Environmental Impacts Statements; Notice of Availability, 52380 [05-17541]
Download as PDF
52380
Federal Register / Vol. 70, No. 170 / Friday, September 2, 2005 / Notices
Notice of the Availability of the DEIS:
May 2006.
Notice of the Availability of the FEIS:
November 2006.
Ready for Commission’s decision on the
application: February 2007.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4818 Filed 9–1–05; 8:45 am]
of $9,016,929, (a 7.3 percent increase),
including the increase in the purchased
power adder, beginning January 1, 2006,
are needed to satisfy repayment criteria.
Page 48122, under SUPPLEMENTARY
INFORMATION, correct the second
sentence of the fourth paragraph to read:
The proposed new rates would
increase estimated annual revenues
from $124,325,100 to $133,342,029 and
would satisfy the present financial
criteria for repayment of the project and
transmission * * *.
BILLING CODE 6717–01–P
Dated: August 29, 2005.
Jon Worthington,
Assistant Administrator.
[FR Doc. 05–17501 Filed 9–1–05; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6450–01–P
Southwestern Power Administration
Integrated System Power Rates:
Correction
ENVIRONMENTAL PROTECTION
AGENCY
Southwestern Power
Administration, DOE.
ACTION: Correction to notice of proposed
rate increase.
[ER–FRL–6666–9]
AGENCY:
Southwestern Area Power
Administration published a document
in the Federal Register (70 FR 48121) on
August 16, 2005, announcing the public
review and comment period on
proposed rates. This rate proposal will
increase annual system revenues
approximately 7.3 percent from
$124,325,100 to $133,342,029.
Inadvertently, the amount of the
proposed increase for the purchased
power adder rate component ($227,100
or 0.2 percent) was not included in the
initial notice.
FOR FURTHER INFORMATION CONTACT: Mr.
Forrest E. Reeves, Assistant
Administrator, Office of Corporate
Operations, Southwestern Power
Administration, U.S. Department of
Energy, One West Third Street, Tulsa,
Oklahoma 74103, (918) 595–6696,
gene.reeves@swpa.gov.
SUMMARY:
Corrections
In the Federal Register on August 16,
2005, in FR Doc. 05–16190:
Page 48121, under SUMMARY, correct
the last sentence to read:
Beginning January 1, 2006, and
thereafter, the proposed rates would
increase annual system revenues
approximately 7.3 percent from
$124,325,100 to $133,342,029, which
includes an increase in the purchased
power adder.
Page 48122, under SUPPLEMENTARY
INFORMATION, correct the last sentence of
the third paragraph to read:
The Revised Power Repayment Study
shows that additional annual revenues
VerDate Aug<18>2005
18:00 Sep 01, 2005
Jkt 205001
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 08/22/2005 Through
08/26/2005. Pursuant to 40 CFR
1506.9.
EIS No. 20050351, Draft EIS, SFW, CA,
East Contra Costa County Habitat
Conservation Plan and Natural
Community Conservation Plan,
Implementation, Incidental Take
Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa
County, CA, Comment Period Ends:
10/17/2005, Contact: Sheila Larsen
916–444–6600.
EIS No. 20050352, Final Supplement,
NPS, WA, Elwha River Ecosystem
Restoration Implementation Project,
Update Information, Olympic
Peninsula, Challam County, WA, Wait
Period Ends: 10/03/2005, Contact:
Brian Winter 360–565–1320.
EIS No. 20050353, Draft EIS, FHW, NY,
Willis Avenue Bridge Reconstruction,
Proposing Reconstruction of 100-year
old Willis Avenue Bridge over the
Harem River between Manhattan and
the Bronx, New York and Bronx
Counties, NY, Comment Period Ends:
10/28/2005, Contact: Robert Arnold
518–431–4125.
EIS No. 20050354, Draft EIS, UAF, 00,
Shaw Air Base Airspace Training
Initiative (ATI), 20th Fighter Wing
Proposal to Modify the Training
Airspace Overlying Parts, South
Carolina and Georgia, Comment
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Period Ends: 10/17/2005, Contact:
Linda A. DeVine 757–764–9434.
EIS No. 20050355, Draft EIS, COE, LA,
Port of Iberia Project, To Determine
the Feasibility of Deepening the
Existing Navigation Channels between
the POI and the Gulf of Mexico,
Portions of the Gulf Intracoastal
Waterway (GIWW) and Freshwater
Bayou (FWB), LA, Comment Period
Ends: 10/17/2005, Contact: Michael
Salyer 504–862–2037.
EIS No. 20050356, Draft EIS, FRC, TX,
Port Arthur Liquefield Natural Gas
(LNG) Project, Construction and
Operation, U.S. Army COE Section 10
and 404 Permits, (FERC/EIS–0182D),
Jefferson and Orange Counties TX and
Cameron, Calcasieu and Beauregard
Parishes, LA, Comment Period Ends:
10/17/2005, Contact: Thomas Russo
1–866–208–FERC.
Amended Notices
EIS No. 20050342, Draft EIS, NOA,
00, Consolidated Atlantic Highly
Migratory Species Fishery Management
Plan for Atlantic Tunas, Swordfish, and
Shark and the Atlantic Billfish Fishery
Management Plan, Implementation,
Atlantic Coast, Caribbean and Gulf of
Mexico, Comment Period Ends: 10/18/
2005, Contact: Karyl Brewster Geisz
301–713–2347 Revision of Notice
Published in FR: 08/19/2005. Correction
to Comment Period from 10/03/2005 to
10/18/2005.
Dated: August 30, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–17541 Filed 9–1–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6667–1]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (EDP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050168, ERP No. D–BLM–
L65484–AK, East Alaska Draft Resource
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 70, Number 170 (Friday, September 2, 2005)]
[Notices]
[Page 52380]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-17541]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 08/22/2005
Through 08/26/2005. Pursuant to 40 CFR 1506.9.
EIS No. 20050351, Draft EIS, SFW, CA, East Contra Costa County Habitat
Conservation Plan and Natural Community Conservation Plan,
Implementation, Incidental Take Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa County, CA, Comment Period Ends: 10/
17/2005, Contact: Sheila Larsen 916-444-6600.
EIS No. 20050352, Final Supplement, NPS, WA, Elwha River Ecosystem
Restoration Implementation Project, Update Information, Olympic
Peninsula, Challam County, WA, Wait Period Ends: 10/03/2005, Contact:
Brian Winter 360-565-1320.
EIS No. 20050353, Draft EIS, FHW, NY, Willis Avenue Bridge
Reconstruction, Proposing Reconstruction of 100-year old Willis Avenue
Bridge over the Harem River between Manhattan and the Bronx, New York
and Bronx Counties, NY, Comment Period Ends: 10/28/2005, Contact:
Robert Arnold 518-431-4125.
EIS No. 20050354, Draft EIS, UAF, 00, Shaw Air Base Airspace Training
Initiative (ATI), 20th Fighter Wing Proposal to Modify the Training
Airspace Overlying Parts, South Carolina and Georgia, Comment Period
Ends: 10/17/2005, Contact: Linda A. DeVine 757-764-9434.
EIS No. 20050355, Draft EIS, COE, LA, Port of Iberia Project, To
Determine the Feasibility of Deepening the Existing Navigation Channels
between the POI and the Gulf of Mexico, Portions of the Gulf
Intracoastal Waterway (GIWW) and Freshwater Bayou (FWB), LA, Comment
Period Ends: 10/17/2005, Contact: Michael Salyer 504-862-2037.
EIS No. 20050356, Draft EIS, FRC, TX, Port Arthur Liquefield Natural
Gas (LNG) Project, Construction and Operation, U.S. Army COE Section 10
and 404 Permits, (FERC/EIS-0182D), Jefferson and Orange Counties TX and
Cameron, Calcasieu and Beauregard Parishes, LA, Comment Period Ends:
10/17/2005, Contact: Thomas Russo 1-866-208-FERC.
Amended Notices
EIS No. 20050342, Draft EIS, NOA, 00, Consolidated Atlantic Highly
Migratory Species Fishery Management Plan for Atlantic Tunas,
Swordfish, and Shark and the Atlantic Billfish Fishery Management Plan,
Implementation, Atlantic Coast, Caribbean and Gulf of Mexico, Comment
Period Ends: 10/18/2005, Contact: Karyl Brewster Geisz 301-713-2347
Revision of Notice Published in FR: 08/19/2005. Correction to Comment
Period from 10/03/2005 to 10/18/2005.
Dated: August 30, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-17541 Filed 9-1-05; 8:45 am]
BILLING CODE 6560-50-P