Paiute Pipeline Company; Notice of Motion To Place Suspended Rates and Tariff Sheets Into Effect, 48111-48112 [E5-4441]
Download as PDF
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4442 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–535–000]
Northern Natural Gas Company; Notice
of Tariff Filing
August 10, 2005.
Take notice that on August 4, 2005,
Northern Natural Gas Company
(Northern) tendered for filing to become
part of its FERC Gas Tariff, Fifth Revised
Volume No. 1, the following tariff sheets
proposed to be effective on May 1, 2005
and June 1, 2005 as follows:
3 Revised Substitute 70 Revised Sheet No.
53,
1 Revised Substitute 71 Revised Sheet No.
53,
2 Revised Substitute 71 Revised Sheet No.
53.
Northern states that the above tariff
sheets are being filed to incorporate the
tariff language addressing the rate
treatment for the Waterville storage
point, approved by the Commission in
Docket No. RP05–229–000, effective
May 1, 2005, into the tariff sheets
containing the settlement rates in
Docket Nos. RP03–398–000 and RP04–
155–000, effective May 1, 2005, and the
tariff sheets containing Northern’s fuel
and unaccounted for percentages
approved by the Commission in Docket
No. RP05–296–000, effective June 1,
2005.
Northern further states that copies of
the filing have been mailed to each of
its customers and interested State
Commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4447 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–163–002]
Paiute Pipeline Company; Notice of
Motion To Place Suspended Rates and
Tariff Sheets Into Effect
August 10, 2005.
Take notice t hat on July 29, 2005,
Paiute Pipeline Company (Paiute) filed
a motion pursuant to section 4(e) of the
Natural Gas Act and section 154.206(a)
of the Commission’s regulations to make
effective on August 1, 2005 the rates and
the tariff sheets that were previously
accepted and suspended, subject to
refund and hearing, in connection with
Paiute’s application for general rate
relief in Docket No. RP05–163–000. As
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
48111
part of its motion, Paiute has tendered
for acceptance Fourteenth Revised Sheet
No. 10 of Second Revised Volume No.
1–A of its FERC Gas Tariff, to be
effective August 1, 2005.
Paiute indicates that in order to
comply with the requirements of section
4(e) of the Natural Gas Act and sections
154.206(a) and 154.303(c)(2) of the
Commission’s regulations, as well as the
Commission’s February 28, 2005
suspension order in this proceeding,
Paiute is submitting its motion for filing
(1) to revise the rates proposed in its
application in this proceeding to reflect
the exclusion of costs associated with
facilities which will not be placed in
service as of July 31, 2005; and (2) to
move to place the revised rates and
other previously accepted and
suspended tariff sheets into effect.
Paiute states that it has served a copy
of this filing upon each person
designated on the official service list
compiled by the Secretary in this
proceeding, and upon all affected
customers and interested state
regulatory commissions.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\16AUN1.SGM
16AUN1
48112
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
Protest Date: 5 p.m. Eastern Time on
August 17, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4441 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL05–139–000]
Public Utility District No. 1 of
Snohomish County, Washington v.
Enron Power Marketing, Inc.; Notice of
Filing
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time on
September 6, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4429 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
August 9, 2005.
Take notice that on August 5, 2005,
the Public Utility District No. 1 of
Snohomish County, Washington filed a
Petition for an Order Pursuant to the
Commission’s Exclusive Jurisdiction
Declaring that a Termination Payment
Charged by Enron Power Marketing, Inc.
is Unjust, Unreasonable, Contrary to the
Public Interest and/or Not Permitted
under a Rate Schedule, or in the
Alternative, Complaint Against Enron
Power Marketing, Inc., pursuant to
sections 205, 206, 306 and 309 of the
Federal Power Act, 16 U.S.C. 824d,
824e, 825e and 825h, section 1290
(Relief For Extraordinary Violations) of
the Energy Policy Act of 2005, and
Rules 206 and 207 of the Federal Energy
Regulatory Commission’s Rules of
Practice and Procedure, 18 CFR 385.206
and 385.207.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214) on
or before 5 p.m. Eastern time on the
specified comment date. Anyone filing
a motion to intervene or protest must
serve a copy of that document on the
Complainant. Respondent’s answer and
all interventions, or protests must be
filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. RP04–91–005 and RP05–104–
002]
Questar Pipeline Company; Notice of
Compliance Filing
August 10, 2005.
Take notice that on August 4, 2005,
Questar Pipeline Company (Questar),
tendered for filing as part of its FERC
Gas Tariff, First Revised Volume No. 1
and Original Volume No. 3, to be
effective as indicated for each tariff
sheet:
First Revised Volume No. 1
First Revised Thirty-Third Revised
Sheet No. 5, effective June 1, 2005. First
Revised Substitute Thirty-Fourth
Revised Sheet No. 5, effective June 21,
2005. First Revised Substitute ThirtyFifth Revised Sheet No. 5, effective July
25, 2005. First Revised Fifteenth
Revised Sheet No. 5A, effective June 1,
2005. First Revised Sixteenth Revised
Sheet No. 5A, effective June 21, 2005.
First Revised Seventeenth Revised Sheet
No. 5A, effective July 25, 2005.
Original Volume No. 3
First Revised Fortieth Revised Sheet
No. 8, effective June 1, 2005. First
Revised Forty-First Revised Sheet No. 8,
effective August 15, 2005.
On June 17, 2005, Questar filed an
uncontested offer of settlement to
resolve all issued raised in these
proceedings concerning Questar’s Fuel
Gas Reimbursement Percentage (FGRP).
The Commission’s July 26 order
approved the settlement and directed
Questar to file tariff sheets within ten
days to implement the tariff provisions
consistent with the settlement. Questar
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
states that this filing was submitted in
compliance with the Commission’s
directives.
In the intervening time period
between the June 1, 2005, effective date
of the settlement and the present time,
additional tariff sheets have been filed
in separate proceedings that contain the
previous FGRP of 2.6 percent. This
filing proposes to also submit
conforming changes to those sheets
consistent with the July 26 order. These
revised tariff sheets will contain
effective dates according to the
proceedings in which they originated
and will include the new FGRP of 2.1
percent and a corresponding footnote
explaining the FGRP provisions.
Questar states that copies of this filing
were served upon Questar’s customers,
the Public Service Commission of Utah
and the Public Service Commission of
Wyoming.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4440 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16AUN1.SGM
16AUN1
Agencies
[Federal Register Volume 70, Number 157 (Tuesday, August 16, 2005)]
[Notices]
[Pages 48111-48112]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4441]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-163-002]
Paiute Pipeline Company; Notice of Motion To Place Suspended
Rates and Tariff Sheets Into Effect
August 10, 2005.
Take notice t hat on July 29, 2005, Paiute Pipeline Company
(Paiute) filed a motion pursuant to section 4(e) of the Natural Gas Act
and section 154.206(a) of the Commission's regulations to make
effective on August 1, 2005 the rates and the tariff sheets that were
previously accepted and suspended, subject to refund and hearing, in
connection with Paiute's application for general rate relief in Docket
No. RP05-163-000. As part of its motion, Paiute has tendered for
acceptance Fourteenth Revised Sheet No. 10 of Second Revised Volume No.
1-A of its FERC Gas Tariff, to be effective August 1, 2005.
Paiute indicates that in order to comply with the requirements of
section 4(e) of the Natural Gas Act and sections 154.206(a) and
154.303(c)(2) of the Commission's regulations, as well as the
Commission's February 28, 2005 suspension order in this proceeding,
Paiute is submitting its motion for filing (1) to revise the rates
proposed in its application in this proceeding to reflect the exclusion
of costs associated with facilities which will not be placed in service
as of July 31, 2005; and (2) to move to place the revised rates and
other previously accepted and suspended tariff sheets into effect.
Paiute states that it has served a copy of this filing upon each
person designated on the official service list compiled by the
Secretary in this proceeding, and upon all affected customers and
interested state regulatory commissions.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed on or before the date as indicated below. Anyone filing a
protest must serve a copy of that document on all the parties to the
proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
[[Page 48112]]
Protest Date: 5 p.m. Eastern Time on August 17, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4441 Filed 8-15-05; 8:45 am]
BILLING CODE 6717-01-P