Wyoming Interstate Company, Ltd.; Notice of Tariff Filing, 48115-48116 [E5-4448]

Download as PDF Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Linda Mitry, Deputy Secretary. [FR Doc. E5–4454 Filed 8–15–05; 8:45 am] [Docket No. RP96–359–027] Transcontinental Gas Pipe Line Corporation; Notice of Negotiated Rate DEPARTMENT OF ENERGY August 10, 2005. Take notice that on August 4, 2005, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing an executed copy of a second amendment to the May 4, 2001 negotiated rate service agreement under Rate Schedule FT, between Transco and Carolina Power & Light Company. Transco states that the filing is made to comply with the Commission’s July 5, 2005 order in Docket No. RP96–359– 024. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate jul<14>2003 18:02 Aug 15, 2005 BILLING CODE 6717–01–P Jkt 205001 Federal Energy Regulatory Commission [Docket No. CP05–397–000] Trunkline Gas Company, LLC; Notice of Application August 10, 2005. Take notice that on August 1, 2005, Trunkline Gas Company, LLC (Trunkline), P. O. Box 4967, Houston, Texas 77210–4967, filed in Docket No. CP05–397–000, an abbreviated application pursuant to section 7(b) of the Natural Gas Act (NGA) to abandon, by sale, a lateral consisting of approximately 7.26 miles of 10-inch pipeline located in High Island A–376, Offshore Texas, and certain laterals in Blocks 268, 269 and 281, South Marsh Island Area (North Addition), Offshore, Louisiana to the Apache Corporation. Trunkline also requests a determination under section 1(b) of the NGA the upon abandonment the subject facilities with be non-jurisdictional gathering facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may be also viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application may be directed to William W. Grygar, Vice President, Rates and Regulatory Affairs, at (713) 989–7000, Trunkline Gas Company, LLC, 5444 Westheimer Road, Houston, Texas 77056. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, before the comment date of this notice, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 48115 person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Comment Date: August 22, 2005. Linda Mitry, Deputy Secretary. [FR Doc. E5–4434 Filed 8–15–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–536–000] Wyoming Interstate Company, Ltd.; Notice of Tariff Filing August 10, 2005. Take notice that on August 4, 2005, Wyoming Interstate Company (WIC) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 2, the following tariff sheets to become effective September 5, 2005: Thirteenth Revised Sheet No. 35, Ninth Revised Sheet No. 63, Original Sheet No. 85E, Original Sheet No. 85F, Original Sheet No. 85G. WIC states that these tariff sheets are filed to establish provisions regarding the reservation of capacity for future expansion projects. E:\FR\FM\16AUN1.SGM 16AUN1 48116 Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–4448 Filed 8–15–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission listed in ascending order within each docket classification. 1. Dartmouth Power Associates Limited Partnership [Docket No. EC05–117–000] Take notice that on August 2, 2005, Dartmouth Power Associates Limited Partnership (Dartmouth Power) submitted an application requesting authorization under section 203 of the Federal Power Act of a disposition of jurisdictional facilities that would result from the proposed indirect transfer of 100 percent of the interests in Dartmouth Power to Morris Energy Group, LLC, or its wholly-owned subsidiary. Dartmouth Power states that it is a public utility within the meaning of section 201(e) of the Federal Power Act. Comment Date: 5 p.m. Eastern Time on August 23, 2005. 2. Ameren Services Company on behalf of Ameren Energy Development Company, Ameren Energy Marketing Company, AmerenEnergy Medina Valley Cogen, L.L.C., and Electric Energy Inc. [Docket No. EC05–118–000] Take notice that on August 5, 2005, Ameren Services Company (Ameren Services), on behalf of Ameren Energy Development Company (AED), Ameren Energy Marketing Company (AEM), AmerenEnergy Medina Valley Cogen (No. 4), L.L.C. (Medina Valley), and Electric Energy, Inc. (EEI) (collectively, AED, AEM, Medina Valley and EEI are also referred to as Applicants), submitted an application pursuant to section 203 of the Federal Power Act, and Part 33 of the Commission regulations, 18 CFR Part 33, requesting all Commission authorizations and approvals necessary for AED to receive as a contribution from Ameren Energy Resources Company (AER) all of AER’s stock ownership in AEM, and EEI, and through its acquisition of AmerenEnergy Medina Valley Cogen, (No. 4) L.L.C. (Medina No. 4), indirect ownership of Medina Valley. Ameren Services states that this filing have been served on all affected state commissions. Comment Date: 5 p.m. Eastern Time on August 26, 2005. Dartmouth Power Associates Limited Partnership, et al.; Electric Rate and Corporate Filings 3. Boston Generating, LLC, Mystic I, LLC, Mystic Development, LLC, Fore River Development, LLC, Tyr Energy, LLC, K Road BG Management, EBG Holdings, LLC and K Road BG LLC August 9, 2005. [Docket No. EC05–119–000] The following filings have been made with the Commission. The filings are On August 5, 2005, Boston Generating, LLC (Boston Generating) [Docket No. EC05–117–000, et al.] VerDate jul<14>2003 18:02 Aug 15, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 and its three wholly-owned subsidiaries, Mystic I, LLC, Mystic Development, LLC, and Fore River Development, LLC (Project Companies), Tyr Energy, LLC (Tyr), K Road BG Management LLC (K Road BG Management), EBG Holdings, LLC (EBG) and K Road BG LLC (‘‘K Road BG’’) (collectively, Applicants), submitted a request for authorization pursuant to Section 203 of the Federal Power Act for a change in control of Boston Generating’s Project Companies by the replacement of the current asset manager, Tyr, with a new asset manager, K Road BG Management; to the extent required, authorization for the indirect disposition of jurisdictional assets as a result of certain proposed changes in the ownership, management and scope of operations of EBG; blanket authorization for certain categories of future transfers or changes of ownership or control of membership interests in EBG. Comment Date: 5 p.m. Eastern Time on August 26, 2005. Standard Paragraph Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (19 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protests to the Federal Energy Regulatory Commission, E:\FR\FM\16AUN1.SGM 16AUN1

Agencies

[Federal Register Volume 70, Number 157 (Tuesday, August 16, 2005)]
[Notices]
[Pages 48115-48116]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4448]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP05-536-000]


Wyoming Interstate Company, Ltd.; Notice of Tariff Filing

August 10, 2005.
    Take notice that on August 4, 2005, Wyoming Interstate Company 
(WIC) tendered for filing as part of its FERC Gas Tariff, Second 
Revised Volume No. 2, the following tariff sheets to become effective 
September 5, 2005:

Thirteenth Revised Sheet No. 35,
Ninth Revised Sheet No. 63,
Original Sheet No. 85E,
Original Sheet No. 85F,
Original Sheet No. 85G.

    WIC states that these tariff sheets are filed to establish 
provisions regarding the reservation of capacity for future expansion 
projects.

[[Page 48116]]

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4448 Filed 8-15-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.