TransCanada Hydro Northeast Inc., Town of Rockingham, VT, Bellows Falls Power Company, LLC, Vermont Hydro-Electric Power Authority; Notice of Deadline To File Answers to Motion, 50309-50310 [E5-4666]

Download as PDF Federal Register / Vol. 70, No. 165 / Friday, August 26, 2005 / Notices 50309 interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 2, 2005. interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 2, 2005. ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 2, 2005. Linda Mitry, Deputy Secretary. [FR Doc. E5–4662 Filed 8–25–05; 8:45 am] Linda Mitry, Deputy Secretary. [FR Doc. E5–4695 Filed 8–25–05; 8:45 am] Linda Mitry, Deputy Secretary. [FR Doc. E5–4692 Filed 8–25–05; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. EL05–144–000] [Docket No. EG05–94–000] New York Independent System Operator, Inc.; Notice of Filing Sierra Wind, LLC; Notice of Application for Commission Determination of Exempt Wholesale Generator Status August 22, 2005. Take notice that on August 16, 2005, the New York Independent System Operator, Inc. filed a request for expedite action, for tariff waivers and for authorization to recalculate previously assessed persistent undergeneration charges for the period August 1, 2001 to May 31, 2002. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and VerDate jul<14>2003 16:18 Aug 25, 2005 Jkt 205001 August 22, 2005. Take notice that on August 12, 2005, 2005, Sierra Wind, LLC (Sierra) filed with the Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission’s regulations. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 [Project No. 1855–030] TransCanada Hydro Northeast Inc., Town of Rockingham, VT, Bellows Falls Power Company, LLC, Vermont Hydro-Electric Power Authority; Notice of Deadline To File Answers to Motion August 19, 2005. On January 26, 2005, as amended May 24, 2005, TransCanada Hydro Northeast Inc. (TC Hydro NE); the Town of Rockingham, Vermont (the Town); Bellows Falls Power Company, LLC (BFPC); and Vermont Hydro-Electric Power Authority (VHPA) requested Commission approval to transfer the license for the Bellows Falls Project No. 1855 from TC Hydro NE to the Town and BFPC as co-licensees and for approval of a financing plan whereby VHPA would, at closing, take title to project property and transfer it to the Town. The Town, BFPC, and VHPA filed a motion on August 10, 2005, requesting approval to substitute as a transferee/ applicant VHPA for the Town. Movants filed a supplement to their motion on August 17, 2005. The deadline for filing answers to the motion and supplement is 15 days following the filing date of E:\FR\FM\26AUN1.SGM 26AUN1 50310 Federal Register / Vol. 70, No. 165 / Friday, August 26, 2005 / Notices the supplement, or September 1, 2005. See 18 CFR 385.213(d)(1) (2005). Linda Mitry, Deputy Secretary. [FR Doc. E5–4666 Filed 8–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR05–19–000] Unocal Keystone Gas Storage, LLC; Notice of Petition for Rate Approval August 22, 2005. Take notice that on August 10, 2005, Unocal Keystone Gas Storage, LLC (Keystone) tendered for filing, pursuant to § 284.123 of the Commission’s regulations, revisions to its Operating Statement with a September 1, 2005 effective date. Keystone states that the proposed revisions serve to clarify the operating provisions and do not propose any new services or new rates. Keystone further requests a waiver of the ‘‘shipper must have title’’ policy for off-system capacity it may acquire to provide interstate storage services. Keystone also states that it will not implement its proposal to hold capacity on interconnected pipelines prior to Commission approval. Pursuant to § 284.123(b)(2)(ii), if the Commission does not act within 150 days of the date of this filing, the rates will be deemed to be fair and equitable and not in excess of an amount which interstate pipelines would be permitted to charge for similar transportation service. The Commission may, prior to the expiration of the 150 day period, extend the time for action or institute a proceeding to afford parties an opportunity for written comments and for the oral presentation of views, data, and arguments. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not VerDate jul<14>2003 16:18 Aug 25, 2005 Jkt 205001 serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 31, 2005. Linda Mitry, Deputy Secretary. [FR Doc. E5–4698 Filed 8–25–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR05–19–000] Unocal Keystone Gas Storage, LLC; Notice of Petition for Rate Approval August 22, 2005. Take notice that on August 10, 2005, Unocal Keystone Gas Storage, LLC (Keystone) tendered for filing, pursuant to section 284.123 of the Commission’s regulations, revisions to its Operating Statement with a September 1, 2005 effective date. Keystone states that the proposed revisions serve to clarify the operating provisions and do not propose any new services or new rates. Keystone further requests a waiver of the ‘‘shipper must have title’’ policy for off-system capacity it may acquire to provide interstate storage services. Keystone also states that it will not implement its proposal to hold capacity on interconnected pipelines prior to Commission approval. Pursuant to section 284.123(b)(2)(ii), if the Commission does not act within 150 days of the date of this filing, the rates will be deemed to be fair and equitable and not in excess of an amount which interstate pipelines PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 would be permitted to charge for similar transportation service. The Commission may, prior to the expiration of the 150 day period, extend the time for action or institute a proceeding to afford parties an opportunity for written comments and for the oral presentation of views, data, and arguments. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 31, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–4699 Filed 8–25–05; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\26AUN1.SGM 26AUN1

Agencies

[Federal Register Volume 70, Number 165 (Friday, August 26, 2005)]
[Notices]
[Pages 50309-50310]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4666]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1855-030]


TransCanada Hydro Northeast Inc., Town of Rockingham, VT, Bellows 
Falls Power Company, LLC, Vermont Hydro-Electric Power Authority; 
Notice of Deadline To File Answers to Motion

August 19, 2005.
    On January 26, 2005, as amended May 24, 2005, TransCanada Hydro 
Northeast Inc. (TC Hydro NE); the Town of Rockingham, Vermont (the 
Town); Bellows Falls Power Company, LLC (BFPC); and Vermont Hydro-
Electric Power Authority (VHPA) requested Commission approval to 
transfer the license for the Bellows Falls Project No. 1855 from TC 
Hydro NE to the Town and BFPC as co-licensees and for approval of a 
financing plan whereby VHPA would, at closing, take title to project 
property and transfer it to the Town.
    The Town, BFPC, and VHPA filed a motion on August 10, 2005, 
requesting approval to substitute as a transferee/applicant VHPA for 
the Town. Movants filed a supplement to their motion on August 17, 
2005. The deadline for filing answers to the motion and supplement is 
15 days following the filing date of

[[Page 50310]]

the supplement, or September 1, 2005. See 18 CFR 385.213(d)(1) (2005).

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4666 Filed 8-25-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.