyoming,
BILLING CODE 6717–01–P
LLC; FPLE Rhode Island State Energy,
L.P.; Gray County Wind Energy, LLC;
Hawkeye Power Partners, LLC; High
DEPARTMENT OF ENERGY
Winds, LLC; Jamaica Bay Peaking
Facility, LLC; Lake Benton Power
Federal Energy Regulatory
Partners II, LLC; Meyersdale
Commission
Windpower LLC; Mill Run Windpower,
LLC; North Jersey Energy Associates,
Combined Notice of Filings #1
L.P.; Northeast Energy Associates, a
August 29, 2005.
Limited Partnership; Pennsylvania
Take notice that the Commission
Windfarms, Inc.; POSDEF Power
received the following electric rate
Company, LP; Somerset Windpower,
filings.
LLC; Waymart Wind Farm, L.P., and
Docket Numbers: ER97–1781–001.
Florida Power & Light Company.
Applicants: Strategic Power
Description: The above-referenced
Management Inc.
applicants submit revised tariff sheets to
Description: Strategic Power
reflect a correction to the Market
Management Inc., in compliance with
Behavior Rules.
the Commission’s order issued 5/31/05
Filed Date: 08/12/2005.
(112 FERC ¶ 61,175 (2005)), submits
Accession Number: 20050824–0224.
statement indicating that it is wholly
Comment Date: 5 p.m. eastern time on
without market power and submits
Friday, September 8, 2005.
revisions to its market-based rate tariff.
Docket Numbers: ER04–691–060;
Filed Date: 08/23/2005.
EL04–104–057; ER04–106–015.
Accession Number: 20050825–0232.
Applicant: Midwest Independent
Comment Date: 5 p.m. eastern time on
Transmission System Operator, Inc.
Tuesday, September 13, 2005.
Description: Midwest Independent
Docket Numbers: ER02–2559–005;
ER01–1071–006; ER02–669–006; ER02– Transmission System Operator, Inc.
submits proposed revisions to its Open
2018–006; ER01–2074–006; ER05–222–
Acess Transmission and Energy Markets
002; ER00–2391–006; ER98–2494–010;
ER00–3068–006; ER05–487–001; ER04– Tariff, FERC Electric Tariff, Third
Revised Volume 1 in compliance with
127–003; ER03–34–005; ER98–3511–
the Commission’s Orders issued 6/21/05
010; ER02–1903–005; ER99–2917–007;
ER03–179–006; ER03–1104–002; ER03– (111 FERC ¶ 61,448 (2005)) and 8/6/04
1105–002; ER03–1332–002; ER98–3566– (108 FERC ¶ 61,163 (2004)).
Filed Date: 08/19/2005.
013; ER02–1838–006; ER03–1333–003;
Accession Number: 20050823–0143.
ER03–1103–002; ER01–838–006; ER98–
Comment Date: 5 p.m. eastern time on
3563–010; ER98–3564–010; ER03–1025–
Friday, August 26, 2005.
003; ER02–2120–004; ER01–1972–006;
Docket Number: ER05–1194–001.
ER98–2076–009; ER03–155–005; ER03–
Applicant: Yaka Energy LLC.
623–006; ER98–4222–005; ER04–290–
Description: Yaka Energy LLC submits
001; ER01–1710–007; ER04–187–003;
ER05–236–004; ER02–2166–005; ER04– an Amendment to Petition for
Acceptance of Initial Rate Schedule,
947–004; ER01–2139–008; ER03–1375–
Waivers, and Blanket Authority filed on
002; ER97–3359–009.
7/5/05 in Docket No. ER005–1194–000.
Applicants: Backbone Mountain
Filed Date: 08/23/2005.
Windpower LLC; Badger Windpower,
Accession Number: 20050825–0231.
LLC; Bayswater Peaking Facility, LLC;
Comment Date: 5 p.m. eastern time on
Blythe Energy, LLC; Calhoun Power
Tuesday, September 6, 2005.
Company I, LLC; Diablo Winds, LLC;
Doswell Limited Partnership; ESI
Docket Number: ER05–1215–002.
Vansycle Partners, L.P.; FPL Energy
Applicant: Wholesale Electric Trading
Cape, LLC; FPL Energy Cowboy Wind,
LP.
Description: Wholesale Electric
LLC; FPL Energy Green Power Wind,
Trading LP submits an amendment to its
LLC; FPL Energy Hancock County
petition for acceptance of initial rate
Wind, LLC; FPL Energy Maine Hydro
schedule, waivers and blanket authority
LLC; FPL Energy Marcus Hook, L.P.;
and the ‘‘unexceptional nature of this
request.’’ Motion at 2.
2. Upon consideration, notice is
hereby given that an extension of time
to submit cost filings to the Commission
is granted to and including September
14, 2005, as requested.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 70, Number 170 (Friday, September 2, 2005)]
[Notices]
[Page 52373]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4813]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL00-95-000 and EL00-98-000]
San Diego Gas & Electric Company, Complainant, v. Sellers of
Energy and Ancillary Services Into Markets Operated by the California
Independent System Operator and the California Power Exchange,
Respondents; Investigation of Practices of the California Independent
System Operator and the California Power Exchange; Notice Granting
Extension of Time
August 26, 2005.
1. On August 25, 2005, IDACORP Energy L.P. (IDACORP), on behalf of
``a substantial number'' of participants attending the August 25, 2005
Technical Conference \1\ held in the above-captioned proceeding, filed
a Joint Motion for Adjustment to Filing Date for Cost Filings (Motion).
The August 8, 2005 Order on Cost Recovery, Revising Procedural Schedule
for Refunds, and Establishing Technical Conference \2\ requires cost
filings to be filed ``no later than September 10, 2005.'' \3\ Movants
request an extension of the cost filing deadline until September 14,
2005, to take into account the guidance provided by Staff at the
Technical Conference. Movants further request action on the Motion
before receipt of any answer to the motion, given the short time frame
for preparing cost filing submissions, and the ``unexceptional nature
of this request.'' Motion at 2.
---------------------------------------------------------------------------
\1\ IDACORP states that parties joining in or not opposing this
request include: Avista Energy, Inc., BP Energy Company, California
PX, Constellation Energy Commodities Group, Inc., Coral Power,
L.L.C., IDACORP Energy, L.P., NEGT Energy Trading-Power, L.P.,
Portland General Electric Company, Powerex Corp., Public Service
Company of New Mexico, Puget Sound Energy, Inc., Sempra Energy
Trading Corp., TransAlta Energy Marketing (CA) Inc., TransAlta
Energy Marketing (US) Inc., Golden Energy Services, APX, and AEPCO
(collectively, ``Movants''). Motion at 1. IDACORP states that it
makes no representations on behalf of the California Parties, but is
authorized by all other parties attending the August 25, 2005
Technical Conference to request this extension.
\2\ San Diego Gas & Electric Co. v. Sellers of Energy and
Ancillary Services, 112 FERC ] 61,176 (2005).
\3\ Id. at Ordering Paragraph (D).
---------------------------------------------------------------------------
2. Upon consideration, notice is hereby given that an extension of
time to submit cost filings to the Commission is granted to and
including September 14, 2005, as requested.
Magalie R. Salas,
Secretary.
[FR Doc. E5-4813 Filed 9-1-05; 8:45 am]
BILLING CODE 6717-01-P