Environmental Impacts Statements; Notice of Availability, 50346-50347 [05-17036]
Download as PDF
50346
Federal Register / Vol. 70, No. 165 / Friday, August 26, 2005 / Notices
Rating LO.
EIS No. 20050278, ERP No. DS–AFS–
L36113–WA, Upper Charley
Subwatershed Ecosystem Restoration
Projects, Proposing to Amend the
Umatilla National Forests Land and
Resource Management Plan to
Incorporate Management for Canada
lynx, Pomeroy Ranger District,
Umatilla National Forest, Garfield
County, WA.
Summary: EPA has no objection to the
proposed action.
Rating LO.
Final EISs
EIS No. 20050161, ERP No. F–AFS–
L65473–OR, Rogue River-Siskiyou
National Forest, Special Use Permits
for Outfitter and Guide Operations on
the Lower Rogue and Lower Rogue
and Lower Illinois Rivers, Gold Beach
Ranger District, Rogue River-Siskiyou
National Forest, Curry County, OR.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050188, ERP No. F–FTA–
C54009–00, Permanent World Trade
Center (WTC) PATH Terminal Project,
Reconstruction of a Permanent
Terminal at the WTC Site in Lower
Manhattan, Port Authority TransHudson (PATH), Several Permits
Required for Approval, The Port
Authority of New York and New
Jersey, NY and NJ.
Summary: EPA has no objections to
the proposed project.
EIS No. 20050207, ERP No. F–AFS–
L65468–00, Pacific Northwest Region
Invasive Plant Program, Preventing
and Managing Invasive Plants,
Implementation, Portions of Del Norte
and Siskiyou Counties, CA, portions
of Nez Perce, Salmon, Idaho, and
Adam Counties, ID, OR, and WA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050212, ERP No. F–AFS–
J65438–WY, Dean Project Area,
Proposes to Implement Multiple
Resource Management Actions, Black
Hills National Forest, Bearlodge
Ranger District, Sundance, Crook
County, WY.
Summary: EPA continues to express
concerns about impacts to water quality
from soil erosion, especially to streams
already not meeting designated uses and
potential adverse impacts to wildlife.
EIS No. 20050225, ERP No. F–HUD–
C85045–NY, Ridge Hill Village
Project, Construction, Comprehensive
Development Plan, (CDP), Planned
Mixed-Use Developmental District
(PMD), U.S. Army COE Section 404
Permit, City of Yonkers, Westchester
County, NY.
VerDate jul<14>2003
16:18 Aug 25, 2005
Jkt 205001
Summary: While EPA has no
objection to the proposed action, EPA
did highlight that the applicant must
comply with Transportation Conformity
and obtain a 404 permit.
EIS No. 20050280, ERP No. F–COE–
E39050–FL, Herbert Hoover Dike
Major Rehabilitation Evaluation
Study, Proposed to Reduce the
Probability of a Breach of Reach One,
Lake Okeechobee, Martin and Palm
Beach Counties, FL.
Summary: EPA had no objections to
the proposed action.
EIS No. 20050284, ERP No. F–BOP–
D80031–WV, Southern West Virginia
Proposed Federal Correctional
Institution, Four Alternatives Sites in
Southern West Virginia, Boone
County, Mingo County, Nicholas
County, and McDowell County, WV.
Summary: EPA previous issues have
been resolved, therefore, EPA has no
objection to the action as proposed.
EIS No. 20050290, ERP No. F–NOA–
L99010–AK, Pribilof Islands Setting
for the Annual Subsistence Harvest of
Northern Fur Seals, To Determine and
Publish the Take Ranges, Pribilof
Islands, AK.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050291, ERP No. F–AFS–
J65437–CO, Gold Camp Road Plan,
Develop a Feasible Plan to Manage the
Operation of Tunnel #3 and the 8.5
mile Road Segment, Pike National
Forest, Pikes Peak Ranger District,
Colorado Springs, El Paso County,
CO.
Summary: EPA continues to have
environmental concerns due to the
potential for impacts to water quality
and the lack of contingent mitigation
measures. EPA suggests that accelerated
Best Management Practices be
implemented to mitigate any further
degradation.
EIS No. 20050314, ERP No. F–AFS–
J65412–MT, Grasshopper Fuels
Management Project, Modification of
Vegetation Conditions, Reduction in
Fuel Loads and Break Up Fuel
Continuity, Beaverhead-Deerlodge
National Forest, Dillon Ranger
District, Beaverhead County, MT.
Summary: While EPA has no
objection to the proposed action, EPA
did request clarification regarding the
sharing of aquatic monitoring results.
EIS No. 20050224, ERP No. FA–FHW–
C40129–NY, NY–9A Reconstruction
Project, West Thames Street to
Chambers Street in Lower Manhattan
the Result of September 11, 2001
Attack, Lower Manhattan
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
Redevelopment, New York County,
NY.
Summary: EPA has no objections to
the proposed project.
Dated: August 23, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–17035 Filed 8–25–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6666–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/. Weekly receipt of
Environmental Impact Statements Filed
08/15/2005 Through 08/19/2005.
Pursuant to 40 CFR 1506.9.
EIS No. 20050343, Final EIS, BLM, ND,
West Mine Area, Freedom Mine,
Federal Coal Lease Application,
Mercer County, ND, Wait Period
Ends: 9/26/2005, Contact: Allen Ollila
701–227–7713.
EIS No. 20050344, Final EIS, NRC, WI,
Generic—License Renewal for Point
Beach Nuclear Plant, Units 1 and 2,
Supplement 23 to NUREG–1437 (TAC
Nos. MC2049 and MC2050), Lake
Michigan, Manitowoc County, WI,
Wait Period Ends: 09/26/2005,
Contact: Stacey Imboden 301–415–
2462.
EIS No. 20050345, Final Supplement,
BLM, NV, Ruby Hill Mine
Expansion—East Archimedes Project,
Extension of Existing Open Pit and
Expansion of Two Existing Waste
Rock Disposal Areas, Plan-ofOperations Permit, Eureka County,
NV, Wait Period Ends: 09/26/2005,
Contact: Caleb Hiner 775–635–4052.
EIS No. 20050346, Draft EIS, DOA, NV,
White Pine & Grant-Quinn Oil and
Gas Leasing Project, Exploration and
Development, Humboldt-Toiyabe
National Forest, Ely Ranger District,
White Pine, Nye and Lincoln
Counties, NV, Comment Period Ends:
10/11/2005, Contact: Loretta Cartner
775–289–5120.
EIS No. 20050347, Draft EIS, DOE, ME,
Bangor Hydro-Electric Northeast
Reliability Interconnect, Construct,
Connect, Operate and Maintain an
Electric Transmission Line, Amend
Presidential Permit (PP–89), DOE/
EIS–0372, Hancock, Penobscot and
Washington Counties, ME, Comment
E:\FR\FM\26AUN1.SGM
26AUN1
Federal Register / Vol. 70, No. 165 / Friday, August 26, 2005 / Notices
Period Ends: 10/11/2005, Contact: Dr.
Jerry Pell 202–586–3362.
EIS No. 20050348, Draft EIS, NPS, WA,
Ebey’s Landing National Historical
Reserve General Management Plan,
Implementation, Town of Coupeville,
Island County, WA, Comment Period
Ends: 12/01/2005, Contact: Rob
Harbour 360–678–6084.
EIS No. 20050349, Draft Supplement,
COE, FL, Central and Southern
Florida Project, Tamiami Trail
Modifications, Modified Water
Deliveries to Everglades National
Park, Authorized Flow of Water from
WCA–3B and the L–29 Canal North of
the Tamiami Trail, Dade County, FL,
Comment Period Ends: 10/11/2005,
Contact: Barbara Cintron 904–232–
1692.
EIS No. 20050350, Draft EIS, COE, CA,
Encinitas/Solana Beach Shoreline
Protection Project, To Protect Public
Safety and Reduce Storm-Related
Damages to Coastal Structures, Cities
of Encinitas and Solana Beach, San
Diego County, CA, Comment Period
Ends: 10/11/2005, Contact: Shannon
Dellaquila 213–452–3846.
Amended Notices
EIS No. 20050202, Draft EIS, CGD, 00,
Programmatic—Vessel and Facility
Response Plans for Oil: 2003 Removal
Equipment Requirements and
Alternative Technology Revisions, To
Increase the Oil Removal Capability,
U.S. Exclusive Economic Zone (EEZ),
United States, Alaska, Guam, Puerto
Rico and other U.S. Territories,
Comment Period Ends: 9/6/2005,
Contact: Brad McKitrick 202–267–
0995.
Revision of FR Notice Published on
05/27/2005: Extending CEQ Comment
Period Ending 8/1/2005 has been
Extended to 9/6/2005.
EIS No. 20050329, Final EIS, NPS, ID,
Craters of the Moon National
Monument and Preserve, Update and
Consolidate Management Plans, into
One Comprehensive Plan, Snake
River Plain, Butte, Blaine, Lincoln,
and Minidoka Counties, ID, Wait
Period Ends: 09/26/2005, Contact:
Adrienne Anderson 303–987–6730.
Revision of FR Notice Published on
08/12/2005: CEQ Wait Period Ending 9/
12/2005 has been Reestablished to 09/
26/2005. Due to Incomplete Distribution
of the FEIS at the time of Filing with
USEPA under Section 1506.9 of the CEQ
Regulations.
Dated: August 23, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–17036 Filed 8–25–05; 8:45 am]
50347
If only one election is held, all
principal campaign committees of
candidates in the Special General
Election shall file a 12-day Pre-General
Report on September 22, 2005; and a
Post-General Report on November 3,
2005. (See chart below for the closing
date for each report).
Unauthorized Committees (PACs and
Party Committees)
BILLING CODE 6560–50–P
FEDERAL ELECTION COMMISSION
[Notice 2005—21]
Filing Dates For the California Special
Election in the 48th Congressional
District
Federal Election Commission.
Notice of filing dates for special
election.
AGENCY:
ACTION:
SUMMARY: California has scheduled a
special general election on October 4,
2005, to fill the U.S. House of
Representatives seat in the Forty-Eighth
Congressional District vacated by
Representative Christopher Cox. Under
California law, a majority winner in a
special election is declared elected.
Should no candidate achieve a majority
vote, a special runoff election will be
held on December 6, 2005, among the
top vote-getters of each qualified
political party, including qualified
independent candidates.
Committees participating in the
California special elections are required
to file pre- and post-election reports.
Filing dates for these reports are affected
by whether one or two elections are
held.
Mr.
Kevin R. Salley, Information Division,
999 E Street, NW., Washington, DC
20463; Telephone: (202) 694–1100; Toll
Free (800) 424–9530.
SUPPLEMENTARY INFORMATION:
FOR FURTHER INFORMATION CONTACT:
Principal Campaign Committees
All principal campaign committees of
candidates who participate in the
California Special General and Special
Runoff Elections shall file a 12-day PreGeneral Report on September 22, 2005;
a Pre-Runoff Report on November 24,
2005; and a Post-Runoff Report on
January 5, 2006. (See chart below for the
closing date for each report).
Political committees filing on a
semiannual basis in 2005 are subject to
special election reporting if they make
previously undisclosed contributions or
expenditures in connection with the
California Special General or Special
Runoff Elections by the close of books
for the applicable report(s). (See chart
below for the closing date for each
report).
Committees filing monthly that
support candidates in the California
Special General or Special Runoff
Election should continue to file
according to the monthly reporting
schedule.
Disclosure of Electioneering
Communications (Individuals and
Other Unregistered Organizations)
As required by the Bipartisan
Campaign Reform Act of 2002, the
Federal Election Commission
promulgated new electioneering
communications rules governing
television and radio communications
that refer to a clearly identified federal
candidate and are distributed within 60
days prior to a special general election
(including a special general runoff). 11
CFR 100.29. The statute and regulations
require, among other things, that
individuals and other groups not
registered with the FEC who make
electioneering communications costing
more than $10,000 in the aggregate in a
calendar year disclose that activity to
the Commission within 24 hours of the
distribution of the communication. See
11 CFR 104.20.
The 60-day electioneering
communications period in connection
with the California Special General runs
from August 5, 2005 through October 4,
2005. The 60-day electioneering
communications period in connection
with the California Special Runoff runs
from October 7, 2005 through December
6, 2005.
CALENDAR OF REPORTING DATES FOR CALIFORNIA SPECIAL ELECTION
Close of books 1
Report
Reg./cert. & overnight mailing date
Filing date
If Only the Special General Is Held (10/04/05), Committees Involved Must File:
Pre-General ...............................................................................................................
VerDate jul<14>2003
16:18 Aug 25, 2005
Jkt 205001
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
09/14/05
E:\FR\FM\26AUN1.SGM
09/19/05
26AUN1
09/22/05
Agencies
[Federal Register Volume 70, Number 165 (Friday, August 26, 2005)]
[Notices]
[Pages 50346-50347]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-17036]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 08/15/2005
Through 08/19/2005. Pursuant to 40 CFR 1506.9.
EIS No. 20050343, Final EIS, BLM, ND, West Mine Area, Freedom Mine,
Federal Coal Lease Application, Mercer County, ND, Wait Period Ends: 9/
26/2005, Contact: Allen Ollila 701-227-7713.
EIS No. 20050344, Final EIS, NRC, WI, Generic--License Renewal for
Point Beach Nuclear Plant, Units 1 and 2, Supplement 23 to NUREG-1437
(TAC Nos. MC2049 and MC2050), Lake Michigan, Manitowoc County, WI, Wait
Period Ends: 09/26/2005, Contact: Stacey Imboden 301-415-2462.
EIS No. 20050345, Final Supplement, BLM, NV, Ruby Hill Mine Expansion--
East Archimedes Project, Extension of Existing Open Pit and Expansion
of Two Existing Waste Rock Disposal Areas, Plan-of-Operations Permit,
Eureka County, NV, Wait Period Ends: 09/26/2005, Contact: Caleb Hiner
775-635-4052.
EIS No. 20050346, Draft EIS, DOA, NV, White Pine & Grant-Quinn Oil and
Gas Leasing Project, Exploration and Development, Humboldt-Toiyabe
National Forest, Ely Ranger District, White Pine, Nye and Lincoln
Counties, NV, Comment Period Ends: 10/11/2005, Contact: Loretta Cartner
775-289-5120.
EIS No. 20050347, Draft EIS, DOE, ME, Bangor Hydro-Electric Northeast
Reliability Interconnect, Construct, Connect, Operate and Maintain an
Electric Transmission Line, Amend Presidential Permit (PP-89), DOE/EIS-
0372, Hancock, Penobscot and Washington Counties, ME, Comment
[[Page 50347]]
Period Ends: 10/11/2005, Contact: Dr. Jerry Pell 202-586-3362.
EIS No. 20050348, Draft EIS, NPS, WA, Ebey's Landing National
Historical Reserve General Management Plan, Implementation, Town of
Coupeville, Island County, WA, Comment Period Ends: 12/01/2005,
Contact: Rob Harbour 360-678-6084.
EIS No. 20050349, Draft Supplement, COE, FL, Central and Southern
Florida Project, Tamiami Trail Modifications, Modified Water Deliveries
to Everglades National Park, Authorized Flow of Water from WCA-3B and
the L-29 Canal North of the Tamiami Trail, Dade County, FL, Comment
Period Ends: 10/11/2005, Contact: Barbara Cintron 904-232-1692.
EIS No. 20050350, Draft EIS, COE, CA, Encinitas/Solana Beach Shoreline
Protection Project, To Protect Public Safety and Reduce Storm-Related
Damages to Coastal Structures, Cities of Encinitas and Solana Beach,
San Diego County, CA, Comment Period Ends: 10/11/2005, Contact: Shannon
Dellaquila 213-452-3846.
Amended Notices
EIS No. 20050202, Draft EIS, CGD, 00, Programmatic--Vessel and Facility
Response Plans for Oil: 2003 Removal Equipment Requirements and
Alternative Technology Revisions, To Increase the Oil Removal
Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska,
Guam, Puerto Rico and other U.S. Territories, Comment Period Ends: 9/6/
2005, Contact: Brad McKitrick 202-267-0995.
Revision of FR Notice Published on 05/27/2005: Extending CEQ
Comment Period Ending 8/1/2005 has been Extended to 9/6/2005.
EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National
Monument and Preserve, Update and Consolidate Management Plans, into
One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and
Minidoka Counties, ID, Wait Period Ends: 09/26/2005, Contact: Adrienne
Anderson 303-987-6730.
Revision of FR Notice Published on 08/12/2005: CEQ Wait Period
Ending 9/12/2005 has been Reestablished to 09/26/2005. Due to
Incomplete Distribution of the FEIS at the time of Filing with USEPA
under Section 1506.9 of the CEQ Regulations.
Dated: August 23, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-17036 Filed 8-25-05; 8:45 am]