Environmental Impacts Statements; Notice of Availability, 48704-48705 [05-16473]
Download as PDF
48704
Federal Register / Vol. 70, No. 160 / Friday, August 19, 2005 / Notices
electronic docket at 67 FR 38102 (May
31, 2002), or go to https://www.epa.gov/
edocket.
Title: NSPS for Primary and
Secondary Emissions from Basic
Oxygen Furnaces (Renewal).
Abstract: The New Source
Performance Standards (NSPS) for the
regulations published at 40 CFR part 60,
subparts N and Na were proposed on
were proposed on June 11, 1973, and
promulgated on March 8, 1974. These
regulations apply to each basic oxygen
process furnace (BOPF) in an iron and
steel plant commencing construction,
modification or reconstruction after the
date of a proposal. An opacity limit was
promulgated on April 13, 1978, as a
supplement to the mass standard. On
January 20, 1983, amendments to the
Standards of Performance for Primary
Emissions from Basic Oxygen Process
Furnaces, merged with Standards of
Performance for Secondary Emissions
from Basic Oxygen Process Steelmaking
Facilities (Subpart Na). Subpart Na is
applicable to any top-blown BOPF, hot
metal transfer station or skimming
station for which construction,
reconstruction, or modification
commenced after January 20, 1983.
The monitoring, recordkeeping, and
reporting requirements outlined in the
rule are similar to those required for
other NSPS regulations. Consistent with
the NSPS General Provisions (40 CFR
part 60, subpart A), respondents would
submit initial notifications, conduct
performance test and report test results
for the primary emission control
devices, and submit periodic reports.
Sources also must develop and
implement a Startup, Shutdown, and
Malfunction Plan (SSMP) and submit
semiannual reports of any event where
the procedures in the plan were not
followed. These notifications, reports,
and records are essential in determining
compliance, and are required of all
sources subject to NSPS. Any owner or
operator subject to the provisions of this
part shall maintain a file of these
measurements, and retain the file for at
least two years following the date of
such measurements, maintenance
reports, and records.
An agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
Control Number. The OMB Control
Numbers for EPA’s regulations are listed
in 40 CFR part 9 and 48 CFR chapter 15,
and are identified on the form and/or
instrument, if applicable.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 158 hours
VerDate jul<14>2003
16:47 Aug 18, 2005
Jkt 205001
(rounded) per response. Burden means
the total time, effort, or financial
resources expended by persons to
generate, maintain, retain, or disclose or
provide information to or for a Federal
agency. This includes the time needed
to review instructions; develop, acquire,
install, and utilize technology and
systems for the purposes of collecting,
validating, and verifying information,
processing and maintaining
information, and disclosing and
providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements; train personnel to be able
to respond to a collection of
information; search data sources;
complete and review the collection of
information; and transmit or otherwise
disclose the information.
Respondents/Affected Entities: Basic
oxygen process furnace shops at iron
and steel plants with furnaces,
skimming stations and/or hot metal
transfer stations.
Estimated Annual Number of
Respondents: 5.
Frequency of Response: Initial,
semiannual and on occasion.
Estimated Total Annual Hour Burden:
1,896 hours.
Estimated Total Annual Costs:
$179,440, which includes $18,000
annualized capital/startup costs, $8,397
annual O&M costs, and $153,043 annual
labor costs.
Changes in the Estimates: There is an
increase of 884 hours in the total
estimated burden currently identified in
the OMB Inventory of Approved ICR
Burdens. This increase is due to an
increase in the number of modified/
reconstructed sources. There is also a
small increase on the annualized cost on
the renewal of this ICR (from $25,794 to
26,397 or $603) associated with an
increase in the operation and
maintenance costs resulting from the
increase in the number of sources.
However, this increase is not reflected
in the OMB 83–I form due to rounding
of the values.
Dated: August 9, 2005.
Oscar Morales,
Director, Collection Strategies Division.
[FR Doc. 05–16482 Filed 8–18–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6666–5]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 8/08/2005 through 8/12/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050333, Final EIS, FRC, 00,
Piceance Basin Expansion Project,
Construction and Operation of a New
Interstate Natural Gas Pipeline
System, Wamsutter Compressor
Station to Interconnections
Greasewood Compressor Station, Rio
Blanco County, CO and Sweetwater
County, WY, Wait Period Ends: 09/
19/2005, Contact: Thomas Russo 1–
866–208–3372.
EIS No. 20050334, Final EIS, DOE, MT,
South Fork Flathead Watershed
Westslope Cuttroat Trout
Conservation Program, Preserve the
Genetic Purity of the Westslope
Cuttroat Trout Population, Flathead
National Forest, Flathead River,
Flathead, Powell and Missoula
Counties, MT, Wait Period Ends: 09/
19/2005, Contact: Colleen Spiering
503–230–5756.
EIS No. 20050335, Final Supplement,
AFS, MT, Gallatin National Forest,
Updated Information, Replaces the
Effects Analysis for the Northern
Goshawk in the Main Boulder Fuels
Reduction Project (FEIS),
Implementation, Gallatin National
Forest, Big Timber Ranger District,
Sweet Grass and Park Counties, MT ,
Wait Period Ends: 09/19/2005,
Contact: Barbara Ping 406–522–2558.
EIS No. 20050336, Final EIS, FAA, VA,
Washington Dulles International
Airport Project, Acquisition of Land,
Construction and Operation, IAD
2004 Airport Layout Plan (ALP),
Dulles, VA, Wait Period Ends: 09/19/
2005, Contact: Joseph Delia 703–661–
1358.
EIS No. 20050337, Final EIS, AFS, CA,
Empire Vegetation Management
Project, Reducing Fire Hazards,
Harvesting of Trees Using GroupSelection (GS) and Individual Trees
Selection (ITS) Methods, Mt. Hough
Ranger District, Plumas National
Forest, Plumas County, CA, Wait
Period Ends: 09/19/2005, Contact:
Gary Rotta 530–283–0555.
EIS No. 20050338, Final EIS, FHW, OH,
OH–823, Portsmouth Bypass Project,
Transportation Improvements,
Funding and U.S. Army COE Section
404 Permit, Appalachian
Development Highway, Scioto
County, OH, Wait Period Ends: 09/19/
2005, Contact: Dennis A. Decker 614–
280–6896.
EIS No. 20050339, Draft EIS, DOA, SD,
Deerfield Project Area, Proposes to
E:\FR\FM\19AUN1.SGM
19AUN1
Federal Register / Vol. 70, No. 160 / Friday, August 19, 2005 / Notices
Implement Multiple Resource
Management Actions, Mystic Ranger
District, Black Hills National Forest,
Pennington County, South Dakota,
Comment Period Ends: 10/03/2005,
Contact: Robert Thompson 605–343–
1567.
EIS No. 20050340, Draft EIS, AFS, UT,
West Fork Blacks Fork Allotment
Management Plan, Proposes to
Authorize Continued Livestock
Grazing, Township 1 North, Range 11
East, Salt Lake Principle Merida,
Evanston Ranger District, WasatchCache National Forest, Summit
County, UT, Comment Period Ends:
10/03/2005, Contact: Richard Zobell
307–782–6555.
EIS No. 20050341, Final EIS, COE, 00,
Arkansas River Navigation Study, To
Maintain and Improve the Navigation
Channel in Order to Enhance
Commercial Navigation on the
McCellan Kerr Arkansas River
Navigation System (MKARNS),
Several Counties, AR and Several
Counties, OK, Wait Period Ends: 09/
19/2005, Contact: Renee Wright 501–
324–6139.
EIS No. 20050342, Draft EIS, NOA, 00,
Consolidated Atlantic Highly
Migratory Species Fishery
Management Plan for Atlantic Tunas,
Swordfish, and Shark and the Atlantic
Billfish Fishery Management Plan,
Implementation, Atlantic Coast,
Caribbean and Gulf of Mexico,
Comment Period Ends: 10/03/2005,
Contact: Karyl Brewster Geisz 301–
713–2347.
Amended Notices
EIS No. 20050044, Draft EIS, BLM, WY,
Jonah Infill Drilling Project, Propose
to Expand Development of Natural
Gas Drilling, Sublette County, WY,
Comment Period Ends: 10/07/2005,
Contact: Carol Kruse 307–367–5352.
Revision of Notice Published in
Federal Register 02/11/2005: This
Comment Period is Only for the
Supplement Air Quality Information
Portion; the Comment Period will end
on 10/07/2005.
EIS No. 20050216, Draft EIS, IBR, CA,
San Luis Drainage Feature Reevaluation Project, Provide
Agricultural Drainage Service to the
San Luis Unit, Several Counties, CA,
Comment Period Ends: 9/01/2005,
Contact: Gerald Robbins 916–978–
5061. Revision of Notice Published in
Federal Register 6/03/2005:
Extending the Comment Period from
8/03/2005 to 9/01/2005.
EIS No. 20050231, Draft EIS, AFS, MT,
Gallatin National Forest, Proposed
Travel Management Plan,
Implementation, Forest Land and
VerDate jul<14>2003
16:47 Aug 18, 2005
Jkt 205001
Resource Management, Madison,
Gallatin, Park, Meagher, Sweetgrass
and Carbon Counties, MT, Comment
Period Ends: 9/02/2005, Contact:
Steve Christiansen 406–587–6750
Revision of Notice Published in
Federal Register 6/17/2005:
Extending Comment Period from 8/
01/2005 to 9/02/2005.
EIS No. 20050325, Draft EIS, AFS, WV,
Programmatic—Monongahela
National Forest Plan Revision, Proposes
to Revise Land and Resource
Management Plan, Barbour, Grant,
Greebrier, Nicholas, Pendleton,
Pocahontab, Preston, Randolph, Tucker,
Webster Counties, WV, Comment Period
Ends: 11/14/2005, Contact: Clyde
Thompson 304–636–1800.
Revision of Notice Published in Federal
Register: 8/12/2005: Correction to
Comment Period from 9/26/2005 to
11/14/2005.
Dated: August 16, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–16473 Filed 8–18–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6666–6]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in
Federal Register dated April 1, 2005 (70
FR 16815).
Draft EISs
EIS No. 20050229, ERP No. D–AFS–
L65487–0R, Blue Mountain Land
Exchange—Oregon Project, Proposed
Exchange of Federal and Non-Federal
Lands, Malheur, Umatilla, and
Wallowa-Whitman National Forests,
Baker, Grant, Morrow, Umatilla,
Union and Wallowa Counties, OR.
Summary: EPA expressed
environmental concerns about impacts
to water quality and forest habitat as
well as on the loss of dedicated old
growth and net loss of Late and Old
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
48705
Structure habitat. EPA supports the
identified prioritization of road
restoration efforts proposed for acquired
lands, but is concerned about uncertain
funding to implement restoration
efforts.
Rating EC2.
Final EISs
EIS No. 20050267, ERP No. F–NRC–
G09804–NM, National Enrichment
Facility (NEF), Construction,
Operation, and Decommission of a
Gas Centrifuge Uranium Enrichment
Facility, License Application,
NUREG–1790, near Eunice, Lea
County, NM.
Summary: No formal comment letter
was to the preparing agency.
EIS No. 20050275, ERP No. F–FHW–
F40389–WI, WI–26 State Trunk
Highway (STH) Improvements,
Janesville at IH–90 to STH–60-East
north of Watertown Road, Funding,
(Project ID 1390–04–00), Rock,
Jefferson, and Dodge Counties, WI
Summary: Many of EPA’s earlier
objections to the project have been
satisfactory addressed; however, EPA
continues to have concerns about the
proposed project because of the need for
additional refinement on compensatory
mitigation for wetlands impacts.
EIS No. 20050279, ERP No. F–NPS–
E65070–AL, Selma to Montgomery
National Historic Trail
Comprehensive Management Plan,
Implementation, Dallas, Lowndes,
and Montgomery Counties, AL.
Summary: EPA has no objections to
the preferred alternative.
EIS No. 20050302, ERP No. FC–IBW–
K24017–00, South Bay International
Wastewater Treatment Plan
(SBIWTP), To Address Treatment
Alternatives from Tijuana, Mexico
that cross into United States/Mexico
Border in San Diego County, CA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: August 16, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–16474 Filed 8–18–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–7956–6]
Science Advisory Board Staff Office;
Notification of an Upcoming Science
Advisory Board Meeting
Environmental Protection
Agency (EPA).
AGENCY:
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 70, Number 160 (Friday, August 19, 2005)]
[Notices]
[Pages 48704-48705]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-16473]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 8/08/2005 through 8/12/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050333, Final EIS, FRC, 00, Piceance Basin Expansion Project,
Construction and Operation of a New Interstate Natural Gas Pipeline
System, Wamsutter Compressor Station to Interconnections Greasewood
Compressor Station, Rio Blanco County, CO and Sweetwater County, WY,
Wait Period Ends: 09/19/2005, Contact: Thomas Russo 1-866-208-3372.
EIS No. 20050334, Final EIS, DOE, MT, South Fork Flathead Watershed
Westslope Cuttroat Trout Conservation Program, Preserve the Genetic
Purity of the Westslope Cuttroat Trout Population, Flathead National
Forest, Flathead River, Flathead, Powell and Missoula Counties, MT,
Wait Period Ends: 09/19/2005, Contact: Colleen Spiering 503-230-5756.
EIS No. 20050335, Final Supplement, AFS, MT, Gallatin National Forest,
Updated Information, Replaces the Effects Analysis for the Northern
Goshawk in the Main Boulder Fuels Reduction Project (FEIS),
Implementation, Gallatin National Forest, Big Timber Ranger District,
Sweet Grass and Park Counties, MT , Wait Period Ends: 09/19/2005,
Contact: Barbara Ping 406-522-2558.
EIS No. 20050336, Final EIS, FAA, VA, Washington Dulles International
Airport Project, Acquisition of Land, Construction and Operation, IAD
2004 Airport Layout Plan (ALP), Dulles, VA, Wait Period Ends: 09/19/
2005, Contact: Joseph Delia 703-661-1358.
EIS No. 20050337, Final EIS, AFS, CA, Empire Vegetation Management
Project, Reducing Fire Hazards, Harvesting of Trees Using Group-
Selection (GS) and Individual Trees Selection (ITS) Methods, Mt. Hough
Ranger District, Plumas National Forest, Plumas County, CA, Wait Period
Ends: 09/19/2005, Contact: Gary Rotta 530-283-0555.
EIS No. 20050338, Final EIS, FHW, OH, OH-823, Portsmouth Bypass
Project, Transportation Improvements, Funding and U.S. Army COE Section
404 Permit, Appalachian Development Highway, Scioto County, OH, Wait
Period Ends: 09/19/2005, Contact: Dennis A. Decker 614-280-6896.
EIS No. 20050339, Draft EIS, DOA, SD, Deerfield Project Area, Proposes
to
[[Page 48705]]
Implement Multiple Resource Management Actions, Mystic Ranger District,
Black Hills National Forest, Pennington County, South Dakota, Comment
Period Ends: 10/03/2005, Contact: Robert Thompson 605-343-1567.
EIS No. 20050340, Draft EIS, AFS, UT, West Fork Blacks Fork Allotment
Management Plan, Proposes to Authorize Continued Livestock Grazing,
Township 1 North, Range 11 East, Salt Lake Principle Merida, Evanston
Ranger District, Wasatch-Cache National Forest, Summit County, UT,
Comment Period Ends: 10/03/2005, Contact: Richard Zobell 307-782-6555.
EIS No. 20050341, Final EIS, COE, 00, Arkansas River Navigation Study,
To Maintain and Improve the Navigation Channel in Order to Enhance
Commercial Navigation on the McCellan Kerr Arkansas River Navigation
System (MKARNS), Several Counties, AR and Several Counties, OK, Wait
Period Ends: 09/19/2005, Contact: Renee Wright 501-324-6139.
EIS No. 20050342, Draft EIS, NOA, 00, Consolidated Atlantic Highly
Migratory Species Fishery Management Plan for Atlantic Tunas,
Swordfish, and Shark and the Atlantic Billfish Fishery Management Plan,
Implementation, Atlantic Coast, Caribbean and Gulf of Mexico, Comment
Period Ends: 10/03/2005, Contact: Karyl Brewster Geisz 301-713-2347.
Amended Notices
EIS No. 20050044, Draft EIS, BLM, WY, Jonah Infill Drilling Project,
Propose to Expand Development of Natural Gas Drilling, Sublette County,
WY, Comment Period Ends: 10/07/2005, Contact: Carol Kruse 307-367-5352.
Revision of Notice Published in Federal Register 02/11/2005: This
Comment Period is Only for the Supplement Air Quality Information
Portion; the Comment Period will end on 10/07/2005.
EIS No. 20050216, Draft EIS, IBR, CA, San Luis Drainage Feature Re-
evaluation Project, Provide Agricultural Drainage Service to the San
Luis Unit, Several Counties, CA, Comment Period Ends: 9/01/2005,
Contact: Gerald Robbins 916-978-5061. Revision of Notice Published in
Federal Register 6/03/2005: Extending the Comment Period from 8/03/2005
to 9/01/2005.
EIS No. 20050231, Draft EIS, AFS, MT, Gallatin National Forest,
Proposed Travel Management Plan, Implementation, Forest Land and
Resource Management, Madison, Gallatin, Park, Meagher, Sweetgrass and
Carbon Counties, MT, Comment Period Ends: 9/02/2005, Contact: Steve
Christiansen 406-587-6750 Revision of Notice Published in Federal
Register 6/17/2005: Extending Comment Period from 8/01/2005 to 9/02/
2005.
EIS No. 20050325, Draft EIS, AFS, WV,
Programmatic--Monongahela National Forest Plan Revision, Proposes
to Revise Land and Resource Management Plan, Barbour, Grant, Greebrier,
Nicholas, Pendleton, Pocahontab, Preston, Randolph, Tucker, Webster
Counties, WV, Comment Period Ends: 11/14/2005, Contact: Clyde Thompson
304-636-1800.
Revision of Notice Published in Federal Register: 8/12/2005: Correction
to Comment Period from 9/26/2005 to 11/14/2005.
Dated: August 16, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-16473 Filed 8-18-05; 8:45 am]
BILLING CODE 6560-50-P